|
---|
Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:Technical Specifications
MONTHYEARML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23243B0572023-12-19019 December 2023 VEGP Unit 4 Amendment Attachment ML23243A9802023-12-19019 December 2023 VEGP Unit 3 Amendment Attachment ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23093A0282023-08-0101 August 2023 Issuance of Amendments Nos. 220 and 203, Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23159A0992023-07-31031 July 2023 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment No. 192 (LAR 23-001) ML23158A2092023-07-19019 July 2023 LAR-23-005 U/4 Amd 189 Timing of TS Effectiveness Prior to Initial Criticality Amendment Attachment NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23115A1492023-06-15015 June 2023 Issuance of Amendments No. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) ML23072A2752023-05-0101 May 2023 Attachment to Enclosure 1 - VEGP U3 Amendment 191 LAR-22-005 ML23037A0902023-02-0808 February 2023 Amend Attachment - Vogtle 3 Amend No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML23037A9212023-02-0606 February 2023 SNC Presentation - Draft Vogtle TSTF-339 LAR - Pre-Submittal Meeting - February 13 2023 ML23013A2192023-01-13013 January 2023 Amendment No. 189 - Amendment Attachment ND-22-0219, Technical Specifications Setpoint Report2022-08-11011 August 2022 Technical Specifications Setpoint Report ML22116A0842022-07-0505 July 2022 Issuance of Amendment Nos. 215 and 198, Regarding Revision to Technical Specification 3.7.2, Main Steam Isolation Valves (Msivs) ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20247J4632020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 183 (LAR-20-004) ML20247J4602020-10-14014 October 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 185 (LAR-20-004) ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)2020-06-19019 June 2020 Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005) ML20013G7122020-02-0303 February 2020 Amendment 173 (LAR-19-016) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19298A1042019-10-25025 October 2019 Attachment - VEGP U4 Amendment XX5 (LAR-19-001) NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...2019-10-0707 October 2019 Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ... ML19238A3482019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR-19-004) ML19238A3492019-09-27027 September 2019 Attachment - Vogtle Electric Generating Plant Unit 4 (LAR-19-004) ML19063C6402019-04-11011 April 2019 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 158 (LAR-18-027) ML19063C6412019-04-11011 April 2019 Attachment - VEGP U4 Amendment 156 (LAR-18-027) ML19038A4572019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 4 (LAR 18-025) ML19038A4552019-02-25025 February 2019 Attachment - Vogtle Electric Generating Plant, Units 3 (LAR 18-025) ML19035A7602019-02-22022 February 2019 Attachment for Amendment 153 - LAR-18-024 ML19035A7582019-02-22022 February 2019 Attachment for Amendment 154 - LAR-18-024 ML18351A1942019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 4 LAR 18-017 ML18351A1922019-01-15015 January 2019 Attachment - Vogtle Electric Generating Plant Unit 3 LAR 18-017 ML18341A0832018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant - Unit 3 Amendment 149(LAR-18-022) ML18341A0852018-12-18018 December 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 148 (LAR-18-022) ML18296A4182018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 4 ML18296A4172018-11-13013 November 2018 Attachment - Vogtle Electric Generating Plant Unit 3 ML18263A0392018-10-29029 October 2018 Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295) ML18180A0622018-08-10010 August 2018 Issuance of Amendment Nos. 196 and 179 Regarding Application of the Seismic Probabilistic Risk Assessment Into the Previously Approved 10 CFR.50.69. Categorization Process ML18173A3062018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 134 (LAR-18-003) ML18173A3042018-07-26026 July 2018 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 135 (LAR-18-003) ML18082B3772018-07-19019 July 2018 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 134(LAR-18-005) ML18082B3792018-07-19019 July 2018 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 133(LAR-18-005) ML18156A1482018-07-10010 July 2018 Attachment - Vogtle Electric Generating Plant Unit 4 (LAR 17-044) 2023-08-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2016 Mr. Charles R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNIT 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE FOR AMENDMENT NO. 164 RE: ISSUANCE OF AMENDMENT FOR 2B NUCLEAR SERVICE COOLING WATER TRANSFER PUMP (CAC NO. MF8274)
Dear Mr. Pierce:
By letter dated October 31, 2016 (Agencywide Documents Access and Management System Accession No. ML16265A162), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 164 to Renewed Facility Operating License No. NPF-81 for the Vogtle Electric Generating Plant, Unit 2. Revised Technical Specification (TS) page 3.7.9-2 contained a typographical error. Specifically, the error consisted of the omission of "Amendment No. 179 (Unit 1)" at the bottom right of the page. Also, a change bar should have appeared after "Amendment No. 164 (Unit 2)" at the bottom right of the page.
This was an administrative error on the part of the NRC. The correction does not change any of the NRC staff's conclusions in the safety evaluation associated with the license amendment or the no significant hazards consideration determination as published in the Federal Register.
A corrected TS page 3.7.9-2 is enclosed. We apologize if this error has caused any inconvenience.
Sincerely,
/~#fr)~
/Bob Martirf; Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-425
Enclosure:
Corrected TS page 3.7.9-2 cc w/enclosure: Distribution via Listserv
ENCLOSURE Corrected TS page 3.7.9-2 for Vogtle Electric Generating Plant, Unit 2 for Amendment No. 164 dated October 31, 2016
UHS 3.7.9 ACTIONS (continued}
CONDITION REQUIRED ACTION COMPLETION TIME D. One NSCW basin 0.1 Restore the transfer 8 days transfer pump pump to OPERABLE inoperable. status.
QB D.2.1 Implement an alternate 8 days method of basin transfer.
AND D.2.2 Restore the transfer --------NOTE-------
pump to OPERABLE A one-time only status. change of the Completion Time to 46 days is permitted for the 28 NSCW transfer pump refurbishment during Vogtle Unit 2, Cycle 19. The increased Completion Time is applicable only to the 28 NSCW transfer pump.
31 days E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR E.2 ---------NOTE-----------
LCO 3.0.4.a is not UHS inoperable for applicable when entering reasons other than MODE4.
Conditions A, B, C, or D. -------------------------
Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Vogtle Units 1 and 2 3.7.9-2 Amendment No. 179 (Unit 1)
Amendment No. 164 (Unit 2)
ML16308A225 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DORL/LPL2-1 /BC DORL/LPL2-1 /PM NAME BMartin LRonewicz MMarkley BMartin DATE 11/03/16 11/03/16 11/03/16 11/03/16