ML16294A545

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000424/2017301, 05000425/2017301
ML16294A545
Person / Time
Site: Vogtle  
Issue date: 10/20/2016
From: Eugene Guthrie
Division of Reactor Safety II
To: Taber B
Southern Nuclear Operating Co
References
Download: ML16294A545 (4)


See also: IR 05000424/2017301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

October 20, 2016

Mr. B. Keith Taber

Vice President Nuclear Plant Site

Southern Nuclear Operating Co., Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2017301, 05000425/2017301

Dear Mr. Taber:

During a telephone conversation on October 17, 2016, between Mr. Ken Jenkins, Instructor/

Regulatory Examination Lead Author, and Richard S. Baldwin, Senior Operations Engineer,

arrangements were made for the administration of licensing examinations at Vogtle Electric

Generating Plant. The on-site preparatory week is scheduled for the week of March 20, 2017.

The operating test is scheduled to be administered during the weeks of May 1, May 8, and

May 15, 2017. The written examination is scheduled to be administered the week of May 22,

2017.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by October 20, 2016. Ms. Toth, Operations Engineer, provided the written examination

outline to your staff in June of 2016. The operating test, written examination, and the supporting

reference materials identified in Attachment 3 to ES-201 will be due by January 13, 2017.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR

55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline,

examination, and test before they are submitted to the NRC for review and approval. All

materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

K. Taber

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the preliminary applications are not received at least 30 days before the

examination date, a postponement may be necessary. Signed applications certifying that all

training has been completed should be submitted at least 14 days before the first examination

date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on June 30,

2019. The public reporting burden for this collection of information is estimated to average 2500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm/adams.html.

K. Taber

3

Thank you for your cooperation in this matter. Mr. Jenkins has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Richard Baldwin, Senior Operations Engineer/

Chief Examiner at (404) 997- 4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at

(404) 997- 4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos: 50-424, 50-425

License Nos: NPF-68, NPF-81

cc: Distribution via ListServ

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RSB2 VIA EMAIL

NAME

BALDWIN

GUTHRIE

DATE

10/20/2016

10/ /2016

E-MAIL COPY?

YES

NO

YES

NO YES

N

YES

NO YES

NO

YES

NO

YES

NO