ML16342B084
| ML16342B084 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/24/1985 |
| From: | Holloway C NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML16341D089 | List: |
| References | |
| NUDOCS 8502010660 | |
| Download: ML16342B084 (4) | |
Text
Docket No. 50-323 uN 3 4 1ees RISIRI "~ION N ENCLOSURE R
Docke le 50-323 CJHolloway; LFMB w/encl.
1
- RMDiggs, LFMB w/encl.
1
- DWeiss, LFMB w/encl.
1 LSolander, NRR w/encl.
1
- MKaltman, NRR w/encl.
1 HSchierling, NRR w/encl.
1
- JLee, NRR w/encl.
1 Manpower File LFMB R/F MEMORANDUM FOR:
Files THRU:
FROM:
SUBJECT:
ltilliam 0. Hiller, Chief, License Fee Management
- Branch, ADH C.
James Holloway, Jr., Assistant Chief, License Fee Management
- Branch, ADH DIABLO CAlIYON 2 OPERATING LICENSE REVIEW COSTS 10 CFR 170 of the Comission's regulations for license fees was revised effective June 20, 1984.
Section 170.12(b) of the revised rule provides that for applications for operating license (OL) review which have been pend-ing with the Commission for six months or longer, the first bill for accumulated review costs would be sent to the applicant at the time the rule becomes effective and at six-month intervals thereafter until the review is completed, whichever is earlier.
The first bills for OL review will include applicable professional staff review time expended through June 23. 1984, and contractual support services expended to Hay 31, 1984.
Subsequent bills cover-ing six-month reviews will be issued approximately ninety days after the end of each six-month period which closes in December and June of each year.
In accordance with Section 170.12(b),
we have reviewed the cost incurred by the various program offices directly involved in the processing the Diablo Canyon 2 operating license.
Attached is a summary of the review costs as we'l as the supporting documentation from the program offices.
The attachment shows that a total of $1,654,879 was expended through June 23, 1984 for the OL review.
8502010hh0 850124 PDR
- DOCK 05000323 A
Enclosure:
Summary of costs and supporting documentation
, iig0~8y, 8'i
~j 0'd t;. y0meS C. James Holloway. Jr.. Assistant Chief License Fee Management Branch Office of Administration OPPICC~
IURNAMC~
DATC~
LFMB:
M CJ oway:
1/p
/85 LFMB:ADM L....NOHi ler.
1/g.
/85 NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY
t I
P 0
I I
U g
4 II
s PACIFIC GAS
& ELECTRIC COMPANY OPERATIILICENSE REVIEW COSTS, THROUGH Jl 23, 1989 I
FAClLlTY:
DIABLO CANYON 2 DOCKET NO.:
50-323 Program Off)ce Rev1ew Costs Per Professional Staff-hour Profess)onal Staff-hours
~Kd d Staff-hour Costs Contractual Total Costs Costs 1.
NRR 11,712.3
$456,780
$883,537
$1,340,31?
2.
IE-Hq 36 None 26,594 26,594 3.
REGIONS 4
ACRS 36 50
?>105.0 320 255,780 16,000 255,786 16,000 5.
NNS5 38 426. 0 16>188 16',18)
Tot>1 Cost:
S;ggq,gag,
0
,r~ <
N