ML16340D742
| ML16340D742 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/02/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Gilinsky V, Palladino N, Roberts T NRC COMMISSION (OCM) |
| Shared Package | |
| ML16340D743 | List: |
| References | |
| TASK-AS, TASK-BN83-135 BN-83-135, NUDOCS 8308300307 | |
| Download: ML16340D742 (4) | |
Text
Docket No.: 50-275/323 SPP P
.)QR t1E8 RANDUH FOR:
Chairman Palladino Comnissioner Gilinsky Commissioner Roberts Comissioner Asselstine Comnissioner Bernthal FROM:
Darrell G. Eisenhut, Director Division of Licensing
SUBJECT:
DIABLO CANYON QA CASE STUDY - BN-83-135 In accordance with NRC procedures for Board Notification, the following information is being transmitted directly to the Commission.
By copy of this memorandum, wt; are also informing the Atomic Safety and Licensing Board and the Atomic Safety and Licensing Appeal Board.
The enclosed draft working paper was prepared in response to Section 13 of the NRR Authorization Act, Public Law.'97-415 and is being provided for your information.
As indicated in the attached letter to PG&E, we have recently requested their review of the Draft Morking Paper.
Enclosures:
As Stated ysl Darrell G. Eisenhut, Director Division of Licensing, 8308300307 OFFICE/
SURNAME/
DATEP DL
~ ~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
W<tLuWS;X 9/
/83
~ I ~ ~ ~ ~ ~ ~ \\ ~ ~ ~ ~
~ ~ ~ ~ 9/
/83
~ ~ ~ \\
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
OFFICIAL RECORD COPY
- U.S. GPO 1983~00.247 A
~
f "4wsv'c4 -'.
g k.i ar =
a'sag.Awk ran
Cm
cc:
J.
F". Mo1f, ASLB G. 0. Bright, ASLB J. K'tine, ASLB T. S. Hoore, ASLAB M. R. Johnson, ASLAB J. H. Buck, ASLAB
'SECY OGC OPE.
EDO Parties to the Proceeding
~'
h l