Letter Sequence Response to RAI |
---|
|
|
MONTHYEARL-16-083, License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-03-15015 March 2016 License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 Project stage: Request ML16105A4582016-04-14014 April 2016 NRR E-mail Capture - Acceptance of License Amendment Request to Revise Technical Specifications to Permit Drain-Down of the Reactor Cavity Portion of the Upper Containment Pool During Mode 3 (L-16-083) Project stage: Acceptance Review ML16279A0432016-10-0606 October 2016 Request for Additional Information Related to License Amendment Request for Upper Containment Pool Gate Installation During Modes 1, 2, & Drain Down of Upper Containment Pool During Mode 3 Project stage: RAI L-16-298, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-11-0707 November 2016 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 Project stage: Response to RAI ML16309A0812016-11-0909 November 2016 Regulatory Audit Summary Related Amendment Request Regarding Installation of the Upper Containment Pool Gate in Modes 1, 2, or 3 and the Drain-Down of the Upper Containment Pool During Mode 3 (CAC No. MF7476)(L-16-083) Project stage: Other ML16327A3772016-11-21021 November 2016 Draft RAIs Re Perry Nuclear Power Plant, Unit 1 License Amendment Request to Allow Installation of Ucp Gate During Modes 1, 2, and 3, and Drain-Down of Reactor Cavity Portion of Ucp During Mode 3 (CAC No. MF7476) (L-16-083) Project stage: Draft RAI ML16327A0182016-11-23023 November 2016 Request for Additional Information Related to License Amendment Request for Upper Containment Pool Gate Installation and Drain Down of the Reactor Cavity Portion of the Upper Containment Pool (TAC MF7476) (L-16-083) Project stage: RAI L-16-348, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-12-20020 December 2016 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 Project stage: Response to RAI ML17004A2952017-01-0505 January 2017 Safety Evaluation Report- Application for Amendment Perry Nuclear Power Plant Project stage: Approval L-17-052, Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32017-02-0606 February 2017 Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 Project stage: Supplement ML17033A0142017-02-16016 February 2017 Issuance of Amendment Concerning Revision to Technical Specifications to Permit Installation of Upper Containment Pool Gate During Modes 1, 2, and 3 (CAC No. MF7476) (L-16-083) Project stage: Approval ML17055A4212017-02-27027 February 2017 Correction to Safety Evaluation for License Amendment No. 174 Project stage: Approval 2016-12-20
[Table View] |
Similar Documents at Perry |
---|
Category:Letter type:L
MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-21-123, Response to Request for Additional Information Regarding a License Amendment Request That Revises2021-05-18018 May 2021 Response to Request for Additional Information Regarding a License Amendment Request That Revises L-21-080, Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011)2021-02-22022 February 2021 Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011) L-21-077, Response to Request for Additional Information Re 10 CFR 50.55a Request Number SR-2 Revision 0 Snubber Testing Extension2021-02-19019 February 2021 Response to Request for Additional Information Re 10 CFR 50.55a Request Number SR-2 Revision 0 Snubber Testing Extension L-21-060, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension2021-02-0808 February 2021 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension L-20-311, Response to Request for Additional Information Regarding Request for Exemption - Part 73 Force-on-Force2020-11-25025 November 2020 Response to Request for Additional Information Regarding Request for Exemption - Part 73 Force-on-Force L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML20308A4372020-11-0202 November 2020 Response to Request for Additional Information (Redacted) ML20308A4362020-11-0202 November 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 L-20-251, Response to a Request for Additional Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-09-29029 September 2020 Response to a Request for Additional Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-20-197, Response to Request for Additional Information Regarding Request to Extend License Expiration Date by Recapturing Low-Power Testing Time2020-07-30030 July 2020 Response to Request for Additional Information Regarding Request to Extend License Expiration Date by Recapturing Low-Power Testing Time ML20197A2122020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 L-20-154, Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-054, Revision 22020-06-0202 June 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-054, Revision 2 L-20-155, Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040)2020-05-0606 May 2020 Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040) L-19-182, Response to RAI Regarding an Application for Order Consenting to Transfer of License2019-08-0202 August 2019 Response to RAI Regarding an Application for Order Consenting to Transfer of License L-19-068, Response to Request for Additional Information Regarding Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions2019-03-20020 March 2019 Response to Request for Additional Information Regarding Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions L-18-239, Response to Request for Additional Information Regarding Request to Revise Containment Leakage Rate Test Intervals2018-10-26026 October 2018 Response to Request for Additional Information Regarding Request to Revise Containment Leakage Rate Test Intervals L-18-244, Response to Request for Additional Information Related to 10 CFR 50.55a Request PR-22018-10-16016 October 2018 Response to Request for Additional Information Related to 10 CFR 50.55a Request PR-2 L-18-174, Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control2018-07-24024 July 2018 Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-18-125, Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/02018-05-0202 May 2018 Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/0 L-18-061, Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement2018-03-16016 March 2018 Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement L-18-023, Response to Request for Additional Information Regarding a Request to Amend the Technical Specifications2018-01-30030 January 2018 Response to Request for Additional Information Regarding a Request to Amend the Technical Specifications L-17-372, Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088)2017-12-23023 December 2017 Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) L-17-200, Response to NRC Inspection Report and Preliminary White Finding2017-06-14014 June 2017 Response to NRC Inspection Report and Preliminary White Finding L-16-348, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-12-20020 December 2016 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-16-326, Response to Request for Additional Information Regarding the Near-Term Task Force (NTTF) Recommendation 2.1 Flood Hazard Reevaluation Report2016-11-0909 November 2016 Response to Request for Additional Information Regarding the Near-Term Task Force (NTTF) Recommendation 2.1 Flood Hazard Reevaluation Report L-16-298, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-11-0707 November 2016 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-16-246, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2016-10-19019 October 2016 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-16-252, Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-08-19019 August 2016 Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations L-16-160, Pant - Response to Request for Additional Information Regarding VIO 05000440/201510-012016-06-14014 June 2016 Pant - Response to Request for Additional Information Regarding VIO 05000440/201510-01 L-16-108, Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan2016-04-22022 April 2016 Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush L-16-005, Response to Request for Additional Information and Submittal of Supplemental Financial Information Related to Application for Transfer of License and Conforming License Amendment2016-01-18018 January 2016 Response to Request for Additional Information and Submittal of Supplemental Financial Information Related to Application for Transfer of License and Conforming License Amendment L-15-235, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-4252015-08-24024 August 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-425 2022-07-14
[Table view] |
Text
FENOC' Perry Nuclear Power Plant P.O. Box 97 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 David B. Hamilton 440-280-5382 Vice President November 7, 2016 L-16-298 10 CFR 50.90 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (UCP) Gate Installation in MODEs 1. 2. and 3, and Drain-Down of the Reactor Cavity Portion of the UCP in MODE 3 (CAC No.
MF7476)
By letter dated March 15, 2016 (Accession No. ML16075A411 ), FirstEnergy Nuclear Operating Company (FENOC) submitted to the Nuclear Regulatory Commission (NRC) a license amendment request for the Perry Nuclear Power Plant (PNPP). The proposed amendment would modify Technical Specification (TS) 3.6.2.2, "Suppression Pool Water Level," and TS 3.6.2.4, "Suppression Pool Makeup (SPMU)
System," to allow installation of the reactor well to steam dryer storage pool gate in MODEs 1, 2, and 3. The proposed amendment would also create a new Special Operations TS, TS 3.10.9, "Suppression Pool Makeup - MODE 3 Upper Containment Pool Drain-Down," to allow draining of the reactor well portion of the upper containment pool in MODE 3.
By letter dated October 6, 2016 (Accession No. ML16279A043), the NRC requested additional information to complete its review. FENOC's response to this request is attached.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager- Fleet Licensing, at (330) 315-6810.
Perry Nuclear Power Plant L-16-298 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on November _i_, 2016.
Sincerely, David B. Hamilton
Attachment:
Response to Request for Additional Information cc: NRC Region Ill Administrator NRC Resident Inspector NRC Project Manager Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)
Utility Radiological Safety Board
Attachment L-16-298 Response to Request for Additional Information Page 1 of 6 By letter dated March 15, 2016, FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request for Nuclear Regulatory Commission (NRG) review and approval. By letter dated October 6, 2016, NRG staff requested additional information to complete its review. The requested information is presented in bold type, followed by the FENOC response.
- 1. General Design Criteria (GDC) 16 requires that the reactor containment and associated systems shall be provided to establish an essentially leak-tight barrier against the uncontrolled release of radioactivity to the environment and to assure that the containment design conditions important to safety are not exceeded for as long as postulated accident conditions require. Describe the containment spray system (CSS) actuation timing and summary of inputs used in calculating CSS set point. Confirm that the GOTHIC analyses performed in support of this LAR [license amendment request] do not impact the CSS set points described in Section 6 of the PNPP updated safety analysis report.
Response
The analytical limit for the containment spray initiation setpoint was specified by the General Electric design of the Perry Nuclear Power Plant (PNPP) as 23.7 pounds per square inch absolute (psia) or 9 pounds per square inch gauge (psig) [23.7 - 14.7 = 9].
The 9 psig value is cited in the PNPP Updated Safety Analysis Report (USAR),
Section 6.2.1.1.5.4. The PNPP setpoint calculation methodology utilizes the General Electric, NEDC-31336, "Instrument Setpoint Methodology." The PNPP containment spray initiation setpoint analytical limit is 23.42 psia, which is based on the specific atmospheric pressure value at the PNPP of 14.42 psia. In determining the setpoint allowable value, the setpoint calculation considers loop accuracy, loop calibration, process measurement accuracy, primary element accuracy, and voltage drop. In determining the nominal trip setpoint, the methodology also factors in loop instrument drift. All but the voltage drop are combined by "square root sum of the squares,"
resulting in a calculated containment spray initiation setpoint allowable value of 8. 715 psig. The containment pressure - high allowable value cited in Technical Specification 3.3.6.2, "RHR Containment Spray System Instrumentation,"
Table 3.3.6.2-1 , is::; 8.71 psig, and is conservative to the calculated value.
Attachment L-16-298 Page 2 of 6 The setpoint methodology also determines a nominal trip setpoint and a nominal trip setpoint for licensee event report (LER) avoidance by determining a standard deviation term associated with a 90 percent probability. Although the setpoint calculation provides for a nominal trip setpoint of 8.711 psig, the current plant setpoint is conservatively set to 8 psig . As stated in the March 15, 2016 letter, Section 3.7 of the Enclosure, the GOTHIC analysis initiated containment spray at 9 psig consistent with USAR Section 6.2.1.1.5.4.
In accordance with the General Electric design of the PNPP, under post-accident conditions, containment spray shall be operating at full spray flow within three minutes after containment spray initiation. Furthermore, ten minutes after a high drywell pressure signal, the containment spray will auto start in the presence of high containment pressure.
The General Electric design is reflected in PNPP USAR Section 6.2.1.1.5.4 and lists one of the assumptions for the allowable bypass calculations as, "Containment (spray) is activated 180 seconds after containment pressure reaches 9 psig or at LOCA plus 13 minutes, whichever occurs later."
As shown in the March 15, 2016 letter, Attachment 4, Figures 8 and 13 of the Enclosure, the GOTHIC analysis showed that containment spray initiated at approximately 780 seconds, which is ten minutes of high drywell pressure plus three minutes to achieve full containment spray flow.
Thus, the GOTHIC analysis for the proposed amendment does not alter the current containment spray initiation setpoint or timing as described in the PNPP USAR.
- 2. GDC 50 requires that the reactor containment structure, including access openings, penetrations, and the containment heat removal system shall be designed so that the containment structure and its internal compartments can accommodate, without exceeding the design leakage rate and with sufficient margin, the calculated pressure and temperature conditions resulting from any loss-of-coolant accident. Describe the conservatisms used in the assumptions and the benchmarking performed for the GOTHIC model for the steam line break with steam bypass of the suppression pool transient as referenced in the LAR.
Response
The current licensing-basis steam bypass analysis for the PNPP is described in USAR Section 6.2.1.1.5, "Steam Bypass of the Suppression Pool;" USAR Table 6.2-3, "Engineered Safety Feature Systems Performance Parameters for Containment
Attachment L-16-298 Page 3of6 Response Analyses;" USAR Table 6.2-10, "Available Containment Heat Sinks;" and USAR Figure 6.2-25, "Containment Pressure Following a Small Break with Steam Bypass (With Containment Spray and Heat Sinks & a minimum Mark Ill Design of A/...JK = 1.0 ft2 )."
USAR Section 6.2.1.1.5 .2, "Criteria," states, "The allowable bypass leakage is defined as the amount of steam which could bypass the suppression pool without exceeding the design containment pressure."
Thus, the current licensing basis steam bypass analysis determined the allowable drywell leakage capability such that the containment design pressure of 15 psig will not be exceeded. USAR Section 6.2.1.1.5.4 lists assumptions for the licensing basis steam bypass analysis. USAR Figure 6.2-25 provides the containment pressure response of a typical Mark Ill containment to a small steam break in the drywell and a
=
steam bypass area A/...JK 1.0 square foot (ft2).
To support the license amendment request for early drain down in MODE 3, the GOTHIC model was first used to simulate a small MODE 1 reactor pressure boundary steam break in the drywell with an assumed bypass of the suppression pool equal to the PNPP design bypass capacity of Al...JK = 1.68 ft 2 . This analysis was performed to validate that the GOTHIC model can predict the peak containment pressure at the maximum allowable bypass leakage of A/...JK = 1.68 ft2 . Several MODE 1 benchmark runs were made, each varying the steam break size from 0.07 ft2 to a maximum break size of 3.50 ft2 .
The GOTHIC model for LOCA with steam bypass included several assumptions that are similar to the licensing-basis methodology described in the PNPP USAR. These assumptions follow:
- The GOTHIC model uses the same heat sinks as used in the General Electric model (surface areas and volumes as shown in USAR Table 6.2-10). Material properties assumed are typical of concrete and carbon steel. The Uchida correlation for convective heat transfer is also used. The analysis assumes a single failure of one loop of containment spray. Only one containment spray loop is used at the design basis flow rate of 5250 gallons per minute (gpm).
Containment spray flow is cooled by the residual heat removal (RHR) heat exchanger using an assumed maximum service water temperature of 85°Fahrenheit (°F) and an assumed heat exchanger performance value of 440 british thermal units (BTUs) per second per °F.
Attachment L-16-298 Page 4 of 6
- Containment spray initiates no earlier than 13 minutes after a LOCA signal or 180 seconds after containment pressure exceeds 9 psig, whichever occurs later.
Several of the assumptions used in the GOTHIC model may be different than those used in the original licensing basis analysis. For example, stratification in the drywell is accomplished by subdividing the drywell into two vertical cells. The steam break is placed in the upper cell, so steam from the break will push air downward and out of the cell. Steam in this upper cell will then be at a higher temperature than in the lower cell.
The bypass to the containment airspace is also placed in this upper cell. This results in bypass flow quickly becoming a higher temperature steam, which will conservatively pressurize the containment faster.
The GOTHIC model for LOCA with steam bypass also included several additional conservative assumptions that follow:
- The suppression pool level is at the technical specification maximum level. The additional static head results in a higher differential pressure between the drywell and containment, causing more steam to leave the drywell through the leakage path, which results in a higher containment pressure.
- Break steam flow is computed by GOTHIC using a TABLES setting for the critical flow model. Since the break flow is predominantly dry saturated steam, the TABLES setting in GOTHIC will use a combination of the Moody model and an isentropic ideal gas model to compute the critical flow limit for break flow.
The steam bypass flow path also uses a TABLES setting for the critical flow model. A plot of the steam bypass flows confirms no liquid or drop flow through the bypass flow path. Both paths conservatively inhibit the cooling effect of drops in the drywell and in containment.
- The GOTHIC model includes steam heating of the suppression pool as steam is directed to the suppression pool via both the vents and directly via the safety/relief valves (S/RVs) . The heating of the suppression pool results in a higher water temperature at the inlet of the RHR heat exchanger, thus a higher temperature containment spray.
- The GOTHIC model includes heat from the operating containment spray pump, which results in a slightly higher temperature spray.
Attachment L-16-298 Page 5 of 6
- The GOTHIC model includes modeling the reactor pressure vessel (RPV) with decay heat from the fuel and metal heat sinks. As the reactor steams, the liquid level in the reactor decreases. Level in the reactor is normally recovered using the high pressure core spray (HPCS) system drawing suction from the suppression pool. However, the GOTHIC model also includes the large volume of hot liquid captured in the feedwater piping, and the GOTHIC model prefers makeup using the feedwater liquid rather than HPCS system liquid until the feedwater volume is exhausted. This results in maximizing the heat, and thus, the steam source of the RPV.
- The GOTHIC model includes isolation of the RPV soon after the event initiates without any immediate pressure reduction . This causes reactor pressure to increase and, for small breaks, the opening of the S/RVs at their setpoints.
When RPV makeup occurs, reactor pressure decreases slightly, and when makeup stops at the RPV high level (Level 8), operators wait until reactor pressure again increases to match the depressurization profile as they continue manually depressurizing the vessel.
- The GOTHIC model includes the effect of the suppression pool makeup system upper pool dump, which also increases the suppression pool level, adding back pressure on the drywell vents, increasing the differential pressure between drywell and containment, and increasing steam bypass flow.
The GOTHIC benchmark runs produce the same conclusion as the licensing basis analysis, that the PNPP containment design can withstand a postulated LOCA of any size with a steam bypass as large as A/...JK = 1.68 ft 2 and still maintain containment pressure below the design pressure of 15.0 psig. The benchmark run that resulted in the highest containment pressure was for a 0.50 ft2 break.
For the benchmark steam bypass GOTHIC run with the limiting 0.50 ft 2 break size, the GOTHIC results are similar to USAR Figure 6.2-25, noting the two distinct peaks in containment pressure. The first peak occurs at about 780 seconds (13 minutes) when containment spray initiates. Containment pressure increases due to the bypass leakage, but when containment spray initiates, containment pressure is reduced.
However, as spray continues, the spray becomes less effective and containment pressure again begins to increase. The second peak occurs more gradually as operators reduce reactor pressure below drywell pressure and the steam break flow decreases to a low value. Continued containment spray reduces the containment pressure and, as a result, the drywall pressure, and the event is over.
Thus, the GOTHIC model for LOCA with steam bypass is an acceptable model for re-creating the current licensing basis analysis. The GOTHIC model also has the capability to analyze the same event, but with conditions assumed for the early drain down in MODE 3.
Attachment L-16-298 Page 6 of 6 The GOTHIC model for LOCA with steam bypass was then used for the steam bypass with early drain down in MODE 3 scenario. Conditions for the scenario include the reactor is shut down for two hours, in MODE 3, and steam dome pressure is no greater than 250 psia. The GOTHIC model for analysis at drain down conditions includes similar assumptions as before, with the following changes:
- Suppression pool level is assumed to be near the top of the weir wall with no initial differential pressure between drywell and containment. The pool level is intentionally higher than the analytical maximum level prior to early drain down to provide additional conservatism.
- RPV water level makeup is from feedwater liquid rather than HPCS liquid. A conservative feedwater enthalpy is assumed such that feedwater is initially injected at 350 BTUs per pound mass and reduces over time.
- Upper pool dump is included, but the volume available is assumed to be no greater than 6200 cubic feet.
Review of the containment response for the steam bypass with early drain down in MODE 3 analysis reveals that both pressure peaks remain below the containment design pressure with RPV pressure no greater than 250 psia. This confirms the requirement that the reactor pressure for early drain down in MODE 3 must be no greater than 250 psia.