ML16341C067

From kanterella
Jump to navigation Jump to search
Forwards Sample Format W/Instructions for Response to Allegations Evaluation
ML16341C067
Person / Time
Site: Diablo Canyon  
Issue date: 11/30/1983
From: Knighton G
Office of Nuclear Reactor Regulation
To: Parr O, Rosa F, Sheron B
Office of Nuclear Reactor Regulation
References
NUDOCS 8312090330
Download: ML16341C067 (8)


Text

NOV30 M83 MEMORANDUM FOR:

Attached List FROM:

SUBJECT:

George W. Knighton, NRR Member Diablo Canyon Allegation Management Program Staff GUIDANCE FOR PREPARATION OF THE DIABLO CANYON ALLEGATIONS EVALUATION In our memorandum of November 29, 1983, on the above subject you were advised that a standard format for responding to the allegations or concern was in preparation.

Enclosed is that format with appropriate instructions to your typist.

It is hoped that using this format and typing instructions will permit us to assemble the SER for the Commission without reprocessing your work.

If you have several allegations or concerns on the same issue you may include them on the same task evaluation sheet.

The item "Implied Significance to Plant Design, Construction or Operation" is designed to focus on the impact suggested by the allegation or concern.

The "Assessment of Safety Significance" would present your detailed assessment of the safety significance the perceived impact would have on the health and safety of the public.

This assessment should include any generic consideration of the concern applied to the plant where appropriate.

The "Staff Position" should present our regulatory position developed with respect to the allegation and should consider the impact on low power and full power licensing.

Should the "Staff Position" require specific actions to be taken to resolve the allegation or concern, the actions and the schedule necessary would be presented under "Action Required".

83i2090330 83ii30 PDR ADOCK 05000275 P

PDR

lI (I v

J!

I' 1

1 4

'I

It must be stated again, that the short review time demands quick determination of informatin needs.

We have received only limited contacts to date for information.

Enclosure:

As stated cc:

R. Mattson R. Vollmer T. Speis D. Eisenhut T. Bishop R; Houston L. Rubenstein D. Muller J. Knight W. Johnston F.

Rowsome H. Schierling

,r George

. Knighton NRR Member Diablo Canyon Allegation Management Program Staff DISTRUBUTION:

iDocument=Control=50=275/32&

NRC PDR LPDR PRC System LB¹3 Reading JLee GWKnighton HSchierling BBuckley TMNovak

p,+

'Wt 4

)

4) f
paf,

~ -+>>

  • $ p i f f gp

/fan R'p

~

T

)

'h 1

r

~

w

) 'll n

A=

I F

p,

1 1,%

t

INSTRUCTION TO TYPISTS IStart each task on a separate page.

Type all entires in letter gothic typeface.

Type all text flush to left margin (see sample format below).

Double space between all title lines (underscored titles) and text (see sample format below).

SAl'1PLE FORt1AT Task:

Allegation or Concern No.

ATS No.:

Characterization BN No.:

Start text here Im lied Siqnificance to Plant Desi n, Construction or 0 eration Start text here Assessment of Safet Siqnificance Start text here Staff Position Start text here Action Re uired Start text here

NOY 3 0 883 ADDRESSEES OTan Parr, Chief Auxiliary Systems Branch Division of Systems Integration Faust Rosa, Chief Instrumentation 8 Control Systems Branch Division of Systems Integration Brian Shearon, Chief Reactor Systems Branch Division of Systems Integration Vincent Noonan, Chief Equipment gualification Branch Division of Engineering George Lear, Chief Structural and Geotechnical Engineering Branch Division of Engineering Robert Bosnak, Chief Mechanical Engineering Branch Division of Engineering Ashok Thandani, Chief Reliability 8 Risk Assessment Branch Division of Safety Technology

E E

I