ML16340C900

From kanterella
Jump to navigation Jump to search
Forwards Items Re Design Verification Program for Facility, Per Board Notification 82-100
ML16340C900
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/29/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Ahearne R, Gilinsky V, Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8211010059
Download: ML16340C900 (6)


Text

Docket No.:

50-275 SEP.2 9 1982 MEMORANDUM FOR:

Chairman Palladino Commissioner Gi linsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROM:

SUBJECT:

Darrell G. Eisenhut, Director Division of Licensing, ONRR INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM fOR DIABLO CANYON, UNIT 1

(Board Notification No.82-105 In accordance'ith present NRC procedures for Board Notifications, the following is enclosed for information of the Commission:

l.

IDVP Semi-monthly Status Report (Open Item Files) by Teledyne Engineering Services, dated September 10, 1982 (including corrected File No. 1083, dated September 13, 1982).

2.

IDVP Semi-Monthly Status Report (August 14 to September 10, 1982) by R.

F.

Reedy Inc., dated September 10, 1982.

3.

IDVP Semi-Monthly Status Report (Open Item Report) by R. L. Cloud Associates, dated September 10, 1982.

4.

IDVP Semi-Monthly Status Report by Stone

& Mebster Corp.,

dated September 10, 1982.

5.

Teledyne Engineering Services,"Revised Procedure for "Potential or Apparent Conflicts of Interest of Individuals",

dated September 17, 1982.

6.

Teledyne Engineering Services, Revised Procedure f'r Piping Support Base Plate and Anchor Bolt Evaluation (I&E Bulletin 79-02)", dated September 17, 1982.

7.

R. L. Cloud Associates, "Interim Technical Report 7 - Electrical Raceway Supports",

dated September 17, 1982.

82ii010059 820929 PDR ADGCK 05000275 R

PDR OFFICE P SURNAMEtI DATE 5

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ 0 ~ ~ 0 ~ 1 ~ OOO ~ 0 ~ ~ 0 ~ 0 ~ ~ IOO NRC FORM 318 (10-80) NRCM 0240 OFFIClAL RECORD COPY USQ PO: 1881~880

0 n

I

The Commission SEP 29 lggp Enclosures 1 through 4 provide information on the status of activities performed under the IDVP for Diablo Canyon by the participating organiza-tions.

Some of these activities fall within Phase II of the IDVP (e.g.,

Stone 5 Webster activites as described in Enclosure

4) which has not been approved yet by the NRC.

Enclosure 5 is a revision of the subject procedure in response to a staff request.

Enclosure 6 provides a revised procedure for the subject activity which will not be reviewed by the IDVP due to prior involvement by Teledyne.

Enclosure 7 is the Seventh Interim Technical

Report, prepared by R. L. Cloud Associates and approved by Teledyne.

This information is relevant to the safety issue on the design adequacy of Diablo Can'yon Unit 1.

This is the subject of Commission Order CLI 30 which is the basis for the IDVP.

The staff is evaluating the informa-tion as part of its ongoing review of the IDVP efforts and will report on the results. prior to reinstatement of the license.

The material does not pertain to those matters that were resolved by the ALAB 644.

Original signed by Darrell G. Eisenhut Darrell G. Eisenhut, Director Division of Licensing Offi'ce of Nuclear Reactor Regulation

Enclosures:

As stated cc w/enclosures:

ASLB ASLAP SECY OPE OGC Board Service List

Contact:

Hans Schierling, ONRR X27238 Dist:

See attached sheet OFFICE)

SURNAME/

.9/..23'./.8.2.

DATE$

DL:LBIII3 0 ~

~ ~ ~

Schi erl i n D: LBIII3 h(

7$ /82 DL:AD:L DL,

~

~ ~

~ ~

~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~

9 /82

~ I t ~ 1 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

0 ~ ~II~ ~

~ ~

~

0 ~ 0 ~

D

~ ~ ~ 0 ~ 00 ~I ~ ~ 0 ~ ~ ~ ~ L~ ~ ~ ~ ~ ~ ~

9

/82

~ ~ 0 ~ 0 ~

E

~ ~ ~ ~ ~ ~ 0 ~ 0 ~ I ~I~ 0 ~ 0 ~ ~ 0 ~ I0 ~

~ ~ ~ 0

~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~

NRC FORM 318 {10~) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1991~5.960

I I'

t~

II f

DYNE ENQINEERlNG SERVlCES Mr. G. A. Maneatis, Senior Vice-President Facilities Development Pacific Gas and Electric Co.

77 Beale Street San Francisco, California 94106 Mr. H. R. Oenton, Director Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Washington, D.C.

20555 Mr. R.

H. Engelken, Regional Administrator Region V

U. S. Nuclear Regulatory Co)mission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re:

Docket No.

50-275 Diablo Canyon Unit 1 License No.

OPR-76 130 SECONO AVENUE WA).THAM,MASSACHUSETTS 02254 (6'I 7) 890.3350 TWX1710) 324 7508 September10,1982 5511-119

Subject:

DCNPP Independent Design Verification Program:

TES September Semimonthly Report Gent 1emen:

Enclosed in numerical order are the Open Item Report System Forms issued by TES since our last Semimonthly Report.

Very Truly Yours, TELEDYNE ENGINEERING SERVICES

~z W~

Wi 1 1 i am E. Cooper Project Manager WEC:cjr Enclosure cc:

H. E. Schierling (NRC - 2 Copies)

R. R. Fray (PG&E)

R. L. Cloud (RLCA)

R. F. Reedy (RFR)

F. Sestak, Jr.

(SWEC)

H. B. Brown, Esq.

D. F. Fleischaker, Esq."'.

Reynolds, Esq.

B. Norton, Esq.

A. C. Gehr, Esq.

ENGINEERS AND METALLURGISTS I'

0 l

4

'