ML16340C681

From kanterella
Jump to navigation Jump to search
Forwards Anonymous Ltr Re Allegations Concerning Deficiencies of Plant Design
ML16340C681
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/04/1982
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Deyoung R, Fitzgerald J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML16340C679 List:
References
NUDOCS 8207140364
Download: ML16340C681 (8)


Text

~E -~~

gP*

O

~

Ih

.v r+

+>>*++

UNITEDSTATES

-- N EAR REGULATORY CQNINISS10~

-WASHINGTON,D;C.40555 S

JUH 4 7982 Enclosure 2

MB~iORANDUM FOR:

FROM:

SUBJECT:

James Fitzgerald, Acting Director Office of Investigations Richard C. DeYoung, Director Qffice of Inspection and Enforcement Harold R. Denton, Director Office of-Nuclear Reactor Regulation ANONYMOUS ALLEGATIONS CONCERNING-DIABLO CANYON NUCLEAR POWER PLANT The enclosed letter is forwarded for appropriate action by your office.

The individual alleging deficiencies has indicated corrective action that he would find appropriate.

NRR does plan to have the piping system'hermal/deadweight analysis included within the scope of Phase II of the Independent Design Verification Program.

Enclosure:

As stated Harold R. Denton, Director Office of Nuclear Reactor Regulation 8207140360 820629 PDR ADOCK 05000275 P

PDR

V P

P,~f.--.P~- PC/,

t--'='"-

el'

~'

3ear Nr. Richard DiYou g:-

/

I am currently involved in the Diablo Canyon Review effort now in progr'ess.: I must say that this is the worst nuclear power plant that I have ever worked-on.

and it is not SAFE.- I was hoping with the'introduction of Bechtel that a complete re-analysis of Unit 1 would be done.

Alas this is not to be.

The PGLE management/,

engineers only correct the mistakes that are found accidentially or are forced down their throats. If the error is an generic one., they will not review. everything but just what caused the error and they will only correct;,:.-

that one mistake.

The lateat review is for-hosgri only -'-.':-.'--.".,'

but the real danger. is that:

1) The thermal/deadweight analysis does not match

, the seimic or current. field support configuration Systems are failing when corrected.

h

2) The so-'called -'As-Built"~i~e "support-dravriegs-"

're.not as-built but instead are the accumulation ~::,"-

of 'all the changes to the support drawing over the

'.'ast.13 years The support have not 'been walked -"---;.-..'.

down in the.-.fie1d- *to show:there. latest.configuration~~~'-"::-

', or orientation to the pipe':Also interfer'encesuth-':-=-;.=-,--.';".-':

structure are not.show on the drawings

. I 'only ask that you have R. 2

. Cloud 8 Associates--

=-,

.~='-;.-

review the thermaI/Deadweight analysis as well as the'osgri they are now. doing.

This will confirm what.I have--.".';:-

said. If action is not taken, I may be.force to seek a public hearing" on this. 'I am pro-nuclear but.invalid analysis andincompetence must not be igored. This paint in my opinion is bad from the analysis to the supports.

P Thank you for your. time.

Sincerely r

A Concered'ng'ineer

'J

~

a i

DISTRIBUTION OF BOARD NOTIFICATION Diablo Canyon Units 1&2/COh1N Docket Nos. 50-275/323 OL Leonard Bickwit, Esq.

Nr.

Samuel J. 'Chilk Nr. Glenn 0. Bright Dr. John H. Buck

"'r.

W.

Reed Johnson Dr. Jerry Kline-Thomas S. Moore, Esq.

John F.

Wolf, Esq s

'I Ms. Elizabeth Apfelberg Andrew Baldwin, Esq.

Mr. Richard E. Blankenburg Nr. Herbert H. Brown Philip A., Crane, Jr.,

Esq.

Nr. Frederick Eissler David S. Fleischaker, Esq.

Nrs.

Raye Fleming Arthur C. Gehr, Esq.

Mr. Byron S. Georgiou h1r.

hlark Gottlieb Nr. Ri chard B. Hubbard Janice E. Kerr, Esq.

Nr. John Marrs Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Nr. James, 0. Schuyler Mr. Gordo'n Silver Paul C. Valentine, Esq.

Harry li. (illis Atomic Safety and Licensing Board Panel Atomic Sa'fety and Licensing Appeal Panel Docketing,'nd Service Section Document I1anagement Branch ACRS Members Dr. Robert C. Axtmann Mr. Hyer Bender Dr. Hax W. Carbon Hr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.

Carson Hark Mr. William M. Hathis Dr.

Dade W. Moeller Dr. David Okrent Dr. Milton S. Plesset Mr. Jeremiah'.

Ray Dr. Paul G.

Shewmon Dr. Chester 'P. Siess Mr. David A. Ward

~

~

C 4,

l

BOARD 50TI FICATION BN-7Q bK

  • w/enclosure

~Document Control

(.50=4%)*

NRC PDR" L PDR*

TERA*

NSIC*

Branch Reading*

Branch Chief" Project Manager*

Licensing Assistant R. Tedesco/J.

Kerringan D. Eisenhut/R.

Purple M. Williams H. Denton/E.

Case*

PPAS J.

Youngblood A. Schwencer F. Miraglia E.

Adensam J. Hiller R. Vollmer H. Thompson R. Mattson S.

Hanauer

Attorney, OELD*

OISE Regional Administrator Resident Inspector W. J. Dircks, EDO (3)

E. Christenbury, OELD*

J. Scinto, OELD*

cc:

Board Service List

h'L a

'l

~ 1 ~

H J

~

N II