ML16342B131

From kanterella
Jump to navigation Jump to search
Forwards Briefing Package for Consideration at Full Power Licensing Hearing Scheduled for 850730.W/o Encl
ML16342B131
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/23/1985
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Palladino, Roberts
NRC COMMISSION (OCM)
References
NUDOCS 8508010351
Download: ML16342B131 (4)


Text

f LO !

I Docket No.:

50-323 L

', 'I JUL 2 3'885

-0 MEMORANDUM FOR:

Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:

SUBJECT:

William J. Dircks Executive Director for Operations DIABLO CANYON UNIT 2 FULL-POWER BRIEFING Consideration of full-power licensing of Diablo Canyon Unit 2 is presently scheduled for July 30, 1985.

The staff briefed the Commission on April 23, 1985 regarding the issuance of the Diablo Canyon Unit 2 low-power license.

Provided for your use is a copy of the Diablo Canyon Unit 2 briefing package, which includes:

l.

2.

3.

Briefing slides for full-power briefing Low-Power License DPR-81 Proposed Full-Power License Operating experience during the period of the Low-Power License The staff is preparing a safety evaluation in support of Unit 2 full-power operation which will be provided to you.

Enclosures:

As stated cc:

SECY OPE OGC CONTACT:

H. Schierling, X-27100 DISTRIBUTION

~L'RC PDR Local PDR EDO Reading ORB¹3 Reading HSchierling JLee LB¹3:DL

  • JLee 7/16/85 (SiZnad) williamJ. Dircks William J. Dircks Executive Director for Operations NRR 8508010351 850723 PDR ADOCK 05000323 P

PDR TRehm HDenton DEisenhut HThompson JMeltemes, AEOD

JMartin, Reg.

V LB¹3: DL

  • HSchier
  • Previously concurred:

NRR QS5

  • HDenton WDirc s 7/22/85 7'85 LB¹3:DL AD/L:DL D:DL NRR ing:

h

  • GKnighton
  • TNovak
  • HThompson DEisenhut 7/16/85 7/17/85 7/19/85 7/19/85 7/

/85

J I

r~

r j(

4 ll

'yc 1

1 1

O.

I iJ d

j 7

1 l

4

(

+r

.f

Docket No.:

50-323 MEMORANDUM FOR:

Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:

William J. Dircks Executive Director for Operations Consideration of full-power licensing of Diablo Canyon Unit 2 is presently scheduled for July 30, 1985.

The staff briefed the Commission on April 23, 1985 regarding the issuance of the Diablo Canyon Unit 2 low-power license.

Provided for your~ se is a copy of the iablo Canyon Unit 2 briefing package, which includes:

1.

Briefing slid for full-wer briefing 2.

Low-Power Licen e DPR-8 3.

Proposed Full-Po er Li ense 4.

Operating experie e

uring the period of the Low-Power License The staff is preparing a

afe y evaluation in support of Unit 2 full-power operation which will be rovi d to you.

Enclosures:

As stated cc:

SECY OPE OGC William J. Dircks Executive Director for Operations CONTACT:

H. Schierling, X-27100 DISTRIBUTION NRC PDR Local PDR EDO Reading ORB¹3 Reading HSchierling JLee LB¹3:

JLee 7/(

~ /85 NRR TRehm HDenton DEisenhut HThompson JHeltemes, AEOD

JMartin, Reg.

V LB¹3:DL L

3:D HSchier i

dh GKnighton 7/ f$85 7/)g/85 NRg lA 7/

85 AD/

DQ/

D: DL TNova8" HTho pson 7/)g/85 7/P/85 OELD WDircks 7/

/85 NRR DEisenhut 7/

/85

N I

I I

(

I c~

~

0 f

P

'I N

I'I'

'1 0

l1'