Forwards QA Program Insp Rept 99900513/82-01 on 820329-0402 & Notice of Nonconformance
ML16341B815
Person / Time
Issue date: 06/11/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Bailey F
TELEDYNE ENGINEERING SERVICES
Shared Package
ML16341B816 List:
References
REF-QA-99900513 NUDOCS 8206280455
Download: ML16341B815 (4)


Text

gg1 Iltgy 1 y ~*4 VNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE. SUITE 1000 ARLINGTON. TEXAS 76011 RN S 1 5~2.

Docket No. 99900513/82-01 Teledyne Engineering Services ATTN:

Mr. F.

C. 8ailey President 130 Second Avenue

Waltham, MA 02254 Gentlemen:

This refers to the inspection conducted by Mr. D.

F..

Fox of this office on March 29-April 2, 1982, of your facility at Waltham, Massachusetts, and to the discussion of our findings with you and members of your staff at the conclusion of the inspection.

This inspection was made as a result of concerns expressed to NRC pertaining to possible deficiencies i,n the structural analyses of the torus catwalks and piping of the Fi.t2',patrick and Vermont Yankee Nuclear Power Plants, Areas examined during this inspection and our findings are discusSed in the enclosed report.

Within these

areas, the inspection consisted of an examination of procedures and representative
records, interviews with personnel, and observations by the inspector.

During this inspection it was found that.you failed to meet certain NRC requirements.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter..

Please provide us within 30 days from the date of this letter a written statement containing:

(1) a descr'iption'of steps that have been or will be taken to correct these items; (2) a description of steps tha't have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

I

'A

I Teledyne Engineering Services The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork.Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the-Commission's regulations, a copy of this letter and the enclosed inspection report will be placed i,n the NRC's Public Document Room.'f this report contains any information that'ou believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for

,'ithholding; and (b) submit within 25 days from the date of this 1'etter a written application to this -office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days

're available for your review, please notify this office promptly so that a

new due date may be established.

Consistent with section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or. part sought to be withheld, and which contains a full statement of the reasons on the basis which it claimed that the information should be withheld

from public disclosure.

This section further requires the statement

'o address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far= as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

~pleased to discuss them with you.

Sincerely, Uldis Potapovs, Chief Vendor Programs Branch

Enclosures:

1.

Appendix A - Notice of Nonconformance 2.

Appendix 8 -= Inspection Report No. 99900513/82-01 3.

Appendix C - Inspection Data Sheets (12 pages)