Docket No. 50-275 AUG 2 5 1982 t<ENORANDtm FOR:
Chairman Palladino Commissioner Gilinslgr Commissioner Ahearne Comissioner Roberts Comoissioner Asselstine FROM:
SUBJECT:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation INFORNTION ITH5 REGARDING THE DESIGN VERIFICATION PROGRN <<PHASE I FOR DIABLO.CANYON. UNIT 1 (Board Notification Ho. 82-89 )
In accordance with present NRC procedures for Board Notifications, the following is enclosed for information to the.Coranission:
Transcript of NRC tteeting with Pacific Gas
& Electric and Teledyne Engineering Service on August 6. 1982, in Bethesda, flaryland.
The enclosure is a verbatim transcript of a meeting at which PaciOc Gas
& Electric (PG&E) discussed the scope, status and schedule of its Internal Technical Program (ITP) and the relationship of the program to the Independent Design Verification Program (IDVP) under the management of Teledyne Engineering Services (TES).
PG&E discussed its ongoing corrective action program which responds to error or open items (EOIs) that have been identified through the IDVP and the ITP.
This corrective action program includes a seismic analysis of all safety-related structures, a verification of all large bore safety-related piping, including support
- analysis, and complete reanalysis of small bore piping where required.
PG&E stated that work-packages will be issued for completed elements of the corrective action program which will be available for audit.
PG&E presented an overall schedule for the design verification effort which calls for fuel loading by the end of November 1982.
PG&E was requested by the staff to prepare a list of all safety-related structures, systems and components that are required for fuel loading.
tl. Cooper, Teledyne Project Manager of the IDVP, briefly summarized the status, of the program.
Representatives of the Joint Intervenors and of the Governor of the State of California made brief statements at the end of the meeting.
All parties agreed that another meeting should take place as early, as possible (late August-early September) to discuss the status of various technical and programmatic issues.
27238 OFFICE(
~ ~ ~ ~
~ oe
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~
~ ~ ~ ~
oo+
suRNi 8209150114 8208Z5 PDR ADOCK 05000275 PDR DL 1'
~ ~ ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ 0 ~i~ ~ ~
~ 0 ~ ~ ~ ~ ~i ~ 0 ~ 0 ~ 0 ~ 10 ~i~ ~ ~
~
~ 0
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~i~\\ ~ ~ ~ ~I NRC FORM 318 (10-80) NRCM 0240 0 F F ICIAL R EGO R 0 COPY VSOP01 1981~mi860
,4
~,
I
~ Q 1
~
II
The Commission The submittal provides information on the status of the Independent Design Verification Program activities for Diablo Canyon Unit 1.
The information is relevant to the subject of Com~ission adequacy of Diablo Canyon Unit 1.
lhis is the subject of Comission Order CLI-81-30 which is the basis for the IDYP.
The staff is evaluating the information aspart of its ongoing review of the IDYP efforts and will report on the results prior to reinstatement of the license.
The material does not pertain to those matters that were resolved by ALAB 644.
Enclosure:
As stated cc:
ASLB ASLABP SECY OGC OPE O+~e<>&l sidney by D&I'1'QlgQ~ ggse~
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation DISTRIBUTION See attached OFFICEI2 SURNAME/
DATE0 DLLB¹3 HSchi rl 08/t
/82 D
~b, iraglia 081$ /82 L'ak 08/ ( )~ /82 D
DG hut 08J, J82 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECO D COPY USGPO: 1981~960
,4
'0 iA a
I r
'V
BOARD NOTIFI CATION S2-SZ Diablo Canyon IDVP - Transcript of August 6 Meeting with NRC, TES and PG8E Distribution ("w/encl osure)
Document Control (50-275)
NRC PDR L PDR PRC System NSIC LB¹3 Reading*
F. Miraglia J.
Lee H. Schierli.ng
- T. Novak/J.
Kerri.gan/L. Berry D. Eisenhut/R.
Purple M. Williams H. Denton/E.
Case*
PPAS J.
Youngblood A. Schwencer E.
Adensam H: Bernard R. Mattson R. Vollmer H. Thompson S. Hanauer Attorney, OELD*
W. J. Dircks, EDO (3)
E. Christenbury, OELD*
J. Scinto, OELD*
A. Bennett, OELD (3)*
cc:
Board Service List Licensee Service List
V a
JJ
<<g+ p 4
4
~
~'
'L
<c ~
'L