ML16340C682

From kanterella
Jump to navigation Jump to search
Board Notification 82-67:forwarding NRC to Teledyne Engineering Svcs Transmitting BNL Independent Seismic Evaluation of Plant Containment Annulus Structure & Selected Piping Sys
ML16340C682
Person / Time
Site: Diablo Canyon 
Issue date: 07/01/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Ahearne J, Gilinsky V, Palladino N
NRC COMMISSION (OCM)
Shared Package
ML16340C683 List:
References
TASK-AS, TASK-BN-82-67 BN--82-67, BN-82-67, NUDOCS 8207140397
Download: ML16340C682 (12)


Text

JUL l 1982 Docket No.: 50-275 MEMORANDUM FOR:

FROM:

SUBJECT:

Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation BROOKHAVEN REPORT ON ITS INDEPENDENT EVALUATION OF DIABLO CANYON DESIGN VERIFICATION (Board Notification No. 82-67) g6<

In accordance with present NRC procedures for Board Notifications the following is enclosed for information of the Commission:

NRC letter transmitting the following report to Teledyne Engineer ing Ser vices, "Independent Seismic Evaluation of the Diablo Canyon Unit 1

Containment Annulus Structure and Selected Piping Systems",

a report prepared by Brookhaven National Laboratory (BNL) in June 1982.

The report presents the results of the independent effort on the subject by BNL which was performed at the request of the staff of the Division of Engineering.

The report is provided to Teledyne Engineering Services, the Program Manager for the Independent Design Verification Program (IDVP), with a request that they inform us of their views regarding the validity of the BNL results and of their generic implications.

t 8207l40mV-e2070l PDR ADOCK 05000275 PDR

Enclosure:

As Stated The information in the enclosure is relevant to the safety issue on the design adequacy of Diablo Canyon Unit 1.

This is the subject of Commission Order DLI-81-30, which is the basis for the IDVP.

~~nBd ot<S~"B ~, @SOB g~ggBl~

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:

See next page

  • SEE PREVIOUS CONCURRENCE OFFICE/

SURNAME/

DATEf LB¹3:DL*

~ ~ 0 ~ ~ ~ ~ ~ ~

HSch ierl ing 6/28/82 NRC FORM 318 (10-80) NRCM 0240 LB¹3:DL*

mi FMiraali I AO ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ Ouo ~ 0 6/28/82 AD:DL*

5Egnllut PTedesco 6/28/82

- fv-OFFICIAL RECORD COPY

~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~

USQPO: 1991~i990

Docket No.:

50-275 MEMORANDUM FOR:

Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner 'Asselstine FROM:

SUBJECT:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation BROOKHAVEH REPORT ON ITS INDEPENDENT EVALUATION OF DIABLO CANYON DESIGN VERIFICATIOH (Board Notification Ho. 82-

)

In accordance with present NRC procedures for Board Notifications the following is enclosed for information of the Commission:

HRC letter transmitting the following report to Teledyne Engineering

Services, "Independent Seismic Eva'luation of the Diablo Canyon Unit 1

Containment Annulus Structure and Selected Piping Systems",

a report prepared by Brookhaven National Laboratory (BNL) in June 1982.

The report presents the results of the independent effort on the subject by BHL which was performed at the request of the staff of the Division of Engineering.

The report i's provided to Teledyne Engineering

Services, the Program Manager'or the Independent Design Verification Program (IDVP), with a reques't that the findings of the report be con-sidered in the decision making process of the IDVP.

The staff also is evaluating the information in'he report in particular with respect to the adequacy of the scope of 1'hase I of the program as the basis for reinstating the fuel load/low power license.

The information in the enclosure is relevant to the safety issue on the design adequacy of Diablo Canyon Unit 1.

This is the subject of Commission Order CLI-81-30, w'hich is the basis for the IDVP.

Enclosure:

As stated Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

  • See previous concurrence OFFJCE/

SURNAME/

OATEN

~

LB¹3:

DL LB¹3:

DL

. "..NChi.er.).ing.'Z... ~F5i.r.all.iO 06/28/82 06/28/82 A/D: DL

...".(T.qgqs co 06/28/82 D

~ ~ ~

~ ~ ~ ~

~

D 06~82 NRC FORM 318 80/80) NRCM 0240 OFFICIAL RECORD COPY

< USGP0; 1980M29.824

0 0

4

Docket No.:

50-275 l4 MEMORANDUM FOR:

Chairman Pall'adino Commissioner Gili'nsky Commissioner"Ahearne Commi ss ioner 'Roberts Commissioner'"Asselstine

SUBJECT:

The info ation in the enclos'ure is relevant to the safety issue on the des gn adequacy of Diablo 'Canyon Unit 1.

This's the subject of Comis ion Order CLI-81-30, vihich 'is the basis for th'e IDVP.

FROM:

Darrell G. Eisenhut, Directo Division of Licensing Office of Nuclear Reacto Regulation BROOKHAVEN REPORT ON S

INDEPENDENT EVALUATION OF DIABLO CANYON DESIGN VERIF ATION In accordance with present NRC pr cedures for Board Notifications the following report is enclosed fo information'f the Commission:

"Independent Seismic Eva uation of the Diablo Canyon Unit 1

Containment Annulus Structure and Selected Piping Systems",

a report prepared b /Brookhaven National Laboratory (BNL) in June 1982.

The report presents tPe resul,ts of the independent effort on the subject by BNL which was performed at the request of the staff of the Divis'ion of Engineering.

Tgd report has been provided to Teledyne Engineering

Services, the pro f'am manager" for the Independent Design Verification Program (IDVP),

ith a request that the findingsof the report be con-sidered in the ecision making process of the IDVP.

The staff also is evaluating th information in the report in particular with respect to the adequacy of the scope of Phase I of the program as the basis fo' reinstatin the fuel load/love'power license.

Enclosure:

As stated Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation OFFICE/

SURNAME/

0ATEP LBk3:

DL HSchierlin 6/ Lg'82

~ ~

z FM 6

~ ~

DL-

~ ~ ~ ~ ~ ~

lia

/82

~ ~ ~ ~ ~

0

~

T; de c 0 /~/82 DL DEisenhut 06/

/82 NRC FORM 318 110/80) NRCM 0240 OFFICIAL RECORD COPY

  • USGPO: 1980-329 824

g I C

/

l +!w 4'c:

ASLBP ASLAP SECY OGC OPE Board Service List

Contact:

)lans Schierling x28423 OFFICE/

'SURNAI4EP DATEP

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

~

~ 0 ~

I ~ ~ ~

~ ~ ~ ~ ~

~ ~ ~

~ ~ ~ ~ ~ ~ I

~

~

~

~

~ ~ ~ ~ ~ ~ ~

~ ~ ~

~

~ ~ ~ i ~ ~ ~ ~ ~

~ ~

~ ~ ~ ~ ~ ~ i I ~ ~ ~ ~

~

~

~

~ ~ ~ ~

~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0

~ ~ ~ ~ ~ I ~ ~ ~ ~

~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ i

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~

0 ~ ~ ~ ~ ~

~ ~ ~

~

~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~

I NRC FORM 318110/80)NRCM 0240 OFFICIAL RECORD COPY

  • USGPO'1980 329824

U

'4 I

=

BOARD NOTIFICATION BN ac@ '47

  • w ncl osur Document Control (50-~~

NRC PDR*

L PDR*

TERA*

NSIC*

Branch Reading*

Branch Chief" Project Manager*

Licensing Assistant R. Tedesco/J.

Kerringan D. Eisenhut/R.

Purple M. Williams H. Denton/E.

Case*

PPAS J.

Youngblood A. Schwencer F. Miraglia E.

Adensam

J. Miller R. Vollmer H. Thompson R. Mattson S.

Hanauer

Attorney, OELD~

OIaE Regional Administrator Resident Inspector W. J. Dircks, EDO (3)

E. Christenbury, OELD" J. Scinto, OELD*

cc:.Board Service List

V

'V r,

DISTRIBUTION OF BOARD NOTIFICATION Diablo Canyon Units 182/COMM Docket Nos. 50-275/323 OL I

Leonard Bickwit, Esq.

Mr. Samuel J. Chil k Mr. Glenn 0. Bright Dr. John H. Buck Dr.

W.

Reed Johnson Dr. Jerry Kline Thomas S. Moore, Esq.

John F. Wolf, Esq Ms. Elizabeth Apfelberg Andrew Baldwin, Esq.

Mr. Richard E. Blankenburg Mr. Herbert H. Brown Philip A. Crane, Jr.,

Esq.

Mr. Frederick Eissler David S. Fleischaker, Esq.

Mrs.

Raye Fleming Arthur C. Gehr, Esq.

Mr. Byron S. Georgiou Mr. Mark Gottlieb Mr. Richard B. Hubbard Janice E. Kerr, Esq.

Mr. John Marrs Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Mr. James

0. Schuyler Mr. Gordon Silver

. Paul C. Valentine, Esq.

Harry M. Willis Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section Document Management Branch ACRS Members Dr. Robert C. Axtmann Mr. Myer Bender Dr. Max W. Carbon Mr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.

Carson Mark Mr. William M. Mathis Dr. Dade W. Moeller Dr. David Okrent Dr. Milton S. Plesset Mr. Jeremiah J.

Ray Dr. Paul C.

Shewmon Dr. Chester P. Siess Mr. David A. Ward

~,

gt P)*