EN-90-015:on 900213,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued Based on Three Violations Re Containment Sump Operability
ML16341F556
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/08/1990
From: Lieberman J, Troskoski W
NRC OFFICE OF ENFORCEMENT (OE)
To:
References
EA-89-241, EN-90-015, EN-90-15, NUDOCS 9002230095
Download: ML16341F556 (4)


Text

gC CKMRA,TED Dl BUTION DE MONSTR>

ON SYSTEM I ~>

REGULATO INFORMATION DISTRIBUTION EM (RIDS)

ACCESSION NBR:9002230095 DOC.DATE: 90/02/08 NOTARIZED: NO'OCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION TROSKOSKX,W.

Ofc of Enforcement (Post 870413)

LXEBERMAN,J.

Ofc of Enforcement (Post 870413)

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

EN-90-015:on 900213,notice of proposed imposition of civil penalty in amount of 850,000 will be issued to licensee.

based on DISTRIBUTION CODE:

IE33D COPIES RECEIVED:LTR 8 ENCL 2 SIZE: I TITLE: Enforcement Notice (EN)

NOTES:

RECIPIENT XD CODE/NAME INTERNAL: AEOD/DOA DEDRO NRR/DREP/PEPB9D NUDOCS-ABSTRACT OE FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME AEOD/DSP/TPAB NRR/DOEA/OEAB11 NRR/PMAS/ILRB12 0

EG FILE NRC PDR COPIES LTTR ENCL NCTE XO ALL 'RIIE" RECXPIENIS:

PLEASE HELP US 'IO.REDOCE HASTE!

CGNZACT 'IHE DOCXlMEÃZ CGÃIBOL DESK, BDCN Pl-37 (EXT. 20079)

KO XZaIMQCQR KKR MHE FBCH DISTRIBUTXCN LISTS PDR DOCUMEMZS KXJ DONPT NEED!

0 TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL 13 D

S

0

February 8, 1990 EN 90-015 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:

Pacific Gas 8 Electric Company (EA 89-241)

Diablo Canyon Docket Nos.

50-275 and 50-323

Subject:

'PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $50,000 will be issued on or about February 13, 1990 to Pacific Gas 8 Electric Company.

This action is based on three violations relating to Containment Sump operability.

The violations concerned the failure to take adequate corrective actions for gaps in the sumps trash screens identified in 1985, opening sump access hatches on a number of occasions for time periods exceeding technical specification limits and the failure to ao adequate surveillance inspection resulting in operation with debris inside the sump screens.

The civil penalty was escalated 50% because the NRC identified the problem of debris in the Unit 1 sump and raised questions concerning the as-built screen configuration.

Due to the licensee's good over-all-past performance, the civil penalty was mitigated 50K.

No other factors:

were deemed applicable to this case.

It shouId be noted that the licensee has not been specifically informed of the enforcement action.

The schedule of issuance and notification is:

Hailing of Notice Telephone Notification of Licensee The State of Calitornia will be notified.

February 13, 1990 February 13, 1990 The licensee has thirty days from the date of the Notice in which to respond.

Followirg NRC evaluation of the response',

the civil penalty may be remitted, mitigated, or imposed by Order.

Contact:

M. Troskoski, OE, 23281 Distribution J. Lieberman, OE, 20741 OMFN ~g a Chairman Carr Comm. Roberts Comm.

Rogers Comm. Curtiss Comm.

Remick SECY OCA GPA SP OHPH ~oo EDO DEDR DEDS OE NMSS NRR OI OGC HHBB (: oo PHIL f," o o OC IRM AEOD Op Ctr Regional Offices MAIL RI / o o RIV /: 0 <

ADH: Doc. Mgt. Br.

RII ~o~

RV /: o o POR AORS RIII s: oo RES OIG PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNOUNCED 9002230095 900208 PDR XSE EN-90-015 PNV