ML16340D327
| ML16340D327 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/15/1983 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML16340D328 | List: |
| References | |
| NUDOCS 8304270065 | |
| Download: ML16340D327 (2) | |
Text
MEt<ORANDUII FOR:
Chairman Pal 1 adino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROI1:
William J. Dircks Executive Director for Operations
SUBJECT:
STATUS OF DIABLO CANYON DESIGN VERIFICATION EFFORT Per your request, enclosed is a summary of the status of the Diablo Canyon design verification efforts by PG&E, the IDVP and the staff.
The PG&E analysis of the containment annulus structure and necessary modifications to the structure remain as critical elements in the schedule for fuel load authorization as evidenced by a recent slip in schedule.
In addition, the review of the PG&E corrective actions by the IDVP and the issuance of final reports could lead to additional delays.
Enclosures:
As stated (Signed) VVilliani i. Din,ks llilliam J. Dircks Executive Director for Operations ID'AAF A
~NL.
,<O OO C90
[I!A O
ISl4X
'OO OQ
, Ale lOCL FJA IQ.0 cc:
SECY OPE OGC
Contact:
H. Schierling, NRR xt. 27100 LB¹3 GKnighton
/ I /B3 OFFICEIW SURNAME/
DATE Q LB¹3 HSchierl "T/"/8$"--
s No f<
/8$"
DL:
NR 6'
u4""
N EDO
-HR 'oii""'N'-'s
'$7If/9r---
'47iXl93'RC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQ PO: 1981335-960
~
~