ML16340D773

From kanterella
Jump to navigation Jump to search
Updates 830705 Status Rept on Idvp.Aslab Will Hold Prehearing Conference on 830823 to Address Contentions
ML16340D773
Person / Time
Site: Diablo Canyon 
Issue date: 08/25/1983
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Gilinsky V, Palladino N, Roberts T
NRC COMMISSION (OCM)
References
NUDOCS 8309060371
Download: ML16340D773 (4)


Text

AUG 25 583 Docket No.:

60-275 IIEMORANDUM FOR:

Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal FROM:

SUBJECT:

William J. Dircks Executive Director for Operations STATUS OF DIABLO CANYON, UNIT 1 DESIGN VERIFICATION PROGRAM The following updates the status report forwarded to you on July 5, 1983.

1.

Su 1ement to the Safet Evaluation Re ort On August 5, 1983, the staff issued its Supplement No. 18 to the Safety Evaluation Report.

This supplement provides the results of the staff's review of the verification effort and recommends reinstatement of the suspended license.

2.

IDVP Final Re ort Additional instal'Iments have been received since the July 5 report and are undergoing review.

3.

Interim Technical Re orts The July 6 s'tatus report advised that additional Interim Technical Reports were expected.

We have received four Interim Reports since issuance of the last status report.

On August 10, 1983, Pacific Gas and Electric Company submitted a summary of actions taken or planned to be taken to ensure that Diablo Canyon, Unit 1 is ready for fuel loading and low power testing.

The staff will consider the above submittals in the final verification of matters and modifications in the plant which are required and remain to be completed for the license activities to be authorized.

Contact:

H. Schierling, ONRR X27100 eSOeoS037a SSQSZS PDR ADOCK 05000275

'P PDR SURNAMEP

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~

~

~

DATE II NRG FORM 318 (10-80) NRCM 0240

~ ~ ~ ~

~ ~

~

~

~

OFFICIAL RECORD COPY USQPO: 1981~960

0 CE*

C~: 0t e

~

~

J '*

r gV.

The Commission

- 2 oo As a followup to its July 22, 1983 scheduling conference on motions to reopen the record on the issue of construction quality assurance, the ASLAB will hold a prehearing conference to address "contentions" on August 23, 1983.

cc:

SECY OGC OPE

)Signed) Iilliamj. Birches William J. Dircks Executive Director for Operations DISTRIBUTION:

Document:Control-50=275 NRC PDR PRC System LB83 Reading File JLee GWKnighton HSchierling TMNovak DGEisenhut/RPurple HDenton/ECase

WJDircks, EDO HBridgers, EDO OFFICE 0 SURNAME/

DATE Q

~

~

8/

ph o ~

~ o ~ o

~ ~

/83 NRC FOAM 318 (10-80) NRCM 0240 DL:L

~

~ o ~ ~

~ o ~ o ~ o ~

HSch erlinq

/(q

/83

~

~ ~ ~ i'

~ ooooooooooooo L

~

~ ~ ~ ~ ~

W

)

ton

/ I

/83 DL:TA:AD L SBlac 8/ I% /83

. O'L

~

~

~

~

~ ~ ~ o ~ ~ o ~ ~ ~

T.

ak

~ ~ ~ ~

~ ~ ~

~ ~ ~ o ~ o ~ ~ ~ ~ o ~ o 8

i

/83

~ oo

~ ~

~

oooo' o ~ ~ o ~ o OFF ICIAL R EGO R D COPY EDO WJDirct;s 8/ Qg/83 D

~ o ~

o1 o Eo ~

~ ~

~

w.... :.

~....... ~

.9/.. /RS.......

USQPO: 1951~960 Rt

~

o ~ oooooooo

%tie. ten........

8/ooP,.../QX......

0 P