ML16313A076
| ML16313A076 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center, 05000704, Vallecitos |
| Issue date: | 11/08/2016 |
| From: | Murray S GE-Hitachi Nuclear Energy Americas |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| SPM 16-044 | |
| Download: ML16313A076 (1) | |
Text
HITACHI SPM 16-044 November 8, 2016 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001
Subject:
Vallecitos Nuclear Center (VNC) Organization Change
References:
1 - License TR-1, Docket 50-70 (GETR) 2 - License DR-1 0, Docket 50-183 (EVESR) 3 - License DPR-1, Docket 50-18 (VBWR) 4 - License R-33, Docket 50-73 (NTR) 5-SNM 960, Docket 70-754 GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780, M/C K-84 Wilmington, NC 28402 USA (91 0) 819-5950 scott.murray@ge.com Pursuant to the Technical Specifications requirements of References 1 and 4 this 30-day report is being provided regarding a personnel change for the Site Manager, Vallecitos Nuclear Center.
Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a thirty-day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.
Effective November 7, 2016, Mr. Tom Caine is no longer the Site Manager, Vallecitos Nuclear Center and Mr. Matt Feyrer has assumed full responsibility and authority defined for this position.
For this assignment, Mr. Feyrer will be located at the VNC site.
References 2, 3, and 5 do not contain specific requirements of this nature but are listed here for completeness.
If you have any questions about this, please contact me at 910-819-5950.
s"J:dlf).
Scott P. Murray, Ma~
Facility Licensing Commitments: None cc:
D. Hardesty-NRC NRR, Washington, DC
- 0. Font, NRC NRR, Washington, DC J. Parrott, NRC NMSS Washington, DC
- 0. Siurano, NRC NMSS Washington, DC R. Browder, NRC Region IV, Arlington, TX J. Whitten-NRC Region IV, Arlington, TX