ML16298A347

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 14
ML16298A347
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/21/2016
From: Pat Navin
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML16298A347 (6)


Text

l*

Altil SAFEGUARDS INFORMATION

Exelon Generation© October 21, 2016 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001

.Peach Bottom Atomic Power Station, Units 1, 2 and 3 Facility Operating License Nos. DPR-12, DPR-44 and DPR 56 NRC Docket Nos. 50-171. 50-277. 50-278 and72-29

Subject:

Peach Bottom Atomic Power Station Security Plan, T~aining.~:md' Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 14 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision. 14 to the Peach Bottom Atomic Power Station (PBAPS) Security Plan, Training and Ql,Jalification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (Security Plan). The changes to the PBAPS Security Plan were implemented on September 22, 2016. In accordance with 10 CFR 50.54(p )(2), EGG is submitting this change within 60 days of implementation (I.e., no later than Novem.ber 20, 2016)'.

  • The PBAPS Security Plan,* Training and Qualification Plan, and Safeguards Contingency Plan, and. Independent Spent Fuel Storage Installation Security Program have been revised to address the discontinuance of Handguns:
1. In section 9 of the PSP (refer to Attachment 2)
2. In section 3.6.3 of the PSP (refer to Attachment 2)
3. In section 3.6.4 of the PSP (refer to Attachment 2)
4. Table 1, Critical Task #25 of TQP (refer to Attachment 2)

EGC has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program.

I SAFEGUARDS INFORMATION

$oDI tJtv/5~0/

Ntv155Z(p ATTACHMENT 1, ATTACHMENT 2 and ATTACHMENT 3 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

U.S. Nuclear Regulatory Commission October::2.1~,-_:20.'.16':::::::_:.::: _____ ::.=-_::"::::::_::::::_:_::_:.:_:.::.::::*'::'.=:.=:_::::-..::_'-:=.-.::*:=cc::':=-_-_:~--=.::::::-_::_:':-:.::::*:.:_._ __ ::'::-

-:_::_c" ----:'- -:::::::::=-:'---~-=~:::..--.-::: _

Page 2*, Attachment 2 and Attachment 3 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(1 )(i), and 10 CFR 73.21, "Requirements for the protection of safeguards information," paragraph (b)(1 )(i).

If you have any questions or require additional information, please contact Shelly Griffith at 717-456"'.3025.

Reffif()

Patrick D. Navin Plant Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC -

Attachments: 1. Peach Bottom Atomic Power Station Security Plan, Training and Qualification Ptah, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, -Revision 13 including Figures 1, 2, 3, and 4 {Contains Safeguards Information)

2.

SY-AA~101-1Q4.:.F-03, Table of Changes for Site Security Plan Change Submittals (Contains Safeguards Information)

3. Peach Bottom Atomic Power Station Supplemental Letter Supporting PSP Revision. 14 September?2, 2016-Handgun Elimination (Contains Safeguards Information)

, cc:

Regional Administrator - NRC Region I w/attachments CCN: 16-95 SAFEGUARDS INFORMATION ATTACHMENT 1, ATTACHMENT 2 and ATTACHMENT 3 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

y.. *:

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission October 21, 2016 Page3 bee:

Sr. Vice President, Mid-Atlantic Operations

. Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, PBAPS Plant Manager, PBAPS Director, Operations, PBAPS Director,.Security Manager, Site Security, PBAPS

. pirector, ~l,t,e,. Traini.69. PBAPS Manager, Regu.lat6ry Assurance, PBAPS Manager, Licensing - KSA3-E I

Commitment Coordinator - PBAPS iRecords Management - PBAPS

. SAFEGUARDS.INFORMATION w/o attachments II ATTACHMENT 1, ATTAC~MENT 2 and ATTACHMENT 3 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 (Includes Figures 1, 2, 3, and 4)

. SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED.

J..

SAFEGUARDS INFORMATION ATTACHMENT 2 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change Submittals c

SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 3 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Supplemental Letter Supporting

  • PSP Revision 14 September 22, 2016-Handgun Elimination

- SAFEGUARDS INFORMATION ATTACHMENT 3 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED