1 NRR-PMDAPEm Resource From:
Gary D Miller (Generation - 6) <gary.d.miller@dom.com>
Sent:
Tuesday, November 15, 2016 1:47 PM To:
Cotton, Karen
Subject:
[External_Sender] RE: Clarification on Responses to RAIs 2 and 3
- Karen, In response to the reviewers two questions:
- 1. What about the pressurizer head-to-shell CIRCUMFERENTIAL welds?
Response: Apparently, we dropped a comma during the preparation of the RAI response. There should have been a comma after head to shell, longitudinal welds or nozzle inner radius sections as indicated below. The head to shell weld is a circumferential weld.
There has been no history of service induced degradation on the pressurizer head to shell welds, longitudinal welds or nozzle inner radius sections over the previous two (i.e., the second and third) inspection intervals.
- 2. Please confirm that ACTUAL examinations on welds 1-07 and 1-02 were performed during the FOURTH ISI interval?
Response: Yes, 4th ISI Interval examinations were performed on welds 1-07 and 1-02.
Hopefully this will address the reviewers questions. Please advise if a conference call is still desired.
Gary D. Miller, P.E.
Consulting Engineer Nuclear Regulatory Affairs Dominion Resources Services, Inc.
(804) 273-2771 or tie-line 8-730-2771 fax (804) 273-3715 gary.d.miller@dom.com From: Cotton, Karen [1]
Sent: Tuesday, November 15, 2016 10:04 AM To: Gary D Miller (Generation - 6)
Subject:
[External] Clarification on Responses to RAIs 2 and 3 Need clarification on your responses to RAIs 2 and 3.
CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The
2 information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
Hearing Identifier:
NRR_PMDA Email Number:
3195 Mail Envelope Properties (507DE8B999F8694791559F3A21A4215047C420AD)
Subject:
[External_Sender] RE: Clarification on Responses to RAIs 2 and 3 Sent Date:
11/15/2016 1:46:46 PM Received Date:
11/15/2016 1:46:55 PM From:
Gary D Miller (Generation - 6)
Created By:
gary.d.miller@dom.com Recipients:
"Cotton, Karen" <Karen.Cotton@nrc.gov>
Tracking Status: None Post Office:
OJRE10W802.mbu.ad.dominionnet.com Files Size Date & Time MESSAGE 2176 11/15/2016 1:46:55 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: