ML16340C451
| ML16340C451 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/22/1982 |
| From: | Schierling H Office of Nuclear Reactor Regulation |
| To: | Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8204020151 | |
| Download: ML16340C451 (14) | |
Text
Docket No. 50>>275 WAR 22 $8R flEf10RANDUM FOR:
FROM:
SUBJECT:
F. 0. Miraglia, Chief, Licensing Branch No. 3, DL H. E. Schierling, Project Manager, Licensing Branch No. 3,'oDL NOTICE OF MEETING HITH PACIFIC GAS & ELECTRIC COMPANY AND CONTRACTORS - DIABLO CANYON, UNIT 1, DESIGN VERIFICATION PROGRAM Date & Time:
Location:
Purpose:
Thursday
& Friday March 25 & 26, 1982 9:00 Afl - 4:00 PH Room P-llG Phil lips Building 7920 Norfolk Avenue
- Bethesda, MD March 2R,~ To discuss the organizational structures for 3~e~es gn Verification Program, Phases, I and II and to discuss issues pertaining to revisions'.,'of the Phase I program (preliminary agenda items attached).
f1arch 26 - To discuss staff questions pertaining to the 97i au~fK reviews performed by R. F. Reedy, Inc.
(preliminary agenda items attached).
Participants:
NRC D. Eisenhut R. Vollmer R. Tedesco J. Knight F. fiiraglia ll. flaass H. Schierling B. Buckley J.
Crews T. Bishop P. Morrill M. Messier RG&E G. Maneatis D. Brand D. Hoch, et.al, PG&E contractors for Phase I and proposed contractors for Phase II as appropriate, P
lI SURNAME/
~ s ~ s ~ so ~ ~ ~ ~ ~ sto ~ ooo
~ ~ ~ ~
cc:
Fe'e ll x P
9 oy tgo\\ ~
ops
~ yo
~ soo ~
DATEP
~ ~ ~ ~
NRG FORM 318 (10-80) NRCM 0240 i 99 4 0500027>t g5Z 820322
'.>>R "
poa OFF.
i,.-o
~ o
~ ~ s ~ ~
Hans E. Schier ling, Project tfanager Design Perification Program f.jxeOS<.ng....
P.iv.ixion..qf.
.DL '..LB83 HScgierl ng Ftliragli a
.3/()/82......
3/.lf/8P.....
OFFfcfAL RECORD COPY USGPO: 1981~960 j
Ze a
1 I
'lO
~.
1
AGENDA ITEMS (PRELIMINARY)
I.
March 25 1982 Meetin 1.
Teledyne qualifications in civil-structural aspects of nuclear power plant design.
2.
Teldyne procedures and criteria for evaluation of current con-tractor performance to date and in future Phase I activities.
3.
Consolidation into single Phase I program plan of earlier Phase I submittals and inclusion of required NRC revisions and of potential additional revisions by Teledyne.
4.
Proposed organizational structure and contractors for Phase I
of design verification program.
5.
Information on independence (financial and technical) and qualifi-cations of proposed Phase II contractors.
1I,
AGENDA ITEMS (PRELIMINARY)
II.
March 26, 1982 l.
Criteria for evaluation of gA programs; applicability of selected parts of ANSI N45.2.11 considered for guidance in evaluating PGEE gAP.
2.
Implementation of the gA program by PGEE relative to its assigned "audit role."
3.
Applicability of gA manual to Unit 1.
4.
Impact of organization change in 1972 relative to effective-ness of implementation of gA program.
5.
Verification of design work accomplished by service related contractors prior to requirement for contractor to apply gA in 1977-1979 time frame.
6.
Current assessment of overall gA program effectiveness based on review and evaluation performed to date.
Mr. 11alcolm H. Furbush Vice President
- General Counsel Pacific Gas
& Electric Company P.O.
Box 7442 San Francisco, California 94 120 cc:
Philip A. Crane, Jr.,
Esq.
Pacific Gas
& Dectric Company P.O.
Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 t4".Allister Street San Francisco, California 94 102 Mr. Frederick Eissler, President Scenic Shoreline Preservation Conference, Inc.
4623 More tlesa Drive Santa
- Barbara, Cali fornia 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Lui s Ob i spo, Ca 1 i forni a 93401 t)r. Gordon A. Silver tls.
Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401
)<a rry N. h'i 1 1 is, E sq.
Seymour
& hillis 601 California Street, Suite 2100 San Francisco, California 94108 Mr. Richard Hubbard tlHB Technical Associates Suite K
1723 Hamilton Avenue San Jose, California 95125 t)r. John Marrs, tlanaging Editor San Luis Obispo County Telegram-Tribune 1321 Johnson Avenue P.
0.
Box 112 San Luis Obispo, California 93406
0
tIr. Malcolm H. Furbush cc:
Resident Inspector/Diablo Canyon NPS c/o U. S-Nuclear Regulatory Commission P. 0. Box 369 Avila Beach, California 93424 ljs. Raye Fleming 1920 Hattie Road Shell beach, California 93440 Joel-Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 Nest Pico Boulevard Third Floor Los Angeles, Cali fornia 90064 Paul C. Valentine, Esq.
321 Lytton Avenue Palo Alto, California 94302 Nr. 'byron S. Georgiov Legal Affairs Secretary Governor's Office State Capitol Sacramento, California 95814 Herbert H. Brown, Esq.
Hill, Christopher 5 Phillips, P.C.
1900 it Street, N.W.
'washington, D.C.
20036 fir. Dick Blankenburg, Editor 5 Co-Publisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 t1r. Jam s 0. Schuyler Vice President
- Nuclear Generation Department Pacific
( as 8 Electric Company P.O.
Box 7442 San Francisco, California 94120 Bruce Norton, Esq.
Suite 202 3216 North 3rd Street Phoenix, Arizona 85012
'c
Nr. Nalcolm H. Furbush Mr. W. C. Gangloff Westinghouse Electric Corporation P. 0.
Box 355 Pittsburgh, Pennsylvania 15230 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101 Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Nr. Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street, N.W.
Suite 1180 Washington, D.c.
20036
tt e
a 1
0
~
1
~
Docket File 50- 275 NRC PDR Local PDR NSIC TERA LB83 Files E.
Case
. D.
Eisenhut'.
Purple R.
Tedesco B. J.
Youngblood A. Schwencer F. Miraglia E.
Adensam J
~ Miller G. Lainas T. Ippolito B. Russell D. Crutchfield T.
Novak S.
Varga D. Vassallo R, Clark J. Stolz R. Vollmer J.
Knight R.
Bosnak F.
Schauer R. Jackson G. Lear
- Attorney, OELD OIE (3)
ACRS (16),
OSD (7)
J.
- LeDoux, I&E B. Grimes, I8E M: Williams, DL W. John'ston S. PawlicRi V. Benaroya Z, Rosztoczy W.
Haass D. Muller R. Ballard W.
Regan
'A. Toalston MEETING NOTICE DISTRIBUTION I&E Region I I&E Region II I&E Region III I8E Region IV I&E Region V
.NRC Partici ants D.
R.
R.
J.
F.
W.
H.
B.
R.
T.
M.
0.
F.
B.
L.
R.
W.
F.
L.
W.
C.
Eisenhut Vollmer Tedesco Knight Miraglia Haass Schierling Buckley Mattson Speis Srinivasan Parr Rosa
- Sheron, Acting G.
Hulman Houston Gammill Congel Rubenstei n Butler Berlinger F. Schroeder K, Kniel D. Skovholt G. Knighton M. Ernst A. Thadani W, Minners S.
Hanauer H. Thompson JZwolinski P. Collins D.
Ziemann V. Moore Regional Administrator bcc:.
Applicant Servic R. Engelken Branch LBg3 Project Manager c e'er ing uckley Licensing Assistant J.
Lee
II