ML16294A566

From kanterella
Jump to navigation Jump to search
Lr Hearing - (External_Sender) Daily Digest for U.S. NRC Blog, on October 1, 2016
ML16294A566
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/01/2016
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML16294A566 (3)


Text

1 IPRenewal NPEmails From:

U.S. NRC Blog <donotreply@wordpress.com>

Sent:

Saturday, October 01, 2016 2:25 AM To:

Newman, Garrett

Subject:

[External_Sender] Daily digest for U.S. NRC Blog, on October 1, 2016 Moderator posted: "Neil Sheehan Public Affairs Officer Region I There have been some new developments since our last blog post, on June 1, regarding degraded reactor vessel bolts identified at a pair of nuclear power plants in the Northeast. Most notably, both the Indi" New post on U.S. NRC Blog Baffle Bolts: An Update by Moderator Neil Sheehan Public Affairs Officer Region I There have been some new developments since our last blog post, on June 1, regarding degraded reactor vessel bolts identified at a pair of nuclear power plants in the Northeast. Most notably, both the Indian Point 2 plant, in New York, and the Salem 1 plant, in New Jersey, returned to service over the summer.

Indian Point 2 came back online in late June after 278 of the plants 832 baffle-former bolts were replaced. As for Salem 1, it was restarted on July 30th after changing out 189 of its 832 baffle-former bolts.

In both cases, prior to the restarts, the NRC conducted independent evaluations of analyses done for the plants respective owners by the reactor vendors looking at how many new, more robust bolts had to be installed to maintain safety margins and ensure the structural integrity of the baffle-former plates. The agency also had specialist inspectors at the plants for first-hand observations and information-gathering on bolt-removal and -replacement activities.

Based on those reviews, the NRC concluded that the reactors were safe to operate. The bolts will be subject to further inspections at the reactors next refueling outages, which typically occur about once every 18 to 24 months.

Nevertheless, the NRC identified a green (very low safety significance) non-cited violation at Indian Point 3 related to the bolts issue in an inspection report issued on Aug. 30th. A similar non-cited violation has also been identified at the Salem nuclear power plant, as documented in an NRC inspection report issued on Sept. 22.

In both cases, the plant owners had not completed a necessary process to document its conclusion, following identification of degraded bolts on one unit, that the second unit was safe to continue to operate. After the NRC raised concerns regarding the deficiencies, the companies undertook corrective actions, including completing and documenting the evaluations.

Looking ahead, there is still more work to be done. Bolts from both reactors have been or will be sent to labs for metallurgical analysis. Also, the NRC will continue to engage the nuclear industry on its plans for addressing the issue The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.

2 An NRC web page has been updated to reflect the latest available information on this topic, including the NRC slides from a related July meeting and a summary of the session.

Moderator l September 30, 2016 at 11:48 am l Tags: baffle bolts, Indian Point nuclear power plant, inspection report, NRC, Salem nuclear power plant l Categories: Operating Reactors l URL: http://wp.me/p1fSSY-1X7 Comment See all comments Unsubscribe to no longer receive posts from U.S. NRC Blog.

Change your email settings at Manage Subscriptions.

Trouble clicking? Copy and paste this URL into your browser:

http://public-blog.nrc-gateway.gov/2016/09/30/baffle-bolts-an-update/

Thanks for flying with WordPress.com The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.

Hearing Identifier:

IndianPointUnits2and3NonPublic_EX Email Number:

8392 Mail Envelope Properties (8e37a1dba0f5d0ed1915683162e9a6d8)

Subject:

[External_Sender] Daily digest for U.S. NRC Blog, on October 1, 2016 Sent Date:

10/1/2016 2:24:54 AM Received Date:

10/1/2016 2:26:34 AM From:

U.S. NRC Blog Created By:

donotreply@wordpress.com Recipients:

"Newman, Garrett" <Garrett.Newman@nrc.gov>

Tracking Status: None Post Office:

wordpress.com Files Size Date & Time MESSAGE 4981 10/1/2016 2:26:34 AM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: