Text
UNITED STATES OF AthERICA NUCLEAR REGU'TORY COllt<ISSION BEFORE THE ATONIC SAFETY AND LICENSING BOARD 4
In the l1atter of
)
5
)
6 PACIFIC GAS AND ELECTRIC CONPANY
)
7
)
8 (Diablo Canyon Nuclear Power Plant
)
9 Unit Nos
~
1 and 2)
Docket Nos.
50-275 O.L.
50-323 O.L.
10 TESTIMONY OF BARTHOLOMEW C.
BUCKLEY 11 q.
Please state your full nane.
12 A.
Bartholonew Christopher Buckley.
13 g.
By whoia are you enployed?
14 A.
The Nuclear Regulatory Connission (NRC).
15 g.
Describe the nature of your work with respect to the Diablo Canyon 16 opera.ing license proceeding.
17 A.
Since tiarch ll, 1979, as a Senior Licensing Project Manager, I an 18 19 20 responsible for the nanagenent of the NRC Staff's safety review and the preparation of safety evaluation reports in support of the issuance of operating licenses for Diablo Canyon, Units 1
8 2.
21 g.
Have you, in the course of your professional experience, had 22 occasion to act as a project nanager for plants other than Diablo 23 Canyon?
24 A.
Yes, the Rancho Seco and Crystal River Nuclear Power Plants.
8xogzso o(l
,l
<a I 25 g.
Would you detail your professional qualifications?
26 A.
Attached is a copy of my professional qualifications.
27 g.
Are you familiar with the SER and supplements thereto which have 28 been issued for the Diablo Canyon t(uclear Facility?
29 A.
Yes.
30 g.
Did you participate in the preparation of those documents?
31 A.
Yes.
32 g.
Please detail the extent of your participation in the preparation of 33 the SER and Supplements thereto for the Diablo Canyon Nuclear 34 Faci 1 ity.
35 A.
After receipt of SER inputs from the various technical
- branches, I
37 prepared Supplements l/umber 9, 10, 11, 12, 13 and 14.
The Safety Evaluation Report, dated October 16,
- 1974, and Supplements 1 through 8 were prepared by other project managers.
39 g.
Would you please identify all the individuals who prepared the 40 sections of the SER and Supplements thereto which relate to the 41 contentions admitted in this low power proceeding?
42 A.
Emergency Planning:
Peter Tam (former NRC employee); Relief and 43 Safety Val ves:
Edgar Hemminger 44 g.
Have you reviewed the input to the SER of the above identified individuals?
E' 45 A.
Yes.
47 g.
Do you agree with the analysis and conclusions reached by those 4S individuals within the liioits of your professional expertise?
49 A.
Yes.
50 Q.
Considering that review do you, based on your professional 51 experience, have any concern that the issues raised by the adi~itted contentions indicate any danger to the public safety and heal h by 53 operation of the Diablo Canyon Nuclear Facility at low power?
54 A.
Ho.
UNITED STATES OF AtlERICA HUCLFAR REGULATORY COt'olISSIOH BEFORE THE ATOHIC SAFETY AHD LICEHSIHG BOARD In the Hatter of
)
)
PACIFIC GAS AHD ELFCTRIC COj1PAHY
)
)
(Diablo Canyon Nuclear Power Plant
)
Unit Hos.
1 and 2)
)
Docket Hos.
50-275 O.L.
50-323 O.L.
BARTHOLOJ1EW C.
BUCKLEY PROFESSIOHAL gUALIF I CATIOHS DIVISION OF LICENSING I
am a Senior Project lianager of the Staff of the U.
S.
Nuclear Regulatory Commission.
I am responsible for the management of the NRC Staff's safety review and the preparation of safety evaluation reports in support of the issuance of operating licenses for Diablo.Canyon, Units 1
and 2.
I received a Bachelor of Chemical Engineering Degree at the Catholic University of America in 1958 and I studied for a Waster's Degree in Nuclear Engineering at the above cited University.
I started my employment with the Regulatory staff on January 3,
1972 and have worked as a Project thanager in Operating Reactors Branch and as a Section Leader in the Division of Operating Reactors.
I was employed at the Naval Nuclear Power Unit, Fort Belvoir, Virginia from 1966 to December 1971.
I worked as a chemical engineer for approximately two years, and as Director of the Engineering Depart-ment until December 1971.
From 1960 to 1966 I worked at the Atomic Energy Division of Allis Chalmers.
I prepared primary system and auxiliary preoperational test
procedures and conducted and evaluated these preoperational tests at tne Elk River Reactor.
I also prepared a water chemistry manual and performed water chemistry analyses at the Elk River Reactor.
I prepared all fluid systems preoperational test procedures for the LaCrosse Reactor and taught plant operating personnel in the design and operating asoects I
of certain systems.
I worked as a process control engineer at the HELPER Co. located in Virginia fron 1958 to 1960.
0 S