ML16281A349
| ML16281A349 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 10/03/2016 |
| From: | Shaw J Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NLS2016060 | |
| Download: ML16281A349 (2) | |
Text
H Nebraska Public Power District Always there when you need us NLS2016060 October 3, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46
Dear Sir or Madam:
50.54(q)
The purpose of this letter is to report a change to the following Emergency Plan Implementing Procedure (EPIP) and provide a summary of the associated 10 CFR 50.54(q) analysis for the changes to the EPIP:
EPIP 5.7.15 Revision 21 OSC Team Dispatch This letter contains no commitments.
If you have any questions regarding this submittal, please contact me at (402) 825-2788.
Sincerely,
/bk
Attachment:
Report of Change and Summary of 50.54( q) Analysis - Emergency Plan Implementing Procedure 5.7.15, Revision 21
Enclosure:
Emergency Plan Implementing Procedure 5.7.15, Revision 21 COOPER NUCLEAR STATION P.O. Box 98 /Brownville, NE 68321-0098 Telephone: (402) 825-3811 /Fax: (402) 825-5211 www.nppd.com
NLS2016060 Page 2 of2 cc:
Regional Administrator, w/ attachment and enclosure (2)
USNRC - Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment (enclosure per controlled document distribution)
USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure