MONTHYEARIR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators 2024-09-24
[Table view] |
Text
Exelon Generation October 14, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRG Docket No. 50-244
Subject:
Follow-up to Interim Report Submitted under 10 CFR 21.21 (a)(2)
I
Reference:
W. Carsky, REGNPP, to NRG Document Control Desk, "Interim 10 CFR Part 21 Report Regarding Internal Pump Tolerances between the Impeller Hub and a Wear Ring", August 15, 2016 (ADAMS Accession Number ML16229A445)
This letter serves as the follow-up report to the referenced interim report (ML16229A445) which was submitted pursuant to 10 CFR 21.21 (a)(2).
The vendor has completed the attached evaluation associated with a Flowserve pump model 6L-SVC back pull out assembly (p/n 11952230) that was supplied to the RE Ginna Nuclear Power Plant (REGNPP). The Flowserve determination is that this condition was an isolated event, and is considered a deviation and not to be classified as a reportable defect as defined in 10 CFR 21.
If you have any questions or need any other clarifying information, please contact me at (315) 791-5219.
~1~
Regulatory Assurance Manager
Attachment:
Flowserve Formal Evaluation of Deviation for Impact to Safety cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna
NPO-NNF-07 Rev.00
~ NUCLEAR PRODUCTS Page: 1OF2 FLOWSERVE OPERATIONS Date: 23 Nov 2011
~
FORMAL EVALUATION OF DEVIATION FOR IMPACT TO SAFETY
- 1. COMPONENT: Impeller I 2. CUSTOMER PO: 00529568
- 3. REPORTED DEVIATION Impeller ring has loose fit to impeller hub
- 4. COMPONENT CURRENT STATUS: The impeller was lost during return to Charlotte - not recovered
- 5. SITE LOCATION: 6. DATE OF DISCOVERY: 7. DATE OF NOTIFICATION OF DISCOVERY:
Constellation - GINNA 7/11/2016 8/11/2016 Nuclear Plant
- 8. METHOD OF NOTIFICATION: Customer Complaint- Email - Customer requesting OE evaluation I guidance (8-15-16)
- 9. CUSTOMER CONDITION REPORT NUMBER: Click here to enter text.
- 10. CUSTOMER REQUEST FOR EVALUATION: YES X -NO DATE OF FORMAL EVALUATION : 9/28/2016
- 11. INTERNAL WARRANTY/ NCR NUMBER: N/A
- 12. CORRECTIVE ACTION NUMBER: 309092
- 13. IS DATE OF THIS EVALUATION WITHIN 60 DAYS OF (Customer) DISCOVERY? ¥fiS NO x If response is NO - complete 14, 15, 16 below/ If response is YES - Enter N/A at 14, 15, 16
- 14. IS EXTENSION APPROVAL REQUl~ED BY N_RC TO COMPLETE FORMAL EVALUATION AND REPORT? YES X
- 15. REQUEST FOR EXTENSION BY: DATE: 8/15/2016 GINNA Nuclear Plant I Mr. Thomas Harding
- 16. CONFIRMATION OF EXTENSION RECEIVED FROM: N/A DATE: N/A
- 17. ENTER FORMAL EVALUATION REPORT- EVALUATION PURPOSE: DETERMINE DEVIATION POTENTIAL IMPACT TO SAFETY (COMPONENT/SYSTEM/ENVIRONMENT; (CONCLUDE: "DEVIATION" OR "DEFECT" AS DEFINED IN 10CFR21)
History: Replacement of RHR Back Pull-Out unit- Purchase Order identified to leave Impeller Ring OD oversize (confirmed)
Source of Discovery: Customer Notification Method of Discovery: Email - Customer installation prohibited by oversize impeller ring (as delivered)
Process of OEM intervention: In response to customer- FLS Field Service was sent on-site Customer Reported Results : Impeller ring lacked interference fit to impeller hub Evaluation Process: Analysis performed to determine pressure acting on the impeller wear ring and the resulting load on the set screws Flowserve Action: Conduct analysis to determine suitability of set screws to maintain radial and axial ring stability under maximum I shut-off design operational loads I Results of Flowserve Action: Analysis concluded that the suction-side impeller wear ring, devoid of the interference fit, would remain intact and operational with no movement (adverse) in either the radial or axial planes during operation. The assumptions used in the calculations were extremely conservative aimed to create worst case operational scenarios. It was determined that the set screws, (3 - X-20 x 3/8) would prohibit the ring from becoming dislodged and causing contact with the mating casing wear ring, thus avoiding a possibility of creating a significant safety hazard.
Flowserve determination of Extent: The root cause of this condition has been reviewed in depth through document reviews and personnel interviews. In summary, the root cause identified an anomaly whereas this impeller (post balance status) became 'stuck' on the balancing arbor during removal and required 'excessive heat' to assist in its removal. This first-time event resulted in heat input throughout the impeller inlet surfaces (including those areas that are not typically subject to the same) to free the impeller from the arbor. It is believed that this led to the base material beneath the (previously) installed impeller ring to be "pulled-in" or "contracted", resulting in a reduction of the dimensional interference which had been inspected and recorded prior to ring installation and balance. Accordingly, FLS reports this condition as an isolated event based on the anomaly described and the lack of historical relevant customer feedback I complaints.
Flowserve continued communication with Customer: This OEM evaluation was conducted at the request of Mr Thomas Harding, GINNA. This report will be provided to Mr. Harding on 29 September 2016.
NPO-NNF-07 Rev.00
~ NUCLEAR PRODUCTS Page: 2 OF 2 FLOWSERVE OPERATIONS Date: 23 Nov 2011
~
==
Conclusion:==
The reported condition has been determined to be a deviation and not to be classified as a reportable defect as defined in 10CFR21. This determination has been concluded through a Formal Quality and Engineering Evaluation which included design and operational analysis provided by FLS Nuclear Analytical Engineering.
- 18. ENTER REPORT ATTACHMENT
REFERENCES:
None from OEM to Enter
- 19. FORMAL EVALUATION RESULTS COMPLETE: YESX NO
- 20. RESULTS/COMMENTS OTHER - EXPLAIN Condition &ia.,t did not REMAINS A Rl!PQR:i:0.8bl!
Check One:
present a significant safety DEVIATION X 1;m:i;;i;;:i: g hazard-
- 21. NOTIFICATION REQUIRED - If Yes Check I xI :i:QNRt;;Q OTHER-EXPLAI N Yes x Ne-Q One:
TO CUSTOMER
- 22. IF NOTIFICATION IS 23. BY WHOM: David P. Gobbi DATE: September 29, 2016 REQUIRED - Complete 23
- 24. ADDITIONAL ACTIONS REQUIRED: None EVALUATION REPORT BY:
£)MHL /J)ktl~
- 25. EVALUATION PARTICIPANTS - COMPLETED BY MRB CHAIR DGobbi, Mgr MEftychiou, Mgr Nuclear RUpadhyaya, Mgr Click here to NPO QA- Engineering Nuclear Analytical enter text.
Nuclear Engineering Program MRB ENG'R'G TECHNICAL EXPERT(S) Click here to enter EVALUATION DATE:
CHAIRClick REPRESENTATIVE(S):Click BBusse, Analytical Formal- 28 text.
Engineer September 2016 here to here to enter text.
enter text. REPORT DATE:
29 September 2016 CONTINUATION SHEET FOR ADDITIONAL INFORMATION -(not used this evaluation)