UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT UNIT 2 DOCKET NO. 50-323 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 12 License No.
DPR-82 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pacific Gas 5 Electric Company (the licensee),
dated March 17,
- 1987, as supplemented May 6, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
870bi802i0 870bi2 PDR ADQCK 05000323 P
1
2.
Accordingly, paragraph 2.C.(9) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
(9)
Steam Generator Tube Ru ture Anal sis SSER 31 Section 4.25)
By April 1988, PGSE shall submit for NRC review and approval an analysis which demonstrates that the steam generator tube rupture (SGTR) analysis presented in the FSAR is the most severe case with respect to the release of fission products and calculated doses.
Consistent with the analytical assumptions, PGRE shall propose all necessary changes to the Technical Specifications (Appendix A) to this license.
3.
This license amendment becomes effective at the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Date of Issuance:
June 12, 1987 2Nd George Knighton,f irector Proiect Directorath V