Forwards Diablo Canyon Design Verification Program Status Rept. Licensee Analysis of Containment Annulus Structure & Necessary Mods to Structure Remain Critical Elements in Schedule for Fuel Load Authorization
ML16340D327
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/15/1983
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ahearne J, Gilinsky V, Palladino N
NRC COMMISSION (OCM)
Shared Package
ML16340D328 List:
References
NUDOCS 8304270065
Download: ML16340D327 (2)


Text

MEt<ORANDUII FOR:

Chairman Pal 1 adino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROI1:

William J. Dircks Executive Director for Operations

SUBJECT:

STATUS OF DIABLO CANYON DESIGN VERIFICATION EFFORT Per your request, enclosed is a summary of the status of the Diablo Canyon design verification efforts by PG&E, the IDVP and the staff.

The PG&E analysis of the containment annulus structure and necessary modifications to the structure remain as critical elements in the schedule for fuel load authorization as evidenced by a recent slip in schedule.

In addition, the review of the PG&E corrective actions by the IDVP and the issuance of final reports could lead to additional delays.

Enclosures:

As stated (Signed) VVilliani i. Din,ks llilliam J. Dircks Executive Director for Operations ID'AAF A

~NL.

,<O OO C90

[I!A O

ISl4X

'OO OQ

, Ale lOCL FJA IQ.0 cc:

SECY OPE OGC

Contact:

H. Schierling, NRR xt. 27100 LB¹3 GKnighton

/ I /B3 OFFICEIW SURNAME/

DATE Q LB¹3 HSchierl "T/"/8$"--

s No f<

/8$"

DL:

NR 6'

u4""

N EDO

-HR 'oii""'N'-'s

'$7If/9r---

'47iXl93'RC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQ PO: 1981335-960

~

~