ML16341B263

From kanterella
Jump to navigation Jump to search
Forwards PG&E Response to IE Bulletin 79-04
ML16341B263
Person / Time
Site: Diablo Canyon  
Issue date: 12/07/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Reinmuth W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML16340A731 List:
References
NUDOCS 7912270072
Download: ML16341B263 (2)


Text

6R

~

~I,S (4

~4 RE'gI "op1 nO UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 DEC O'I 879 MEMORANDUM FOR:

tl. Reinmuth, Division of Reactor Construction Inspection, IE:Hg FROM:

SUBJECT:

G. S. Spencer, Chief, Reactor Construction and Engineering Support Branch, Region V

IE BULLETIN 79-04 INCORRECT HEIGHTS FOR SHING CHECK VALVES MANUFACTURED BY VELAN ENGINEERING CORP.

Enclosed for your information is a copy of a reply to the subject IE Bulletin from the following licensee:

Pacific Gas and Electric Company (Diablo Canyon 1

8 2, DN's 50-275, 50-323)

Ltr. dtd 10/16/79

Enclosure:

As Stated G. S. Spencer, Chief Reactor Construction and Engineering Support Branch