ML16341D905
| ML16341D905 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/03/1986 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML16341D906 | List: |
| References | |
| NUDOCS 8610150215 | |
| Download: ML16341D905 (4) | |
Text
October 3, 1986 Docket No. 50-275
,DISTRIBUTION Dennis F. Kirsch, Director Division of Reactor Safety and Projects NRC PDR F. Rinaldi Region V
Local PDR S. Aloot PD¹3 Rdg.
P. Narbut FROM:
Steven A. Varga, Director CVogan Project Directorate ¹3 LChandler Division of PWR Licensing-A HSchierling SVarga M. Mendonca NRR EVALUATION OF REINSTALLATION OF ORIGINAL SPENT FUEL RACKS AT DIABLO CANYON UNIT 1 DJeng K. Johnston RBallard MEMORANDUM FOR'UBJECT:
Your memorandum of September 8,
1986 (Kirsch to Holahan) requested NRR to evaluate the reinstallation of the original spent fuel racks, as modified, into the Diablo Canyon Unit 1 spent fuel pool.
Your memorandum of September 24, 1986 (Kirsch to Holahan) requested NRR to evaluate certain as-measured welds.
NRR staff has completed its evaluation of both aspects as documented in the enclosed evaluation.
We conclude that the changes to the racks, the method of reinstallation, and the as-measured welds are acceptable and do not require a
change to the license for Unit 1 or a change to the Technical Specifications.
This completes our action on this matter.
If you need additional information, please contact H. Schierling at (301) 492-8856.
Enclosure:
As stated
- SEE PREVIOUS CONCURRENCE Steven A. Varga, Director Project Directorate
¹3 Division of PWR L'icensing-A PD¹3 CVogan*
10/
/86 PD¹3 HSchierling*
10/
/86 P
ar 10 86 8610150215 861003 ,
't t
5 uM~~hue~+>
+ ~~ma P
\\
Ii
'I eC
Docket No. 50-275 FROM:
DISTRIBUTION MEMORANDUM FOR:
Dennis F. Kirsch, Director
~o Division of Reactor Safety and Projects NRC PDR F. Rinaldi Region V
Local PDR S. Aloot PD¹3 Rdg.
P. Narbut Thomas M. Novak, Acting Director CVogan Division of PWR Licensing-A HSchierling SVarga M. Mendonca
SUBJECT:
NRR EVALUATION OF REINSTALLATION OF ORIGINAL SPENT FUEL RACKS AT DIABLO CANYON UNIT 1 DJeng K. Johnston RBallard LChandler Your memorandum of September 8,
1986 {Kirsch to Holahan) requested NRR to evaluate the reinstallation of the original spent fuel racks, as modified, into the Diablo Canyon Unit 1 spent fuel pool.
Your memorandum of September 24,
'986 (Kirsch to Holahan) requested NRR to evaluate certain as-measured welds.
NRR staff has completed its evaluation of both aspects as documented in the enclosed evaluation.
We conclude that the changes to the racks, the method of reinstallation, and the as-measured welds are acceptable and do not require a
change to the license for Unit 1 or a change to the Technical Specifications.
This completes our action on this matter.
Enclosure:
As stated Thomas M. Novak, Acting Director Division of PWR Licensing-A P083 0 PD83 CVogan,~V HSchier ing
) Q/g/86 10/2./86 P
P E
P
-A D
g RB lard Va g
C si
/
86 1 /
86 10
/86 10
/86 D.
W -A 10
/86
~r E
lt J
V' f
Pl c