ML16340E013
| ML16340E013 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/29/1983 |
| From: | Buckley B Office of Nuclear Reactor Regulation |
| To: | Carter J, Case E, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8312090357 | |
| Download: ML16340E013 (2) | |
Text
Docket Nos.:
50-275 and 50-323 MEMORANDUM FOR:
H.
E,
~
r II
~
.D.
R.
H.
R.
R, T.
J.
T.
T.
G.
F.
Denton Case Car ter Eisenhut Purple Thompson Vollmer Mattson Speis Sniezek Ippolito Novak Lainas Miraglia IIOV 2 9 >~83 DISTRIBUTION iDocument Control (50-275/323)'
PDR NRC PDR PRC System LB83 Reading JLee
- Attorney, OELD GllKnighton BBuckley HSchierling THRU:
FROM:
SUBJECT:
George M. Knighton, Chief Licensing Branch No, 3
Division of Licensing Bart C. Buckley, Project Manager Licensing Branch No.
3 Division of Licensing DAILY HIGHLIGHT Diablo Ca on, Unit 1
Diablo Canyon, Unit 1 is curl ently N mode 5 (co'td shutdown),
The reactor vessel head bolts are fully tensioned, The re~ctop coolant pumps (RCPs) have been coupled and the RCP seal injection flow has been established.
Limited construction activities associated with items that need to be completed prior to proceedi'ng to initial criticality is being performed below elevation 140" within the containment.
The main condenser is beivg fi'lied to perform
~
'ydrostatic test.in preparation for condensate flush operation, 83%2090357 831129 PDR ADOCK 05000275 P
PDR cc:
S. Black DL BC's Qrtgtttat ~tg ied b9:
g Q
Pr~rrllr"~q~
Bart C, Buckley, Project Manager Licensing Branch No.
3 Division of Licensi'ng DL.
(BL' BBuckley:ft
'GlIt i hton
/gff/83
)l /
r
c '
I K