MEMORANDUM FOR:
R. L. Tedesco, Assistant Director for Licensing, DL FROM:
THRU:
SUBJECT:
B.
C. Buckley, Project Manager, Licensing Branch,No. 3, DL F. J. Miraglia, Acting Chief, Licensing Branch No. 3, DL STATUS OF OUTSTANDING ISSUES ON DIABLO CANYON, UNITS 1
& 2 As requested by your March 11.
1981 memorandutt1, enclosure (1) delineates the issues for which information from PG&E has been submitted but no SER input have been received.
Enclosure (2) identifies those issues that PG&E must provide and the expected submittal dates from PG&E.
cc:
H. Denton D. Eisenhut Division Directors Bart Buckley, Project Manager Licensing Branch No.
3 Division of Licensing DISTRIBUTION
'ocket File 50-275/323 PDR LPDR NSIC TERA LB¹3 Files BBuckley FMirag 1 i a JLee
~82 ~32@ 0 Il~,
OFFICE)
SURNAME/
OATEP
...L BCBuckley: jb 3/IS/81
..J.B FJ 3/
L
~ ~ ~ ~
gila 1
~ ~ ~ ~ ~ ~ ~
0 ~ ~ ~ ~
~ ~
~ ~
NRC FORM 318 IIO/80)NRCM 0240 OFFICIAL RECORD COPY 9 USGPO; 19S~294124
~~e p
M8t ai @,,
~'
If If'
quan nac><s
~cN 0
":$4$llaj'g
+a**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAR 16 1S81 MEMORANDUM FOR:
R.
L. Tedesco, Assistant Director for Licensing, DL FROM:
THRU:
SUBJECT:
B.
C. Buckley, Project Manager, Licensing Branch No. 3, DL
~
~
. J. Miraglia, Acting Chief, Licensing Branch No. 3, DL STATUS OF OUTSTANDING ISSUES ON DIABLO CANYON, UNITS 1
5 2 As requested by your March ll, 1981 memorandum, enclosure (1) delineates the issues for which'information from PG&E has been submitted but no SER input have been received.
Enclosure (2) identifies those issues that PGLE must provide and the expected submittal dates. from PG8E.
cc:
H.
Denton D. Eisenhut Division Directors Bart Buckley, Project Manager Licensing Branch No.
'3 Division of Licensing
OPEH ISSUES -
I::FC;.:-:.-.TIO." H~S BEEl( SUBhITTEO BY PGKE Plant c...e:
."'.= lo Canyon, Units 1
and 2
Techr~".al i"".. -..
DL fol Full Power SSER):
3/17/81 Project Varacer:, Bart Bvckley Ex tens ion:
28355 Oate:
i'!arch 6, 1981 (5:00)
DIVi~iO.'i B4."CH OSI RSB RE V I E'h'ER Orr Fi tzpatri ck OPEH ISSUES II. Y,.3 Item 17 -
ECCS outages Item 25 Effect of Loss of AC power on Pump seals Item 30 -
SB LOCA Analysis Item 31 - Plant Specific.
Anal
~
II.E.3.1 Emerg.
Power Supply for Pressure Heaters STATUS COi:u~iE <TS Heed PTRB Review of Procedures-Heed OLB Review of Training AEB CSB CPB Lewis Pulsipher Huang III.A.2 Appendix E meteorology II.F.1 Items 2(d), 2(e), 2(f)
-II.E.4.2 Containment Isolation Dependability II.F.2 Instr. for detection of Inadequate Core Cooling S
5 DOE NEB Hemminger II.D.1 Safety 8 Relief Yalve Test.
A l
O."-"-!l ISSUES Ii:;".=... TIOll H" 5 BEEN SUBllITTED BY PGSE
- 'lan'"=-...
- i"i -bio Canyon, Units 1 and 2
Techr -a 1 !n".~ "o DL or Full Po:;er SSER):
3/17/81 Project
>'lanacer:
Bart Bvckley Extension:
28355 Date:
".arch 6, 1981 (5:00)
DIVIS!G DE EPPO BRA'HACH EQB EPLB RE V!E'n'E R Ashe Tam OPEC ISSV"S II.B.2 Plant Shield>ng Equ>p.
Qual-Appendix f STATUS S
COi'O'E'i TS On schedule
- received draft SER DSI
-CSB RSB Pvlsipher Orr Heat Trans er Sump Debris
0
~ vr
('/
OPEN ISSUES -
IilFORI')ATION HAS NOT BEEN SUBi'iITTED BY PG&E Plant.::arne:
Diablo Canyon, Units 1
and 2
Technical ln ut to DL for Full Power SSER:
3/17/81 Project Hang er:
Bart Buckley Extension:
28355 Date:
Harch 6, 1981 (5:00)
DIVISION BRANCH REVIEWER OPEN ISSUES STATUS COSINE NTS DSI RSB Orr II.K.2 Item 13 - Thermal tlechanical Report Item 17 - Voiding in RCS Due in formally 3/13/81 Due in formally 3/13/81 EPPO ETSB CPB Orr Serbu Boegli Boegli Huang Talll
'I Item 19 - Benchmark Analysis SEQ.
,F]ow II.K.3 Item 1 -'uto PORV Isol Item 5
- Auto Trip of. RCPs II.B.2 Shielding Design II.B.3 Post Accident Sampling III.D.l.1 Outside Containment Leakage II.B.3 Post Accident Salllpling II.F.2 Instr. for detection of Inadequate Core Cooling Earthquake Letter A
A A
Due in formally 3/13/81 PG&E Submittal due 3/13/81 PG&E Submittal due 3/13/81 Draft due 3/13/81; Final on 3/16/81 Final due in 3/13/81 Due in 3/13/81 from PG&E Due 'in 3/13/81 from PG8E Phone call scheduled for 3/13/81 Due in from PG&E 3/13/81
I
~
~
l
~ $
OPEN ISSUES Ii'lFOR",ATION HAS NOT BEEN SUBMITTED BY PGFE Plan'"arne:
Diablo Canyon, Units 1 and 2
Techrical I'nout to DL for Full Power SSER):
3/17/81
~ Project Mana er:
Bart Buckley Extens i on:
28355 Da te:
Ma rch 6, 1981 (5: 00)
DIYISIOlI SRANCH
.DE
EOB QAB MTEB SEB HGEB CHES AMSS R EYI E 'n E R Ashe Spraul Halapatz
. Lipinski Fl iegel Harrison OPEN ISSUES Envir. Qual. of Class IE Eq.
Acceptability of QA-Ql list and reviews of 1/22/81
Response
to QA program GDC-51 Masonry Walls Breakwater structure damage Appendix R (Fire Protection)
Securi ty STATUS A
CO'RENTS Draft received 3/3 (Formal Submittal due 3/18)
Draft due in 3/16/81; Final due in+
3/18/81 PG8E Submittal due 3/13/81 Draft received 3/12/81; Final PGEE submittal due 3/13/81
'Due in 3/20/81 Phone call scheduled for 3/13/81-if phone call successful formal submittal will be in 3/16/81.
Submittal due 3/13/81
0
~ '
~
~
J