ML16342B097

From kanterella
Jump to navigation Jump to search
Documents Allegation Review Board 840716 Meeting Re Attachments 1 & 15 to Gap 840621 Petition.Resolution of Allegations Not Required Prior to Issuance of Unit 1 Full Power OL
ML16342B097
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/20/1984
From: Hernandez G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8502150514
Download: ML16342B097 (2)


Text

NUCLEAR REGULATORY COV,VlSSlOM REGION V 1450 th'ARIA LANL,SUITE 210 WALNUT CREEK, CALIFORNIA94506

~UL 20

>984 MEMORANDUM TO:

File

/DESIGNS.TED ORNQIAL FROM:

SUBJECT:

~Cer4iflel 13y G. Hernandez, Reactor Inspector

~

~

MEETING OF ALLEGATION REVIEW BOARD ON GAP PETITION DATED JUNE 21,

1984, ATTACHMENT NOS.

1 AND 15 On July 16,

1984, the Allegation Review Board met to review Attachment Nos.

1 and 15 to the GAP Petition dated June 21, 1984.

The board determined that Attachment No.

1 contained seven safety-related allegations and Attachment No.

15 is an affidavit describing the character and competence of one of the allegers.

The Board also. determined that the allega-tions were similar to previously received allegations and that none of the allegations would require resolution prior to issuance of the Diablo Canyon Unit No.

1 full power license.

The allegations contained in Attachment No.

1 were categorized and entered into the Region V Allegation Tracking System as Allegation Nos.

1403, 1404,
1405, 1406, 1407.
1408, and 1409-The GAP Petition (dated June 21, 1984) was originally provided on June 21, 1984, to the NRC without Attachment Nos.

1 and 15.

The Board consisted of G. Hernandez and D. F. Kirsch.

cc:

T.

W. Bishop D.

F. Kirsch G.

Hernandez Hernandez eactor Inspector

~5021505g4 8

05000275 PDR ADacK" 8407iO PDR

P

)I