ML16340E016

From kanterella
Jump to navigation Jump to search
Board Notification 84-009:forwards Info Re H Hudson,Former Vendor QA inspector,831114 Allegations Concerning Deviations from Pullman Power Products Weld Procedures & Major Breakdowns in Util Contract Specs & QA Programs
ML16340E016
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/16/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Gilinsky V, Palladino N, Roberts T
NRC COMMISSION (OCM)
Shared Package
ML16340E017 List:
References
TASK-AS, TASK-BN84-009, TASK-BN84-9 BN-84-009, BN-84-9, NUDOCS 8312120125
Download: ML16340E016 (12)


Text

Docket Nos.:

50-275 and 50-323 16 py MEMORANDUM FOR:

Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal FROM:

SUBJECT:

Darrell G. Eisenhut, Director Division of Licensing DIABLO CANYON - ALLEGATIONS CONCERNING PULLMAN POWER PRODUCTS (Board Notification No.84-009)

In accordance with the procedures for Board Notifications the enclosed letter, dated November 14, 1984, with attachment from Harold Hudson to Commissioner Gilinsky is being provided to the Commission for information.

The letter was received by this office from the Office of Investigations on December 19, 1983.

Mr. Hudson is a former gA Inspector for Pullman Power Products, a main construction contractor for the Diablo Canyon Nuclear Power Plant.

Mr. Hudson alleges deviations from Pullman Power Products weld procedures and certain major break downs in PGSE contract specifications and gA programs for the welding of pipe supports and pipe rupture restraints by Pullman Power Products at Diablo Canyon.

The staff has initiated its review and evaluation of the allegations and has included this effort in its Diablo Canyon Allegations Management Program.

The staff did not report on the allegations by Mr. Hudson in its recent report on allegations (SSER-21, dated January 4, 1984).

We will inform you of the results of our evaluation.

Contact:

H. Schierling, ONRR x27100 833.2120125 ~Q

C g) 1l 1

c r t

I h

P 4

~

1

'l P

By copy of this memorandum, we are also informing the Atomic Safety and Licensing Board and the Atomic Safety and Licensing Appeal Board.

Enclosure:

As stated cc:

J.

F; Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB T. S. Moore, ASLAB W. R. Johnson, ASLAB J.

H. Buck, ASLAB SECY (2)

OGC EDO OPE Parties to the Proceeding 9 anginal Signedbg

'ig G. p,fsexdlQC Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation SEE PREVIOUS CONCURRENCES ~

DL:LB¹ DL:LB¹3 DL:LB¹3

~

~

ing/yt

%Lee

+TMNovak HSchier 1/(y /84 1/

/84 1/

/84

V v

DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Units 182 Docket Nos.

50-275/323 OL ACRS Members Ms. Elizabeth Apfelberg Maurice Axelrad, Esq.

Mr. Richard E. Blankenburg Mr. Glenn 0. Bright Dr. John H. Buck Philip A. Crane, Jr.,

Esq.

Mr. Frederick Eissler David S. Fleischaker, Esq.

Mrs.

Raye Fleming Arthur C. Gehr, Esq.

Mr. Mark Gottlieb Mr. Thomas H. Harris Mr. Richard B. Hubbard Dr.

W.

Reed Johnson Janice E. Kerr, Esq.

Dr. Jerry Kline Mr. John Marrs Thomas S.

Moore, Esq.

Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Mr. James

0. Schuyler Mr. Gordon Silver Michael J. Strumwasser, Esq.

Paul C. Valentine, Esq.

Harry M. Willis John F. Wolf, Esq Dr: Robert C. Axtmann Mr. Carlyle Michelson Dr. Max W. Carbon Mr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.

Carson Mark Dr. Forrest J.

Remick Dr.

Dade W. Moeller Dr. David Okrent Mr. David A. Ward Mr. Jeremiah J.

Ray Dr. Paul C.

Shewmon Dr. Chester P. Siess Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Mr. Malcolm H. Furbush Resident Inspector/Diablo Canyon NPS Dr. William E.

Cooper Mr.

W.

C. Gangloff Mr.

Owen H. Davis Dr. Jose Roesset

)

~gib Ately

%y*y4 UNITED STP, TES '~,

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAg 2 6 1984 Docket Nos.:

50-275 and 50-323 MEMORANDUM FOR:

Chairman Palladino Commissioner Gilinsky Commissioner Roberts CoIIWIissioner Asselstine Commissioner Bernthal FROM:

SUBJECT:

Darrell G. Eisenhut, Director Division'of Licensing DIABLO CANyON - ALLEGATIONS CONCERNING PULLMAN POWER PRODUCTS (Board Notification No.84-009)

In accordance with the procedures for Board Notifications the enclosed letter, dated November 14, 1983, with attachment from Harold Hudson to Commissioner Gilinsky is being provided to the Commission for information.

The letter was received by this office from the Office of Investigations on December 19, 1983.

Mr. Hudson is a former OA Inspector for Pullman Power Products, a main construction contractor for the Diablo Canyon Nuclear Power Plant.

Mr. Hudson alleges deviations from Pullman Power Products weld procedures and certain major break downs in PG&E contract specifications and OA programs for the welding of pipe supports and pipe rupture restraints by Pullman Power Products at Diablo Canyon.

The staff has initiated its review and evaluation of the allegations and has included this effort in its Diablo Canyon Alleqations Management Proqram.

The staff did not report on the allegations by Mr. Hudson in its recent report on allegations (SSER-21, dated January 4, 1984).

We will inform you of the results of our evaluation.

Contact:

H. Schierling, ONRR x27100

~<X "84/'

p~r+>

8312120125

,<(

)

)

By copy of this memorandum, we are also informing the Atomic Safety and Licensing Board and the Atomic Safety and Licensing Appeal Board.

Enclosure:

As stated cc:

J.

F.

G. 0.

J.

Kl T. S.

W.

R.

J.

H.

SECY OPE EDO OPE Parti Wolf, ASLB Bright, ASLB

ine, ASLB
Moore, ASLAB
Johnson, ASLAB
Buck, ASLAB (2) es to the Proceeding LLYJ1 QQS<l'arrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Units 182 Docket Nos.

50-275/323 OL Ms. Elizabeth Apfelberg Maurice Axelrad, Esq.

Mr. Richard E. Blankenburg Mr. Glenn 0. Bright Dr. John H. Buck Philip A. Crane, Jr.,

Esq.

Mr. Frederick Eissler David S. Fleischaker, Esq.

Mrs.

Raye Fleming Arthur C. Gehr, Esq.

Mr. Mark Gottlieb Mr. Thomas H. Harris Mr. Richard B. Hubbard Dr.

W.

Reed Johnson Janice E. Kerr, Esq.

Dr. Jerry Kline Mr. John Marrs Thomas S. Moore, Esq.

Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Mr. James

0. Schuyler Mr. Gordon Silver Michael J. Strumwasser, Esq.

Paul C. Valentine, Esq.

Harry M. Willis John F. Wolf, Esq ACRS Members Dr. Robert C. Axtmann Mr. Carlyle Michelson Dr.

Max W. Carbon Mr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.

Carson Mark Dr. Forrest J.

Remick Dr.

Dade W. Moeller Dr. David Okrent Mr. David A. Ward Mr. Jeremiah J.

Ray Dr. Paul C.

Shewmon Dr. Chester P. Siess Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Mr. Malcolm H. Furbush Resident Inspector/Diablo Canyon NPS Dr. William E. Cooper Mr.

W.

C. Gangloff Mr.

Owen H. Davis Dr. Jose Roesset