ML16340B726

From kanterella
Jump to navigation Jump to search
Informs That Licensing Process Delayed Due to TMI Accident & Need for New Safety Requirements.Hearings Will Commence in May 1981 on Diablo Canyon Licensing and Jul 1981 for San Onofre
ML16340B726
Person / Time
Site: Diablo Canyon, San Onofre  Pacific Gas & Electric icon.png
Issue date: 04/10/1981
From: Kammerer C
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Lowery B
HOUSE OF REP.
Shared Package
ML16340B727 List:
References
NUDOCS 8105120423
Download: ML16340B726 (2)


Text

\\0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 7WSZ3 <

DOCKf T iHUM2FR p( ] p(~

PROD. 5 UIiLF~.C...,,..

Dear Congressman Lowery:

tgii REg 4

~o 4

4

+i APR 1 0.1a81 I i'lLtiiii The Honorable Bii1 Lowery United Sta.ies House of Represeniatives Washington, O.C.

20515

>oc Jf/gy SAIC 0

~<<Cd~jOn Thank you for your recent le..er on behalf of your constituent, Georae

Kidd, who is concerned about NRC Iicensing delays relat d to the Diablo Canyon nuclear facility near San Luis Obispo and ihe San Onofre nuclear plant.

Following ihe accident at Three Mile Island, ihe Commission did not issue any further opera.ing licenses for over a year while a thorough review was made o

implications o

the acciden In the spring o

1980, the Commission approved new requirements for operaiing licenses based on he. lessons learned from Three Mile Island.

Since tha time several new opera.ing lic nses have been

issued, ihe mos recen.

being for Farley Unit 2 in Alabama on March 31, 1981.

The diversion oi resources and he rethinking of sa eiy requiremenis following the TiiMI accident adversely affected licensing aciivity ai ihe CofnIIission.

As a result, we estimate thai in 1981 and 1982 approxif-a ely a dozen nuclear pianis will be completed frcm 1 to 12 monihs before a full power license decision can be made.

The Commission is concerned about ihis si uaiion and is takina a number o

steps io correct it.

These s.eps are cu.lined in the a iiached tes.imony given by Chairman Hendrie on Apr i 1 2 befor e ihe House Approoriations SubcoIr5it ee on Energy and Wai r Oeveiopmen..

With respect to ihe Diablo Canyon units, an updated Suoplemental Safe y

="valuation Repori (SS:R)

=or low-power operaiion was issued by ihe iIRC staff on March 5,

1981, Hearinas will ccmience in May wi ih a licensina decision on low-power operation expec.ed in February 1982 and on a fufl-pcwer license in Mafch 1982.

These prcjec ed decision dates would mean a thir een monih delay using ihe applicani's construction comoie ion date and an el ven month delay using the NRC siaf-,'s.

The aeologic and seismic SSFR ior San Onoire Uni is 2 and 3 was issued by ihe NRC s iaff in December

1980, The SER and a

SSaR on Three Mile Island-relaied maiiers was issued in February 1981.

A concurrina let er from he Advisory Commi itee on Reac.or'Safeguards was received on March 17, f981.

The hearinc cn issuance of an oceratina license is expected to s iar in July 1981 with a decision or.

a full power license projected for notil 1982.

Tne aopficant es ilma ies a cons iruc ion ccmpl e i on de ie oi June 1981 whi le NRC s taf i estima e

construe-ion will not be ccmplete until Octobef 1981.

These estimates pl cec.

a delay of beiween o and 10 monihs decending on the est,mates used.

I hope tha. ihis in orfiia icfl is helpiui in responding to your constitueni.

Sincerely, p5d>

Car 1 ton KafrIIerer, Director Office of Conaressional A, fairs

1 l1

'I I