ML16340D512
| ML16340D512 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/07/1983 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| References | |
| TASK-AS, TASK-BN83-092, TASK-BN83-92 BN-83-092, BN-83-92, NUDOCS 8306270400 | |
| Download: ML16340D512 (6) | |
Text
JUL y 1983 Docket No.:
50-275 YIEt<ORANDUM FOR:
Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROfl:
SUBJECT:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM FOR DIABLO CANYON, UNIT 1 (Board Notification No. 83-92)
In accordance with the present NRC procedures for Board Notifications, the following items are enclosed for information of the Commission:
1.
Teledyne Engineering Services, "IDVP Final Report - Sixth TeXt Submittal,"
June 28, 1983.
This submittal includes a section on the verification of Diablo Canyon Project activities arising from non-seismic activities and a section on the verification of modifications.
2.
Teledyne Engineering Services, "IDVP Final Report - Seventh Text Submittal" June 30, 1983.
This submittal completes the IDVP Final Report.
Additional supplementary information is expected.
The information is being reviewed and evaluated by the staff. It will be considered in formulating the staff recomendation regarding reinstatement of the low power license which was suspended by Commission Order DLI-81-30.
The information is relevant to the safety issue on the design adequacy of Diablo Canyon Unit l.
f'( '306270400
Enclosures:
As Stated Darrell G. Eisenhut, Director Division of Licensing DLN57Ce f Nuclear Reactor Regulation IVOOa OFFICE/
SURNAMEII DATEf
...cc...See..ne
~ ~ ~ ~ oooo ~
~ ~ o ~ o ~ ~ o ~ ~ o ~ ~ ~
Coniaci:
i tooga geoooooooo
~ ~ ij
~ ~ o ~ \\Eo o ~ ~ ~
~\\ Aoiio
. Scnserlsn Qo7i}QQ ooo ~ ooo
~ ~ ~ ~
l L
J)Schi er q~
~ o ~ ~ ~ ~ ~ o
~
~ ~
~ o nh NRC FORM 318 00-80) NRCM 0240 OFFICIAL RECORD COPY USGPO! 1981~o999
W
"~
'k
~~l The Commissioner 6
cc:
J.
F. Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB T. S. Moore, ASLAB W.
R. Johnson, ASLAB J.
H. Buck, ASLAB
. SECY OGC
~
OPE EDO Parties to the Proceeding
I.
5.
4 i'p I ~
'I 0.;
DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Units 152 Docket Nos. 50-275/323 OL Ns. Elizabeth Apfelberg Mr. Richard E. Blankenburg Mr. Glenn 0. Bright Mr. Herbert H.
Brown Dr. John H. Buck Philip A. Crane, Jr.,
Esq.
Mr. Frederick Eissler David S. Fleischaker, Esq.
Mrs.
Raye Fleming Arthur C,-Gehr, Esq.
Nr. Nark Gottlieb Mr. Thomas H. Harris Nr. Richard B. Hubbard Dr.
W.
Reed Johnson Janice E. Kerr, Esq.
Dr. Jerry Kline Nr. John Marrs Thomas S.
- Moore, Esq.
Bruce Norton, Esq.
Joel R. Reynolds, Esq.
Mr. James 0.'chuyler Nr. Gordon Silver Michael J. Strumwasser, Esq.
Paul C. Valentine, Esq.
Harry M. Willis John F. Wolf, Esq Atomic Safety and Licensing Board Panel Atomic Safety and Licensing A@peal Panel Nr.. Malcolm H. Furbush Residerit Inspector/Diablo Canyon NPS Dr. William E. Cooper Nr.
W.
C. Gangloff Mr.
Owen H. Davis Dr. Jose Roesset ACRS Members j
Dr. Robert C. Axtmann Nr. Myer Bender Dr.
Max W. Carbon Mr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.
Carson Mark Mr. William M. Mathis Dr. Dade W. Moeller Dr. David Okrent Dr. Milton S. Plesset Mr. Jeremiah J.
Ray Dr. Paul C.
Shewmon Dr. Chester P. Siess Mr. David A. Ward