ML16340D746
| ML16340D746 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/21/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Gilinsky V, Palladino N, Roberts J NRC COMMISSION (OCM) |
| References | |
| TASK-AS, TASK-BN83-145 BN-83-145, NUDOCS 8308300335 | |
| Download: ML16340D746 (6) | |
Text
Docket No.:
50-275 SEP 21 'IS83 MEMORANDUM FOR:
Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal FROM:
SUBJECT:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation INFORMATION ITEMS REGARDING THE DIABLO CANYON, UNIT 1 DESIGN VERIFICATION PROGRAM (Board Notification No.83-145)
In accordance with NRC procedures for Board Notification, the following information is being transmitted directly to the Commission:
1.
Teledyne Engineering Services, IDVP September Semimonthly Report, September 9, 1983-2.
R. L. Cloud Associates,'TR 67 Rev.
1, Equipment, September 13, 1983 3.
R. L. Cloud Associates, ITR 54 Rev. 0, Containment Building, September 14, 1983 The staff will consider this information in the final verification of matters and modifications in the plant which are required and remain to be completed for the license activities to be authorized.
Enclosures:
As stated cc:
See next page
!~
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation 8308300335
Contact:
H. Schierling, ONRR x27100 DL:LB¹3 L,
B¹3 HSchgerli g yt 9/ig/83 9 ff /83 goos D
DL~
L D
R G
ghton SBl a'ck ovak ut 9
( /83 9//f/83 9/($ 83 9'/83
P
+
g
'I I
V )If
The Commission cc:
J.
F. Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB T. S. Moore, ASLAB W. R. Johnson, ASLAB J.
H. Buck, ASLAB SECY OGC OPE EDO Parties to the Proceeding
tt t 't lit't
~
tr ttt
DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Onits 182 Docket Nos.
50-275'/323 OL ACRS Members Ms.
El izabeth Apfel berg Mr. Richard E.
Bl ankenburg Mr. Glenn 0. Bright Mr. Herbert H. Brown Dr. John H. Buck Philip A. Crane, Jr.,
Esq.
Mr. Frederick Eissler David S. Fleischaker, Esq.
Mrs.
Raye Fleming Arthur.C.-Gehr, Esq.
. Mr. Mark Gottlieb Mr. Thomas H. Harris Mr. Richard B. Hubbard Dr.
W.
Reed Johnson Janice E. Kerr, Esq.
Dr. Jerry Kline Mr. John Marrs Thomas S.
Moore, Esq.
Bruce Norton, Esq.
Joel R. Reynolds, Esq.
Mr. James
- 0. Schuyler Mr. Gordon Silver Michael J. Strumwasser, Esq.
Paul Z. Yalentine, Esq..
Harry 'M. Willis John F. Wolf,. Esq Dr. Robert C. Axtmann Mr. Myer Bender Dr. Max W. Carbon Mr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.
Carson Mark Mr..William M. Mathis Dr. Dade W. Moeller Dr. David Okrent Dr. Milton S. Plesset Mr. Jeremiah J.
Ray Dr. Paul C.
Shewmon Dr. Chester P. Siess Mr. David A. Ward Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Mr.. Vialcolm H.
Furbush
'esident Inspector/Diablo Canyon NPS Dr. William E. Cooper Mr.
W. C. Gangloff Mr.
Owen H. Davis Dr. Jose Roesset
r
'