Discusses Allegation Review Board 850730 Meeting Re Exam & Disposition of Listed Allegations.All Allegations Closed
ML16341D380
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/30/1985
From: Burdoin J, Chaffee A, Dodds R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8508270114
Download: ML16341D380 (4)


Text

)

~S RECu>

~(p ~-

gp' op Q A

)

0p C

Vlp p

~o~

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 July 30, 1985 MEMORANDUM POR:

Pile PROM:

SUBJECT:

Allegation Review Board DIABLO CANYON ALLEGATION REVIEW BOARD MEETING, An Allegation Review Board, comprised of the below listed individuals, was convened on July 26, 1985, to examine and disposition the below listed items as follows:

1)

Alle ation No. 0794 (RV-84-A-064) "Trust" Was Used To Verif Work Was Done To S ecifications, Not Alwa s Observation.

Based on inspections to date, there is no evidence to substantiate this allegation.

This allegation lacks specificity.

Allegation CLOSED.

2)

Alle ation No.

1108 (RV-84-A-064 PTGC Durin S stem Testin s There Were Some Nice Pla in With Pi ures To Be Able To Make The Thin s Look Like It Is Workin Lack of specificity.

Examination of prior testing data has not indicated any substance for allegation.

Allegation CLOSED.

3)

Alle ation No.

1610 (RV-84-A-115 Persons Leavin Plant Durin Bomb Threat Were Told Their Jobs Were In Jeo ard Management decision, this allegation does not raise safety concern nor does it indicate intimidation or harassment.

Allegation CLOSED.

4)

Alle ation No.

1623 (RV-84-A-115) In June,

1983, A Securit Guard Pointed His Automatic Wea on At Six Machinists At The Load Center Near Intake Structure And Took One At Gun oint After Some Incident.

Not Sure NRC Was Told About This.

No interest.

Allegation CLOSED.

5)

Alle ation 1658 (RV-85-A-010)

Em lo ee Of Securit Service Contractor Alle ed Misconduct Of DCPP Nuclear Plant 0 erator.

Misconduct alleged does not relate to a nuclear safety concern and involves off-shift behavior and not a matter of NRC jurisdiction.

Allegation CLOSED.

8508270114 850730 PDR ADQCK-05000275 i.P

~ 'DR P

f V

'I t

k A

)

Allegation Review Board Meeting 6)

Alle ation No.

0793 (RV-84-A-064) Drawin s, Weld Procedures, S ecifications Were Outdated Or Not Com lete.

Review of transcript indicates that this is not a specific allegation.

Also, our contractor inspected approximately 250 pipe supports to verify the.'modification resulting from the licensee's seismic reanalyzes program and did not identify any significant deficiencies with respect to outdated or incomplete procedures, specification or drawings.

7)

, Allegation CLOSED.

r I

Alle ation No.

1022 (ATS-RV-84-A064)

C De artment Not Pro erl Dis osi'tionin Red;(Hold)'a s.

Same as Allegat'ion No'. 279.

Dispositioned in report No. 50-275/84-11.

Procedure amended to clarify management controls regarding hold tag placement., Allegation CLOSED.

8)

Alle ation 'No. 0220 (RV-84-A-"045) Electrical Su ort Weldin Documentation Doesn't Exist For~ Problems.

l'he alleger also provided this concern to the licensee's "quality hotline".

Following the li'censee's investigation into this concern, the findings were presented to the alleger who agreed that this concern can be closed.

Allegation CLOSED.

9) 10)

Alle ation No. 0221 (RV-84-A-045) Betashield Hold Ta s Removed.

The alleger also turned this concern into the licensee's "quality hotline".

The licensee, following their investigation presented their findings to the alleger who was satisfied with the results of the investigation.

Allegation CLOSED.

Alle ation No.

1021 (RV-84-A-064 Falsification Of Han er Documentation NRR's evaluation of allegations 55, 79 and 82 for the adequacy of the small bore pipe support analysis and acceptance of licensee corrective action satisfies the concerns of this allegation.

Allegation CLOSED.

Alle ation No.

1313 (RV-84-A-071 The 1/24/84 and 2/15/84 Polic Was Used To Block Hardware Problems From Bein Redlined Onto The As-Built Drawin s Close Allegation No.

1313 based on PG&E's response provided by DCL-84-343 dated October 30,

1984, and that our review of the as-built program has not disclosed any significant oblems.

R. T. Dod s Burdo n,

A. Joh un, Enforcement Officer cco Allegation File Chief, Engineering Section

1 a

~

i,

}f d lh 4

~)

'I l,

IJ

~ I'lh I

h I

<<11, hr I

I,.I hilt I

I h

il f

1 I

4

) ')'

h'>.,-'

h

'\\

I t

R

)f

,I

8 JE'fr It r)g h I~ hg 4

'h)3)

)f h) 4, II) f) g"R I'f (g 5 h ? ~') 4 ) 1 <<f" F } '), h Wg, R,"}) ~ ) tt 1 I I I F ) R lt'4th'-. R,a Rt h 4 1 I" .I .It ~ }L4 4)' ") ~ ~I, }f" tr I lh,t ~ lh ~ ~ I ~ rl I, r1, " I),' ~ 1 r h I}hi, I}Ij,' i, htf" ~ ) R If ~ lhl II )h 1 1) ~ Rh}}