ML16342A630
| ML16342A630 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 12/30/1998 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9901060160 | |
| Download: ML16342A630 (10) | |
Text
~y,8 RECT fp
~4 0
Cy O
IlA
+a*++
r UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011-8064
. DEC 30,l998 NOTICE OF LICENSEE MEETING Name of Licensee:
Name of Facility:
Docket:
Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
Pacific Gas and Electric Company Diablo Canyon 50-275; 50-323 January 15, 1999 2 p.m. (PST)
Embassy Suites Hotel 333 Madonna Road San Luis Obispo, CA 93401 To discuss results of an independent site culture survey, followed by public comment Ellis Merschoff, Regional Administrator Bill Bateman, Director, Project Directorate IV-2, Office of Nuclear Reactor Regulation Russ Wise, Senior Allegations Coordinator Ken Brockman, Director, Division of Reactor Projects (DRP)
Linda Smith, Acting Chief, Project Branch E, DRP Dave Proulx, Senior Resident Inspector, DRP Breck Henderson, Public Affairs Officer Greg Rueger, Senior Vice President and General Manager Larry Womack, Vice President Nuclear Technical Services Dave Oatley, Vice President Operations Bill,Crockett, Manager, Nuclear Quality Services Jim Tomkins, Manager, Nuclear Safety Assessment and Licensing Bruce Terrell, Employee Concerns Program Supervisor NOTES:
(1)
This meeting is open to attendance by members of the general public and includes an opportunity for public comment not to exceed 5 minutes in length per person.
Members of the public wishing to comment need to sign in with the NRC Public Affairs Officer prior to the start of the public comment period.
990i060i60 98i230 PDR ADOCK 05000275 P
i l
Pacific Gas & Electric Company
- (2)
NRC personnel, not listed above, that desire to attend this meeting should notify Linda Smith at (817) 860-8137 by COB on January 11, 1998.
Approved B:
Thomas P. G nn, Dir r
Division of Reac roj ts CC:
Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B32 77 Beale Street, 32nd Floor P.O. Box 770000 San Francisco, California 94177 Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 SaCramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman BurnshMr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940
Pacific Gas & Electric Company Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
Pacific Gas 8 Electric Company DEC 30 l998 E-Mail To:
(
)
PMNS JKR PAB FJM BWS BAB2 SDB1 OEMAIL DLP CAH GFS BWH JAC1, CJG LAT, DLF CLG, LMB, NLH CMS, WSW PDP LPL FOR NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR Steve Bloom, Project Manager, NRR D/OE Dave Proulx, Senior Resident Inspector C. A. Hackney, RSLO G. F. Sanborn, EO B. Henderson, PAO RA Secretaries DRP Division DRS Division DNMS Division Dean Papa P. Longdo CC:
DMB (IE 45)
OEDO RIV Coordinator (1 6E1 5)
ORA File RIV File DOCUMENTNAME':+DC)DC1-15MN.DRP To receive co 'fdocument, Indicate In box:
C ~
without enclosures E" = Co with enclosures "N"~ No co RIV:SPE:DRP/E AC:DRP/E NRR PAO RSLO GAPick;df frfrn LJSmith SDB!oom 'W Henderson CAHackne 12/9o/98 < ~~ I 12/
/98 D:DRP TPG nn 12/SD /98 OFFICIALRECORD COPY 12P.,o /98 W
12/4o /98 1
/98
Pacific Gas 8 Electric Company DEC 30 I998 E-Mail To:
(
)
PMNS JKR PAB FJM BWS BAB2 SDB1 OEMAIL DLP CAH GFS BWH JAC1, CJG LAT, DLF CLG, LMB, NLH CMS, WSW PDP LPL cc:
FOR NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR Acting ADP/NRR Steve Bloom, Project Manager, NRR D/OE Dave Proulx, Senior Resident Inspector C. A. Hackney, RSLO G. F. Sanborn, EO B. Henderson, PAO RA Secretaries DRP Division DRS Division DNMS Division Dean Papa P. Longdo OEDO RIV Coordinator (16E15)
ORA File RIV File DOCUMENT NAME: R:+DC>DC1-15MN.DRP To receive co of document, Indlceto In box: 'C' Co w{thout enclosures 'E' Co vith enctosures 'N" a No pc~
RIV:SPE:DRP/E GAPick;df 12'98 D:DRP TPG nn 12/~9 /98 AC:DRP/E LJSmith 12/ee /98 NRR SDBloom 12/>/98 ~-~ I PAO BWHenderson 12/
/98 RSLO CAHackne
/98 OFFICIALRECORD COPY 060049
1