ML16340E124
| ML16340E124 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/24/1984 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Buck J, Johnston W, Moore T NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP) |
| References | |
| TASK-AS, TASK-BN84-037, TASK-BN84-37 BN-84-037, BN-84-37, NUDOCS 8402090004 | |
| Download: ML16340E124 (6) | |
Text
Q~nkr~~
e ni]
Docket Nos.:
50-275 and 50-323 MEMORANDUM FOR:
Atomic Safety and Licensing Appeal Board for Diablo Canyon, Units 1 and 2
John H. Buck Thomas S. Moore W.
Reed Johnston FROM'UBJECT:
Darrell G. Eisenhut, Director Division of Licensing DIABLO CANYON -
INFORMATION ON QA CASE STUDY C
(BOARD NOTIFICATION NO.84-037)
In accordance with the NRC procedures for Board Notification the enclosed information is provided to the Board.
The enclosure is a letter from Chairman Palladino to Congressman Markey dated January 9,
1984 which provides a report from the Executive Director of Operations on matters related to the guality Assurance Case Study C for the Diablo Canyon Nuclear Power Plant.
The report itself has four enclosures, one of which (Enclosure 4)
- contains, as Attachments A through F,
a comparison between the draft and final version of Case Study C and comments on the draft version made by members of the team which performed the study.
The Case Study C Draft Working Paper and the Revised Draft Working Paper (i.e.
Final Draft) were previously provided to the Commission and to the Boards under Board Notifications83-135 (September 2, 1983) and 83-135A (October 14, 1983), respectively.
These documents were introduced by the Joint Intervenors and the staff, respectively, at the hearing on design quality assurance in November 1983.
This Board Notification with its entire enclosure is provided to the parties of the Diablo Canyon proceedings for information.
The staff does not intend to take any further specific action regarding this information.
Enclosures:
As stated Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:
See next page
- See previous concurrence.
DL:LB¹3 DL:LB¹3*
HSchierling/yt GWKnighton 2/
/84 2/
/84 DL',
GEdison DL 3
D 't 2/
/84 2
84 8402090004
0 P
cc:
Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal J.
F. Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB SECY (2)
OPE EDO OGC Parties to the Proceeding
~M
DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Units 182 Docket Nos.
50-275/323 OL Ms. Elizabeth Apfelber g Maurice Axelrad, Esq.
Mr. Richard E. Blankenburg Nr. Glenn 0. Bright Dr. John H. Buck Philip A. Crane, Jr,,
Esq.
Mr. Frederick Eissler David S. Fleischaker, Esq.
Mrs.
Raye Fleming Arthur C. Gehr, Esq.
Mr. Mark Gottlieb Mr. Lee N. Gustafson Nr. Thomas H. Harris Mr. Richard B. Hubbard Dr.
W.
Reed Johnson Janice E. Kerr, Esq.
Dr. Jerry Kline
'r. John Narrs Thomas S. Moore, Esq.
Bruce Norton, Esq.
Joel'.
- Reynolds, Esq.
Mr. James '0. Schuyler Lewis Shollenberger, Esq.
Mr. Gordon Silver Michael J.
Strumwasser, Esq.
Paul C. Valentine, Esq.
Harry N. Willis John F. Wolf, Esq ACRS Members Dr. Robert C. Axtmann Nr. Nyer Bender Dr. Max W. Carbon Nr."Jesse C. Ebersole Nr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.
Carson Mark Nr. William M. Mathis Dr.
Dade W. Noeller Dr. David Okrent
'Dr. Milton S. Plesset Mr. Jeremiah J.
Ray Dr. Paul C.
Shewmon Dr. Chester P. Siess Mr. David A. Ward Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Malcolm H. Furbush R&ident. Inspector/Diablo Canyon NPS Dr. William E.
Cooper Mr.
W.
C. Gangloff Mr. Lee M. Gustafson Dr. Jose Roesset Mr. Malcolm H. Furbush
w a
4