ML16340C647

From kanterella
Jump to navigation Jump to search
Board Notification 82-61:forwarding Info Items Re Design Verification Program,Phase 1.Info Relevant to Safety Issue on Design Adequacy
ML16340C647
Person / Time
Site: Diablo Canyon 
Issue date: 06/18/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Ahearne J, Gilinsky V, Palladino N
NRC COMMISSION (OCM)
Shared Package
ML16340C648 List:
References
TASK-AS, TASK-BN82-061, TASK-BN82-61 BN-82-061, BN-82-61, CLI-81-30, NUDOCS 8207070047
Download: ML16340C647 (8)


Text

Docket No.:

50-275 JUN I 8 mg MEMORANDUM FOR:

Chairman Palladino Comoissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROM:

SUBJECT:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation INFORMATION ITEMS REGARDING TME DESIGN VERIFICATION PROGRAM-PHASE 1

FOR DIABLO CANYON, UNIT 1 (Board Notification No. 82-61)

In accordance with present NRC=procedures for Board Notifications, the following is enclosed for information of the Commission:

1.

First Interim Technical

Report, issued by R. L. Cloud Associates and transmitted to G. Maneatis, et. al. by letter dated June 9, 1982 2.

Transcript of meeting on Diablo Canyon IDVP on June 10, 1982 in Waltham, Massachusetts 3.

Trip report of NRC Audit of IDVP activities at Teledyne Engineering Services, dated June 9, 1982 Enclosure,.l.-provides present conclusions of the Independent Design Verification Program I IDVP) ui respect to additional verification and sampling required to complete Phase I of the IDVP. It is based on the present status of the generic sample evaluation by R. L. Cloud Associates (RLCA) and was approved by Teledyne Engineering Services (TES), the IDVP Program Manager.

The submittal is in accordance with the TES Program Management Plan of March 29, 1982.

Additional reports will be submitted (possibly as many as thrity) when specific tasks of the program have been completed.

A final technical report on the IOVP will be submitted by PG8E in accordance with Commission Order CLI-81-30 of November 19, 1981.

The second enclosure provides the verbatim transcript of a meeting on June 10, 1982 in Maltham, Massachusetts at which TES and PGSE provided NRC management ivith a status report and schedule for the IDVP.

0'207070047 820618 PDR ADOCK 05000275 suRl P

PDR DATEt)s

~ ~ ~ ~ ~ ~

C FORM 3I8 IIO/80) NRCM 8240 OfFICIALRECORD COPY w USGPO. )980-329 824

P V

n u

1 J

t h 3 ~

Y=

The Commission JUN 18 Enclousre 3 is a trip report of an NRC audit of the IDVP activities at the TES offices in Maltham, Massachusetts.

The information in the enclosures is relevant to the safety issue on the design adequacy of Diablo Canyon, Unit 1.

This is the subject of Commission Order CLI-81-30 which is the basis for the IDVP.

The staff is evaluating the information presented in Enclosure 1 as part of its ongoing review of the IDVP efforts and in particular with respect to the adequacy of Phase I of the program.

Enclosures:

As stated Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc:

'ASLBP ASLAP SECY OGE OPE Board Service List

Contact:

Hans Schierling X28423 Distribution: -~

%T OFFICE/

SURNAME/

.OATED L: LBInI3 Sch'ier'f

/

/82 DL:

F 6/

a

~ ~

82 DL:

R sco 6/

/~ /82

~ ~ ~ ~

~ ~

~ ~

~

~

~ 0

~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

enhut

~

~

~

~ ~ ~

~

~ ~ ~ ~

NRC FORM 3IB IIO/801 NRCM 0240 OFFICIAL R ECOR D COPY

  • USGFO'. 1980-329-824-

J W

\\ '

L DISTRIBUTION OF BOARD NOTIFICATION jyg

~" ~ >"

UPS<>>

y yy y

Diablo Canyon Docket Nos. 50-275, 50-323 Mrs. Elizabeth Apfelberg Andrew Baldwin, Esq.

Richard E. Blankenburg Mr. Glenn 0. Bright Herbert H. Brown, Esq.

Dr. John H. Buck Philip A. Crane, Jr.,

Esq.

Mr. Frederick Eissler David S. Fleischaker, Esq.

Hrs.

Raye Fleming Arthur C. Gehr, Esq.

Bryon S. Georgiou Mr. Mark Gottlieb Mr. Richard B. Hubbard Dr.

W.

Reed Johnson

.Janice E. Kerr, Esq.

.Dr. Jerry Kline Hr. Jonn Marrs Thomas S. Moore, Esq.

Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Mr. James

0. Schuyler Hr. Gordon Silver Paul C. Valentine, Esq.

Harry H. Willis, Esq.

John F. Wolf, Esq.

Atomic Safety and Licensing

,Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section Document Management Branch ACRS Members Hr. Hyer Bender Dr. Hax W. Carbon Hr. Jesse C. Ebersole Hr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J:

Carson Mark Mr. William M. Mathis Dr.

Dade W. Moeller Dr. David Okrent Dr. Hilton S. Plesset Mr. Jeremiah J.

Ray Dr. Paul G.

Shewmon Dr. Chester P. Siess Mr. Davis A. Ward Dr. Robert C:. Axtmann

I I

I I

BOARD NOTIFICATION BN-82-61

  • w/enclosure Document Control.(50<75 )*

NRC PDR*

L PDR*

TERA*

NSIC*

Branch Reading*

Branch Chief*

Project Manager*

Licensing Assistant R. Tedesco/J.

Kerringan D. Eisenhut/R.

Purple M.

W<i,1 1iams H. Denton/E.

Case*

PPAS J.

Youngblood A. Schwencer F. Niraglia E.

Adensam J. Miller R. Vollmer H.

Thompson R. Mattson S.

Hanauer

Attorney, OELD*

OI8E Regi onal Adininis trator Resident Inspector W. J. Dircks, EDO (3)

E. Christenbury, OELD*

J. Scinto, OELD*

cc:

.Board Service List