Correction to Technical Specification Page 3.7.9-2 for Amendment No. 164 Issuance of Amendment for 2B Nuclear Service Cooling Water Transfer Pump
ML16308A225
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/03/2016
From: Martin R
Plant Licensing Branch II
To: Pierce C
Southern Nuclear Operating Co
Martin R, NRR/DORL/LPL2-1, 415-1493
References
CAC MF8274
Download: ML16308A225 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2016 Mr. Charles R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNIT 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE FOR AMENDMENT NO. 164 RE: ISSUANCE OF AMENDMENT FOR 2B NUCLEAR SERVICE COOLING WATER TRANSFER PUMP (CAC NO. MF8274)

Dear Mr. Pierce:

By letter dated October 31, 2016 (Agencywide Documents Access and Management System Accession No. ML16265A162), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 164 to Renewed Facility Operating License No. NPF-81 for the Vogtle Electric Generating Plant, Unit 2. Revised Technical Specification (TS) page 3.7.9-2 contained a typographical error. Specifically, the error consisted of the omission of "Amendment No. 179 (Unit 1)" at the bottom right of the page. Also, a change bar should have appeared after "Amendment No. 164 (Unit 2)" at the bottom right of the page.

This was an administrative error on the part of the NRC. The correction does not change any of the NRC staff's conclusions in the safety evaluation associated with the license amendment or the no significant hazards consideration determination as published in the Federal Register.

A corrected TS page 3.7.9-2 is enclosed. We apologize if this error has caused any inconvenience.

Sincerely,

/~#fr)~

/Bob Martirf; Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-425

Enclosure:

Corrected TS page 3.7.9-2 cc w/enclosure: Distribution via Listserv

ENCLOSURE Corrected TS page 3.7.9-2 for Vogtle Electric Generating Plant, Unit 2 for Amendment No. 164 dated October 31, 2016

UHS 3.7.9 ACTIONS (continued}

CONDITION REQUIRED ACTION COMPLETION TIME D. One NSCW basin 0.1 Restore the transfer 8 days transfer pump pump to OPERABLE inoperable. status.

QB D.2.1 Implement an alternate 8 days method of basin transfer.

AND D.2.2 Restore the transfer --------NOTE-------

pump to OPERABLE A one-time only status. change of the Completion Time to 46 days is permitted for the 28 NSCW transfer pump refurbishment during Vogtle Unit 2, Cycle 19. The increased Completion Time is applicable only to the 28 NSCW transfer pump.

31 days E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR E.2 ---------NOTE-----------

LCO 3.0.4.a is not UHS inoperable for applicable when entering reasons other than MODE4.

Conditions A, B, C, or D. -------------------------

Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Vogtle Units 1 and 2 3.7.9-2 Amendment No. 179 (Unit 1)

Amendment No. 164 (Unit 2)

ML16308A225 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DORL/LPL2-1 /BC DORL/LPL2-1 /PM NAME BMartin LRonewicz MMarkley BMartin DATE 11/03/16 11/03/16 11/03/16 11/03/16