Docket No.:
50-275 gUG 2 1982 MEMORANDUM FOR:
Chairman Pal'ladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner'sselstine FROM:
SUBJECT:
Darrell G. Eisenhut, Director C
Division of Licensing Office of Nu'clear Reactor Regulation INFORMATION.'ITEM REGARDING THE DESIGN VERIFICATION PROGRAM-PHASE I FOR DIABLO CANYON, UNIT 1 (Board Notification No.
82 -80)
In accordance with present NRC procedures for Board Notifications, the following is enclosed for information of the Commission:
Third Interim Technical 'Report, "Diablo Canyon Unit 1 IDVP-TANKS", issued by R. L. Cloud Associates and transmitted to G.
Maneatis, et. al.
by let'ter dated July 16, 1982 The report presents the analytical results, recommendations and conclu-sions of the Independent Design Verification Program (IDVP) with respect to the initial tank sample. "It is based o'n the generic sample evaluation by R. L. Cloud Associates (RLCA) and was approved by Teledyne Engineering Services (TES), the IDVP Program Manager.
The submittal is in accordance with the TES Program Management Plan of March 29, 1982.
Additional reports will be submitted when specific tasks of th'e program have been completed.
A final technical report on the IDVP will be submitted by'G&E in accord-ance with Commission Order CLI'-81-30 of November 19, 1981.
The information in the enclosure is relevant to the safety issue on the design adequacy of Diablo Canyon, Unit 1.
This is the subject of Com-mission Order CLI-81-30 which is the basis for th'e IDVP.
The staff is evaluating the information presented in the enclosure as part of its 8208260362 820802 PDR ADOCK 05000275 P
PDR OFF1CEQ SURNAME/
DATE0
, NRC FORM 318 RO/80) NRCM 0240 OFFICIAL RECORD COPY A USGPO: 198~29~82
I I
r 4
The Commission ~
~
ongoing review of the IDVP efforts and in particular with respect to the adequacy of Phase I of the program.
The staff will report on the results prior to reinstatement of the li'cense.
Th'e material does not pertain to those matters that were resolved by ALAB 644.
Enclosure:
As stated r
cc:
ASLBP ASLAP SECY OGC OPE Board Service List Original Signed BFC Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
Contact:
Hans Schierling x27238 OFFICE/
SURNAME/
0ATEJ>
@$3:
DL O7g.l/82 LB¹3:
DL Hk.chi.er.1.in...
07/q /82
~ LB¹3 09.1.1.0....
07/1J/82 A/D:
DL 0
~ ~ ~ ~ ~
~
~
RP e..
/
/82 OL P.'t 07)0/882
~ ~ ~ ~ ~
~ ~ 0
~ ~ ~ 0 ~ \\ ~ ~ ~ ~ ~ ~
0 ~
NRC FORM 318 110/801 NRCM 0240 OFFICIAL RECORD COPY
- USGPO: 19~29.824
t t
H H
lt
DISTRIBUTION OF BOARD NOTIFICATION Diablo Canyon Units 152/CONN Docket Hos. 50-275/323 OL Leonard Bickwit, Esq.=
Nr.
Samuel J. Chilk Mr. Glenn 0. Bright Dr. John H. Buck Dr.
W.
Reed Johnson Dr. Jerry Kline Thomas S. Moore, Esq.
John F. Wolf, Esq Ms. Elizabeth Apfelberg Andrew Baldwin, Esq.
Mr. Richard E. Blankenburg Mr. Herbert H. Brown Philip A. Crane, Jr.,
Esq.
Mr.. Frederick Eissler David S. Fleischaker, Esq.
Mrs. Raye Fleming Arthur C. Gehr, Esq.
Nr. Byron S. Georgiou Nr. Mark Gottlieb
~ Nr. Richard B. Hubbard Janice E. Kerr, Esq.
'r.
John Narrs Bruce Norton, Esq.
Joel R..Reynolds, Esq.
Nr. James
- 0. Schuyler Nr. Gordon Silver Paul'.
Valentine, Esq.
Harry N. Willis Atomic Safety and Licensing
. Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section
~
Document Management Branch ACRS Members Dr. Robert C. Axtmann Mr. Nyer Bender Dr. Nax W. Carbon Nr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.
Carson Mark Mr. William N. Mathis Dr. Dade W. Moeller Dr.. David Okrent Dr. Milton S. Plesset Nr. Jeremiah J.
Ray-Dr. Paul C.
Shewmon Dr. Chester P. Siess Nr. David A. Ward
C