ML16340C795
| ML16340C795 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/14/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML16340C796 | List: |
| References | |
| TASK-AS, TASK-BN-82-95 BN--82-95, BN-82-95, NUDOCS 8209160315 | |
| Download: ML16340C795 (6) | |
Text
SEP 14 1982 Docket No. 50-275 hlENORANDUM FOR:
Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Comaissioner Asselstine FROM:
Darrell G. Eisenhut, Director Division of Licensing, ONRR
SUBJECT:
1.
Teledyne Engineering Services, Independent Design Verification Program:
TES August Semi-monthly Report (Report Number 20). transmitted by letter dated August 27, 1982.
2.
Transcript of NRC Meeting with Pacific Gas 8 Electric Company and with Teledyne on September 2, 1982, in San Francisco, California.
Enclosure 1 provides information on the status of activities performed under the Independent Design Verification Program (IDVP) for Diablo Canyon Unit 1 by the participating organizations.
Enclosure 2 is a verbatim transcript of the subject meeting at which the following items, among others were discussed:
(1) relevancy of the findings thus far of Phase I
of the program with respect to seismic/non-seismic differentiation and with respect to the June 1978 Phase I/Phase II:date, (2) need for inclusion of gA for construction activities in "the program, (3) specific evaluations of the fuel handling building, (4) format, scope, and schedule for the PG8E Phase I final report.
jy'0o5
Contact:
flans Schierling, ONRR X27238 INFORh1ATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM -
PHASE I FOR DIABLO CANYON, UNIT I p~ ~gr~>sICc~
(Board Notification No. 82-s +r
+fg7/F-d-In accordance with present NRC procedures for Board Notifications, the following is enclosed for information of the Commission:
OFFICE/
SURNAME/
8209i60315 8209i4 t
PDR ADOCK 05000275 R
PDR NRC Fbs ~ sss v sv I sarvuI svssrsss vcwv
~ ~ ~
~ ~ ~ ~ ~
~ ~ s ~ ~
~
OFFICIAL RECORD COPY USGPO: 1881~860
FQ 1
C The Commission This information is relevant to the safety issue on the design adequacy of Diablo Canyon Unit 1.
This is the subject of Coomission Order CLI-81-30 which is the basis for the IDVP.
The staff is evaluating the information as part of its ongoing review of the IDVP efforts and will report on the results prior to reinstatement of the license.
The material does not pertain to those matters that were resolved by ALAB 644.
Enclosures:
As stated baaed By; Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:
ASLB ASLAP SECY OPE OGC Board Service List DISTRIBUTION See Attached OFFICEI SURNAME/
DATE ts PL of
~ ~
Its ~ I
~ ~ I BBuc klay.;.1.b..
....osdPzaz...
Br
- LB 3 9/ gs2.
Tt1 k
-. R//..jh2....
D
~nut
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ I ~
..GR/(....82 NRG FORM 318 u0-80) NRCM 0240 OFFlClAL RECORD COPY uSOF0s SSSS-SS ceo
0 C
I
C ate:
BOARD NOTIFI,'CATION PLANT: 3)l&l Qggpg BN No'. BB-g5 Document Control (".50-+75)
NRC PDR*
L PDR*
PRC System*
NSIC*
LB83 Reading File*
JKerrigan, Acting B/C pg* ~
JLee'Nova k/SChestnut LBerry "
DEisenhu't/RPurple Nlli1 1 i ams HDenton/ECase*
PPAS JYoungblood ASchwencecer EAdensam CThomas, Acting B/C RHattson RVollmer HThompson SHanauer
- Attorney, OELD*:
OISE Regional Administrator Resident Inspector
- HJDircks, EDO (3 cys)
- ABennett, OELD (2 cys)
EChristenbury, OELD*
JScinto*
Board Servide List
, Region':
DISTRIBUTION
- ll/Enclosure s3
0
'l
/
IIII