Docket No.:

50-275 MEMORANDUM FOR:

H. Denton E.

Case J. Carter D. Eisenhut R. Purple H. Thompson R. Vollmer R. Mattson T. Speis J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia G. Holohan DISTRIBUTION

, cDocument:Control:(50=-275)~

L PDR NRC PDR PRC System gEQ 0 9 "+~

LB83 Reading JLee HSchierling GWKnighton

Attorney, OELD J.

P. Knight J.

Wermiel FROM:

SUBJECT:

Hans Schierling, Project Manager Licensing Branch No..3 Division of Licensing DAILY HIGHLIGHT Status of Diablo Can on Unit 1

1.

Control rod testing approximately 70K complete, I8C still.working on position indicator problem with one. drive assembly.

2.

Between 12/8/83 and 12/12/83 reactor temperature will be increased to approximately 165'.

Chemical control will be established on the primary lbop in~preparatrion..:for. heat-'.up:.and-criticalityJphash::.".

To assure positive control of oxygen, all exposed areas will be inerted with nitrogen.

3.

Condensate flush preparations are in progress and program is scheduled to start on 12/12/83.

4.

Cold system tests scheduled for completion on 12/15'/83.

Information is current as of December 8, 1983.

c S312i90096 S3f209 PDR ADOCK 05000275 PDR cc:

S.

Black.

DL B/Cs

,~"terna) s'~g~d q.

HBng $cr-.r..(;

Hans Schi erl ing, P t eject Managep Licensing Branch No. '3 Divisi'on of'i'censing DL:LBg3