Text
Docket Nos::
I 60-275 and 50-323 MEMORANDUM FOR:
H. Denton E.
Case J. Carter D. Eisenhut CU R. Purple H. Thompson R. Vollmer R. Mattson T. Speis J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia NOY 2 3 1983 distribution
~Document:Control:(50=275/323:)~
L PDR NRC PDR PRC System LB¹3 Reading JLee BBuckley HSchierling GtlKnighton
- Attorney, OELD THRU:
FROM:
SUBJECT:
George M. Knighton, Chief Licensing Branch No.
3 Division of Licensing Bart C. Buckley. Project Manager Licensing Branch No.
3 Division of Licensing DAILY HIGHLIGHT Diablo Can on, Unit 1
In-Core Flux Thimbles 5 upper vessel internals have been installed.
Control rods have been coupled and tested.
Installation of head expected to be completed
- today, November 23, 1983 and entering into operati~mal mode 5 is scheduled for, Monday, No'Wmber 28, 1983.
cc:
S. Black DL BC's Oqgga) 5/plied bgi g g. Buckle Bart C. Buckley, Project Manager Licensing Branch No.
3 Div~ision of Licensing DL
¹3 BB ckley:ft G
ghton
)( /g /83 I( /g/83 8312i2PP92 831123 PDR ADOCK 05000275 PDR
lp P
4 W'