ML16335A395
| ML16335A395 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/29/2016 |
| From: | Miksa J Entergy Nuclear Operations |
| To: | Jennivine Rankin Plant Licensing Branch III |
| References | |
| Download: ML16335A395 (2) | |
Text
1 NRR-PMDAPEm Resource From:
MIKSA, JAMES P <jmiksa@entergy.com>
Sent:
Tuesday, November 29, 2016 9:40 AM To:
Rankin, Jennivine Cc:
Hardy, Jeffery A; ERICKSON, JEFFREY S; Daggett, Dustin James; Jerz, Joseph M
Subject:
[External_Sender] RE: Palisades Nuclear Plant - Transmittal of Draft Safety Evaluation for Proposed Amendment re: Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tubesheet Region
- Jennie, As requested in the NRC letter to Entergy Nuclear Operations (ENO) Inc. Palisades Nuclear Plant (PNP) - Transmittal of Draft Safety Evaluation for Proposed Amendment RE: Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tubesheet Region (CAC No. MF7435), dated November 16, 2016 (ADAMS Accession Number ML16320A253) ENO has reviewed the draft safety evaluation (SE) for proprietary content. Based on this review, ENO has concluded that the draft SE does not contain proprietary information and has no comments regarding the proprietary content of the draft SE.
Jim Miksa Regulatory Assurance Engineer Entergy - Palisades Work - (269) 764-2945 Mobile - (269) 767-2337
Hearing Identifier:
NRR_PMDA Email Number:
3192 Mail Envelope Properties (1177E005471F6A45B7EE5747CC3DE9BB6992A79D)
Subject:
[External_Sender] RE: Palisades Nuclear Plant - Transmittal of Draft Safety Evaluation for Proposed Amendment re: Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tubesheet Region Sent Date:
11/29/2016 9:40:24 AM Received Date:
11/29/2016 9:40:30 AM From:
MIKSA, JAMES P Created By:
jmiksa@entergy.com Recipients:
"Hardy, Jeffery A" <jhardy@entergy.com>
Tracking Status: None "ERICKSON, JEFFREY S" <JERICKS@entergy.com>
Tracking Status: None "Daggett, Dustin James" <ddagget@entergy.com>
Tracking Status: None "Jerz, Joseph M" <jjerz@entergy.com>
Tracking Status: None "Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>
Tracking Status: None Post Office:
JDCXMETSP001.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 746 11/29/2016 9:40:30 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: