NRC 2016-0048, Response to Request for Additional Information Regarding LAR 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program

From kanterella
(Redirected from ML16309A329)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding LAR 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program
ML16309A329
Person / Time
Site: Point Beach  
Issue date: 11/04/2016
From: Coffey R
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR 280, NRC 2016-0048
Download: ML16309A329 (4)


Text

November 4, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant Units 1 and 2 Docket Nos. 50-266 and 50-301 NEXT era ENERGY~

~

NRC 2016-0048 10 CFR 50.90 Renewed Facility Operating Licenses Nos. DPR-24 and DPR-27 Response to Request for Additional Information - Point Beach Nuclear Plant. Units 1 & 2-LAR 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program

References:

(1) NRC Electronic Mail to NextEra Energy Point Beach, LLC, dated October 4, 2016, "Request for Additional Information - Point Beach Nuclear Plant, Units 1 & 2-License Amendment Request - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program" MF7352/53 (2) NextEra Energy Point Beach, LLC letter to NRC, dated February 12, 2016, "License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program" (ML16043A217)

The NRC staff determined in Reference (1) that additional information was required to complete its review of the License Amendment Request submitted in Reference (2). The NextEra Energy Point Beach, LLC, (NextEra) response to the request for additional information is documented in the Enclosure.

In accordance with 10 CFR 50.91, a copy of this letter is being forwarded to the State of Wisconsin designee.

This letter contains no new Regulatory Commitments or revisions to existing Regulatory Commitments.

Should you have questions or require additional information, please contact Mr. Bryan Woyak, Licensing Manager, at (920) 755 7599.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on November 4, 2016.

Sincerely, NextEra Energy Point Beach, LLC

~~

Site Vice Preside~

Enclosure cc:

Regional Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 280- REMOVAL OF COMPLETED LICENSE CONDITIONSAND CHANGE TO THE VENTILATION FILTER TESTING PROGRAM" (TAC NO - MF7352/53)

In LAR Section 3. 1 entitled "Change to Operating Licenses," the licensee requests the following license conditions to be removed:

1) Amendment 240/Amendment 244, Emergency Diesel Generator Loading License condition states:

NextEra Energy Point Beach, LLC shall perform Train B Emergency Diesel Generator load testing over a range of 2877 to 2950 kW at rated power factor. This license condition will remain in effect until implementation of LAR 261 for Unit 2.

Amendment 238/Amendment 242, Modifications to Reduce Emergency Diesel Generator Loading License condition states:

NextEra Energy Point Beach, LLC shall implement modifications to reduce emergency diesel generator (EDG) loading such that the maximum loading will not exceed the 2000-hour rating of the EDGs.

Please confirm and provide a summary of the calculations and modifications performed to conclude that the EDG maximum loading is now within the 2000-hour rating of the EDGs. Also, confirm that EDG maximum loading considers loads added from the alternate source term (AST) modifications documented in letter dated April14, 2011 (ADAMS Accession Number ML110240054), and the new auxiliary feedwater (AFW) pump motor modifications, and the AST control room (CR) modifications to automatically start the CR emergency fans.

Response to RAI 1 The current calculation for the Emergency Diesel Generator (EDG) Steady State Loading Analysis considers the additional electrical loads associated with the Auxiliary Feedwater (AFW) pump/motor modifications; and, the Alternate Source Term (AST) modifications, including the Control Room emergency fans. The modifications included the removal of non-essential loads from the EDG automatic load sequence to ensure that each EDG remains within its 2000-hr rating. The calculation envelopes the Injection Phase, the Recirculation Phase, and a Main Steam Line Break. The calculation assumes that only one EDG is available to support both units; and demonstrates that the electrical load for each EDG is within its 2000-hour rating.

Results from the EDG Steady State Loading Analysis are shown in Tables 1, 2, and 3.

Page 1 of2

Table 1: Potential Electrical Loads in EDG Steady State Loading Analysis Table 1: EDG Load (kW) - Injection Phase EDG G-01 G-02 G-03 G-04 2000 hr Rating 2850.0 2850.0 2848.0 2848.0 Load 2720.0 2720.0 2814.1 2815.1 Margin - 2000 hr 130.0 130.0 33.9 32.9 Table 2: EDG Load (kW) - Recirculation Phase EDG G-01 G-02 G-03 G-04 2000 hr Rating 2850.0 2850.0 2848.0 2848.0 Load 2241.0 2241.0 2335.1 2336.1 Margin - 2000 hr 609.0 609.0 512.9 511.9 Table 3: EDG Load (kW) - Main Steam Line Break EDG G-01 G-02 G-03 G-04 2000 hr Rating 2850.0 2850.0 2848.0 2848.0 Load 2811.0 2811.0 2790.1 2791.1 Margin - 2000 hr 39.0 39.0 57.9 56.9

2) Amendment 240 I Amendment 244, Mitigating Filtration Unit Motors License condition states:

NextEra Energy Point Beach, LLC shall procure mitigating filtration unit motors equivalent to W-14AIB (equivalent HP, efficiency, power factor, and voltage requirements).

Please provide a comparison of the mitigating filtration unit motors that are procured and installed at PBNP Units 1 and 2 with W-14AIB motors to conclude that the electrical power requirements for these motors are the same (HP, efficiency, power factor, and voltage requirements) and they did not increase loading on the EDGs.

Response to RAI 2 Below is a comparison of the Control Room Filter Fan Motors (W-14A/B-M) and the Mitigating Filtration Unit Motor (W-275-M). Horsepower, efficiency, power factor, and voltage requirements are identical between the motors.

Motor Comparison: W-14AIB-M and W-275-M Motor Data W-14AIB-M W-275-M Horsepower 7.5 Hp 7.5 Hp Efficiency 87.5%

87.5%

Power Factor 90.5%

90.5%

Voltage 460 VAC 460 VAC Page 2 of2