hu8 31983 MEMORANDUM FOR:
R. L. Baer, Chief, Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering
- Response, IE
'FROM:
SUBJECT:
T.
W. Bishop, Director, Division of Resident Reactor Project 8 Engineering Inspection, RV GENERAL ELECTRIC GENERIC LETTER ON MODlFICATION OF VERTICAL LIFT METAL-CLAD SWITCHGEAR EQUIPMENT SHORT CIRCUIT BRACING The purpose of this memorandum is to document the Region V response to your memorandum of June 2,
1983 regarding the same subject.
The information, repeated
- below, was previously transmitted to you by telephone on August 1, 1983 by Mr. P. Morrill of our staff.
Regarding Diablo Canyon, licensee personnel reported to the Resident Inspector that the subject switchgear had not been used at that facility.
Regarding Hanford Unit No. 2, licensee personnel reported to the Resident Inspector that, the letter from General Electric Switchgear Department had been received and that appropriate modifications were made to the switchgear.
T.
W. Bishop, Acting Director Division of Resident Reactor Project 6 Engineering Inspection CC:
V. D. Thomas, IE D. Haist, RV P. Morrill, RV A. Toth, RV M. Mendonca, RV Qcc:
'RSB/Document Control-Desk -(RIDS)'
I Distributed by RV Mr. Martin
'ink 6 green copy Docket, file copy 5'0-.a 7S RV MO~III/dot BISE I
8/j I/83 8/~83
(
83080905i4 830803 PDR ADOCK 05000275 P
-, PDR ',
i l~
~io
Jg
'A
'P
~.J 1'L A>>V" <
>I I <<<< f<<>> A K A t I" t 'I <<WPJ I <<1 /P I I<<g f
- IfJ,
~ fp 'A <<AJ, p' L", A P b 'r ~ 1 J IV l3 'I P f I lf 'I <<\\I ' I A f>> IA,1 I 'A)t )! tt I I I 'l>> >>J '<< I'<<b'<<e , <<l'