ML16342B131
| ML16342B131 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/23/1985 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Asselstine, Palladino, Roberts NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8508010351 | |
| Download: ML16342B131 (4) | |
Text
f LO !
I Docket No.:
50-323 L
', 'I JUL 2 3'885
-0 MEMORANDUM FOR:
Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:
SUBJECT:
William J. Dircks Executive Director for Operations DIABLO CANYON UNIT 2 FULL-POWER BRIEFING Consideration of full-power licensing of Diablo Canyon Unit 2 is presently scheduled for July 30, 1985.
The staff briefed the Commission on April 23, 1985 regarding the issuance of the Diablo Canyon Unit 2 low-power license.
Provided for your use is a copy of the Diablo Canyon Unit 2 briefing package, which includes:
l.
2.
3.
Briefing slides for full-power briefing Low-Power License DPR-81 Proposed Full-Power License Operating experience during the period of the Low-Power License The staff is preparing a safety evaluation in support of Unit 2 full-power operation which will be provided to you.
Enclosures:
As stated cc:
SECY OPE OGC CONTACT:
H. Schierling, X-27100 DISTRIBUTION
~L'RC PDR Local PDR EDO Reading ORB¹3 Reading HSchierling JLee LB¹3:DL
- JLee 7/16/85 (SiZnad) williamJ. Dircks William J. Dircks Executive Director for Operations NRR 8508010351 850723 PDR ADOCK 05000323 P
PDR TRehm HDenton DEisenhut HThompson JMeltemes, AEOD
- JMartin, Reg.
V LB¹3: DL
- HSchier
- Previously concurred:
NRR QS5
- HDenton WDirc s 7/22/85 7'85 LB¹3:DL AD/L:DL D:DL NRR ing:
h
- GKnighton
- TNovak
- HThompson DEisenhut 7/16/85 7/17/85 7/19/85 7/19/85 7/
/85
- J I
r~
r j(
4 ll
'yc 1
1 1
O.
I iJ d
j 7
1 l
4
(
+r
.f
Docket No.:
50-323 MEMORANDUM FOR:
Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech FROM:
William J. Dircks Executive Director for Operations Consideration of full-power licensing of Diablo Canyon Unit 2 is presently scheduled for July 30, 1985.
The staff briefed the Commission on April 23, 1985 regarding the issuance of the Diablo Canyon Unit 2 low-power license.
Provided for your~ se is a copy of the iablo Canyon Unit 2 briefing package, which includes:
1.
Briefing slid for full-wer briefing 2.
Low-Power Licen e DPR-8 3.
Proposed Full-Po er Li ense 4.
Operating experie e
uring the period of the Low-Power License The staff is preparing a
afe y evaluation in support of Unit 2 full-power operation which will be rovi d to you.
Enclosures:
As stated cc:
SECY OPE OGC William J. Dircks Executive Director for Operations CONTACT:
H. Schierling, X-27100 DISTRIBUTION NRC PDR Local PDR EDO Reading ORB¹3 Reading HSchierling JLee LB¹3:
JLee 7/(
~ /85 NRR TRehm HDenton DEisenhut HThompson JHeltemes, AEOD
- JMartin, Reg.
V LB¹3:DL L
3:D HSchier i
- dh GKnighton 7/ f$85 7/)g/85 NRg lA 7/
85 AD/
DQ/
D: DL TNova8" HTho pson 7/)g/85 7/P/85 OELD WDircks 7/
/85 NRR DEisenhut 7/
/85
N I
I I
(
I c~
~
0 f
P
'I N
I'I'
'1 0
l1'