Docket No.:
50-275 MEMORANDUM FOR:
H. Denton E.
Case J. Carter D. Eisenhut R. Purple H. Thompson R. Vollmer R. Mattson T. Speis J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia G. Holohan DISTRIBUTION
, cDocument:Control:(50=-275)~
L PDR NRC PDR PRC System gEQ 0 9 "+~
LB83 Reading JLee HSchierling GWKnighton
- Attorney, OELD J.
P. Knight J.
Wermiel FROM:
SUBJECT:
Hans Schierling, Project Manager Licensing Branch No..3 Division of Licensing DAILY HIGHLIGHT Status of Diablo Can on Unit 1
1.
Control rod testing approximately 70K complete, I8C still.working on position indicator problem with one. drive assembly.
2.
Between 12/8/83 and 12/12/83 reactor temperature will be increased to approximately 165'.
Chemical control will be established on the primary lbop in~preparatrion..:for. heat-'.up:.and-criticalityJphash::.".
To assure positive control of oxygen, all exposed areas will be inerted with nitrogen.
3.
Condensate flush preparations are in progress and program is scheduled to start on 12/12/83.
4.
Cold system tests scheduled for completion on 12/15'/83.
Information is current as of December 8, 1983.
c S312i90096 S3f209 PDR ADOCK 05000275 PDR cc:
S.
Black.
DL B/Cs
,~"terna) s'~g~d q.
HBng $cr-.r..(;
Hans Schi erl ing, P t eject Managep Licensing Branch No. '3 Divisi'on of'i'censing DL:LBg3