GVG 9 199)
MEMORANDUM FOR:
DCAP Pile PROM:
SUBJECT:
Allegation Review Board ALLEGATION REVIE< BOARD-MEETING Date of Meeting: August 6, 1985 Facilities:
Diablo Canyon Units 1 and 2
An Allegation Review Board comprised of, the below identified individuals was convened on August 6, 1985, to,disposit'ion several allegations.
OI memorandums of July 25, 1985, indicated that the below identified inquiries and associated allegation numbers were being administratively closed and resolved by OI.
OI CASE NO.
Q5-85-025 Q5-85-036
/
ALLEGATION NOS.
- 1191, 1192, 1193, 1194 1588 ATS NO.
RV-84-A-069 RV-84-A-115 ALLEGATION NOS.
- 1191, 1192, 1193
& 1194 t
The Board has reviewed again, the response to these allegations provided by PG&E letter DCL-84-239.
The licensee again responded to these issues in PG&E letter DCL-85-212, which the Board reviewed.
The Board considers that there is no technical reason to warrant reopening these allegations on a technical basis.
The Board further considers that the responses provided by the licensee to these issues are acceptable from a technical nature.
The Office of Investigation has determined that the issues of harassment and bribery do not warrant expenditure of Office of Investigation resources due to the extreme age of issues involved (1971 and 1972 time frame) and other OI investigations of harassment and intimidation are scheduled for investigation in the future.
The Board also notes that on-going inspections of the Diablo Canyon facility of civil structural work, during the period in question, did not identify any findings of sufficient import to result in any responsible questions regarding concrete and reinforcing steel installation adequacy in safety-related structures.
- Further, the Board does not consider that there is any reason to ask Office of Investigation to pursue these matters further.
These allegations are closed.
'S082701VS 8@080m PDR
- DOCK 05000275 P
PDR lt
(
<<<<l 4
Vga J
v Mud ')
fj ~
pl g
l ~ I, 1
M, j
'I M
M
'I M
I M
g Y ~
V MI
'4 h
u 4
I<I MM ff 4 MP J
).) ~ <f I
4 4
M I
'n',
M,I)P 1
MMI r
".)Iu ffu'1
!<Mt ) << l<t 4 u
'I",",'M:'),
~
,Mp
~'
A(LNGAZLON NO.
1588 I
Based on the alleger's inability,to provide any specifics during the interviews'ith Office of Investigation, and the general nature of t'e allegation the Board concluded no further action is necessary.
This action is closed.
ALLEGATION NO." 1712 6 1713' I
The Board c'onsiders this allegation is closed, based upon the staff's previous 'resolution of this issue documented in Inspection Report No. 50-275/84-42.
ALLEGATION NO.
1714 This is a duplicate of 1190 which was previously closed, based upon the Board's review of PGM letter DCL-84-239 and DCL-85-212.
The issues are the same.
The Boardconsiders that this allegation is closed.
8 F
The board determined that the above allegations are closed.
D. F. Kirsch R. A. Necks OI Advisor to the Board D. B. Pereira ho lenberger Legal Advisor to the Board A. E.
Ch fee cc:
DCS ATS No. RV-84-A-069 ATS No. RV-84-A-115 DCAF ABM File D. F. Kirsch ATS
'No. RV-85-A>>999