ML16294A113

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report for Unit 2 Cycle 25 and Unit 3 Cycle 24A
ML16294A113
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/18/2016
From: Karaba P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16294A120 List:
References
SVPLTR 16-0056
Download: ML16294A113 (1)


Text

"'!V Exelon Generation SVPL TR # 16-0056 October 18, 2016 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 2 and 3 Dresden Generating Station 6500 North Dresden Road Morris. IL 60450 www.exeloncorp.com Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket No. 50-237 and 50-249

Subject:

Core Operating Limits Report for Unit 2 Cycle 25 and Unit 3 Cycle 24A The purpose of this letter is to transmit the Core Operating Limits Report (COLR) for Dresden Nuclear Power Station (DNPS) Unit 2 operating cycle 25 {D2C25), Revision 1, and the Core Operating Limits R_eport (COLR) for Dresden Nuclear Power Station (DNPS) Unit 3 operating cycle 24A (D3C24A), Revision 1, in accordance with Technical Specifications Section 5.6.5, "CORE OPERATING LIMITS REPORT (COLA)."

There are no regulatory commitments contained in this submittal.

Should you have any questions concerning this letter, please contact Mr. Bruce Franzen at (815) 416-2800.

Respectfully, 1{()~-:!;

L-.~~

Peter J Karaba Site Vice President Dresden Nuclear Power Station Attachments:

Core Operating Limits Report for Dresden Unit 2 Cycle 25, Revision 1 Core Operating Limits Report for Dresden Unit 3 Cycle 24A, Revision 1 cc:

Regional Administrator-NRC Region Ill NRC Senior Resident Inspector - Dresden Nuclear Power Station