NRC Approval 2016 GNF PG_L33410
ML16273A548
Person / Time
Site: Vallecitos Nuclear Center, 07000754, 07001113, 07002872, 07200001, Vallecitos
Issue date: 10/05/2016
From: Ty Naquin
Fuel Manufacturing Branch
To: Murray S
Global Nuclear Fuel
Naquin T
Shared Package
ML16273A537 List:
References
CAC L33410
Download: ML16273A548 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 5, 2016 Mr. Scott P. Murray, Manager Licensing & Liabilities Global Nuclear Fuel-Americas 3901 Castle Hayne Road P.O. Box 780 - M/C K-84 Wilmington, NC 28401

SUBJECT:

GENERAL ELECTRIC COMPANY PARENT GUARANTEE OF FUNDS FOR DECOMMISSIONING, ANNUAL FINANCIAL TEST (COST ACTIVITY CODE L33410)

Dear Mr. Murray:

The U.S. Nuclear Regulatory Commission (NRC) reviewed your documents relating to financial assurance for the General Electric Company, submitted by letter dated March 18, 2016. This financial assurance documentation addresses decommissioning financial assurance for the Global Nuclear Fuel - Americas Fuel Manufacturing facility, the Reuter-Stokes facility, the Vallecitos Nuclear Center, and the Morris Operations facility.

The NRC staff reviewed the documents for conformance to NRCs regulations and NUREG-1757, Volume 3, Consolidated NMSS Decommissioning Guidance: Financial Assurance, Recordkeeping, and Timeliness. The documents submitted were found acceptable in accordance with NUREG-1757, Volume 3, Appendix A.8. The licensees comply with Appendix A, Criteria Relating to Use of Financial Tests and Parent-Company Guarantees for Providing Reasonable Assurance of Funds for Decommissioning of Title 10 of the Code of Federal Regulations (10 CFR), Part 30; therefore, the parent company guarantee is acceptable financial assurance for decommissioning. The enclosed Safety Evaluation documents the staffs finding. To continue utilizing the parent-company guarantee, General Electric must repeat passage of the financial test within 90 days after the close of each succeeding fiscal year as required by 10 CFR, Part 30, Appendix A, Section C.1.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Technical Assignment Control number L33410 is considered closed.

If you have any questions regarding this matter, I can be reached by phone at (301) 415-7352 or via e-mail at Tyrone.Naquin@nrc.gov.

Sincerely,

/RA Robert Johnson Acting for/

Tyrone D. Naquin, Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards

Enclosure:

As stated Docket Nos.

70-1113 50-73 72-1 70-2872 50-70 70-754 50-18 50-183 License Nos.

SNM-1097 TR-1 SNM-2500 SNM-1826 DR-10 DPR-1 R-33 SNM-960

ML16273A548 OFC FCSE/FMB FCSE/FMB FCSE/FMB FCSE/FMB NAME TNaquin TBrockington RJohnson TNaquin (RJohnson for)

DATE 09/28/2016 10/03/2016 10/05/2016 10/5/2016