Docket No.:
50-275 MAY 13 1983 tlEMORANDVM FOR:
Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROM:
SUBJECT:
Darrell G. Eisenhut, Director Division of Licensing INFORIIATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM FOR DIABLO CAN ON, UNIT 1 (Board Notification No. 83-68 )
Md6'n accordance with the present NRC procedures for Board Notifications, the following item is enclosed for information of the Commission:
Teledyne Engineering Services, "Diablo Canyon Nuclear Power Plant, Unit 1, Final Report.
Independent Design Verification Program" The enclosure is the first installment of the report with the last installment currently scheduled for submittal by June 30, 1983.
The report covers Phase I and the Phase II of the independent design verification program.
This report and the PGIWE Phase I Final Report of the design verification program are under review by the staff and will provide to a large degree the bases for the staff recommendations to the Commission regarding the reinstatement of the suspended low power license./
c" Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
J.
F. Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB T. S. Moore, ASLAB W.
R. Johnson, ASLAB J.
H. Buck, ASLAB SECY
'305lhOf85 8305l2 OGC PDR ADOCK 05000275 R
PDR isenhut 5/P/83 OFFICEI SURNAME/
DATE$
'"""""""Par'ti's-Co'"th'e" P c'e'e'd'i'n'g LBP3 I
HSchie i
g
~ ~to5of t ~
topf30
~ ~ t ~ ~ ~
yighton
~ ~ ~ ~ /
~O/tgt)o
~ O ~ O ~ O
~ Otto ~ O AD/L ovak
/jg783"""
~t ~ ~ ~
~
OOOO ~ ~ O ~ ~ ~ O ~ O ~ O ~
~ ~ ~ ~ 00 ~ ~ ~ ~ ~
~
~
1 1 i ams ISO too at
~ ~ ~t ~ ~ ~ ~ ~ O i /83 C FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~990
I
DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Units 182 Docket Hos. 50-275/323 OL Ms. Elizabeth Apfelberg Mr. Richard E. Blankenburg Mr. Glenn 0. Bright Mr. Herbert H. Brown Dr. John H. Buck Philip A. Crane, Jr.,
Esq.
Nr. Frederick Eissler David S. Fleischaker, Esq.
Nrs.
Raye Fleming Arthur C. Gehr, Esq.
Nr. Mark Gottlieb Nr. Thomas H. Harris Mr. Richard B. Hubbard Dr.
W. Reed Johnson Janice E. Kerr, Esq.
Dr. Jerry Kline Mr. John Marrs Thomas S. Moore, Esq.
Bruce Norton, Esq.
Joel R. Reynolds, Esq.
Nr. James
- 0. Schuyler Mr. Gordon Silver Michael J. Strumwasser, Esq.
Paul C. Valentine, Esq.
Harry M. Willis John F. Wolf, Esq Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section Document Management Branch ACRS Members Dr. Robert C. Axtmann Mr. Myer Bender Dr. Max W. Carbon Nr. Jesse C. Ebersole Nr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.
Carson Mark Nr. William M. Mathis Dr. Dade W. Noeller Dr. David Okrent Dr. Milton S. Plesset Nr. Jeremiah J.
Ray Dr. Paul C.
Shewmon Dr. Chester P. Siess Mr. David A. Ward
- h. ~e II I
I h
h
~
If h
h
+ f,
a BO~nPD HOTI F ICATI OH BH-83-68
"'w/enclosure men@=Control=(-50-275)*
HRC PDR*
L PDR*
TERA*
HSIC*
KALB=,':3 Reading G. )'nighton Project yanager*
HSchierling J.
Lee T. ll. Hovak M. Stine D, Eisenhut/R.
Purple t>i. Williams H. Denton/E.
Case*
PPAS J.
Youngblood A. Schwencer E'.. Adensam C.
Thomas R. Vollmer H.
Thompson R. Hattson S.
Hanauer
- Attorney, OELD*
E. L. Jordon J. fi. Taylor Regional Adminstrator Pesident Inspector
'k. J. Dircks, EDO (3)
E. Christenbury, OELD J. Scinto, OELD A. Bennette*
( 1)
S.
Black cc:
Board Service List
I
~
1