Text
~p,g Rangy 1p0
~E
,p
++*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 NOTICE OF SIGNIFICANT MEETING JUN 9
1987 Name of Licensee:
Pacific Gas and Electric Company Name of Facility:
Diablo Canyon Units 1 and 2
Docket No.:
Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
50-275 and 50-323 June 22, 19S7 at 9:00 a.m.
Region V Office, Walnut Creek, California Management Meeting and Enforcement Conference to Discuss Licensee Performance J.
B. Martin, Regional Administrator J.
L. Crews, Senior Reactor Engineer D. F. Kirsch, Director, Division of Reactor Safety and Projects MI. M. Mendonca, Chief, Reactor ProjectsSection I J.
F. Burdoin, Project Inspector P.
P. Narbut, Senior Resident Inspector M. L. Padovan, Resident Inspector C. M. Trammell, Project Manager, NRR F. A. Wenslawski, Chief, Emergency Preparedness and Radiological Branch G. A. Maneatis, President, PGKE J.
D. Shiffer, Vice President, Nuclear Power Generation S.
M. Skidmore, gA Manager R.
C. Thornberry, Plant Manager J.
A. Sexton, Plant Superintendent J.
M. Gisclon, Assistant Plant Manager for Technical Services B. S.
Lew, Director, Nuclear Regulatory Affairs NOTE:
Attendance at this meeting by NRC personnel other than those listed above should be made known by June 15,
- 19S7, 12:00 noon via a telephone call to M. M. Mendonca, FTS 463-3720.
Distribution:
J.
Mi. Taylor, EDO
- Director, PMAS, NRR D. Crutchfield,
- DRSP, NRR J.
Par tlow, DRIS, NRR R. Starostecki, ADT, NRR J. Lieberman, OE, EDO J. Goldberg, GC G. Knighton,
- PD5, NRR F. Hebdon, ILRB, NRR C. Trammell, PM NRR NRC Attendees 870b230112 970b09 PDR ADOCII, 05000275
%P PDR
AGENDA ENFORCEMENT CONFERENCE AND MANAGEMENT MEETING ON DIABLO CANYON 1 5 2 ON LICENSEE PERFORMANCE JUNE 22, 1987 AT 9:00 A.M.
OPENING REMARKS J.
B. Martin, Regional Administrator LICENSEE'S PRESENTATION ON RECENT EVENTS J.
D. Shiffer, Vice President Nuclear Power Generation Exam les of Poor Disci line, Professionalism and Attitude Containment ventilation isolation (May 26, 1987) due to source check on wrong radidation monitor while distracted by telephone.
ISC techs hookup to wrong unit for SSPS work on May 25, 1987.
IEC tech's failure to stop for instructions on inadequate loop test resulted in diesel start May 14, 1987.
Operators failure to stop on divergent RCS level indications results in RHR vortexing May 12, -1987.
Failure to check clearance by several licensed operators resulted in a spill to charging pump room May 8, 1987.
Use of inappropriate wording on annuniciator by operators April 19, 1987.
Flame heated RHR pipe without management involvement April 1987.
Operator commenced turbine rollup contrary to policy of no significant activities during shift brief Reactor trip resulted March 3, 1987.
Exam les of Miscommunications due to Informalit A disconnect between procedure and training for mid-loop operations was observed by inspectors May 29, 1987.
Inoperable underfrequency relay was incorrectly maintained as operable April 19, 1987.
Failure to communicate intent of flame heating RHR line as a test of the process April 1987.
For loss of RHR on April 10, 1987, operations was not informed of LLRT
- start, there was conflicting directions-to operator for RVLIS and SG manway verification, and the turnover of prior shift vortexing was incomplete.
Unit 2 reactor trip on failure to communicate implications of rollup of tur bine on auxiliary feedwater system March 5, 1987.
gC and mechanical maintenance failed to communicate on problem with auxiliary feedwater pump slinger ring February 1987.
Failure to Follow Procedures ISC technicians failed to follow procedural precaution on inoperable underfrequency relay April 19, 1987.
Operators failed to follow procedure on RCS level resulted in a long-term loss of RHR April 10, 1987.
Inade uate Root Cause Evaluation Inadequate follow-up on breaker or instrument power supply on CVI May 15, 1987.
Fuse failure that caused-Node 3 reactor trip Nay 11, 1987, not adequately followed-up.
Inadequate corrective action for shorting radiation monitor that resulted in CVI Nay 10, 1987.
Failure related to ualit Or anizations gC involvement in flame heating RHR pump inadequate April 1987.
gC on RVLIS inadequate for April 10, 1987 loss of RHR event.
Re ortin Failures Failure to report in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> diesel start of May 14, 1987.
Failure to initially identify miscommunication as a contributing factor in LER on March 5, 1987 reactor trip.
CLOSIHG REMARKS J.
B. Martin, Regional Administrator
~
'