ML16272A164

From kanterella
Jump to navigation Jump to search
Us Dept. of Interior, Geological Survey (Usgs), Notification of Permanent Reactor Supervisor Hiring Update
ML16272A164
Person / Time
Site: U.S. Geological Survey
Issue date: 09/16/2016
From: Nuccio V
US Dept of Interior, Geological Survey (USGS)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16272A164 (1)


Text

United States Department of the Interior U.S. GEOLOGICAL SURVEY TAKE PRIDE:"

Box 25046 MS-974 *NA_MERICA Denver, CO ~0225 September 16, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Sirs:

This is to notify you that Brycen Roy has been hired as permanent Reactor Supervisor at the U.S.

Geological Survey (USGS) TRIGA reactor facility. Mr. Roy had been the interim Reactor Supervisor since July 24, 2016. His permanent status is effective September 15, 2016. Mr. Roy graduated from the Colorado School of Mines in-2009 with a Master's Degree in Material Science.

He has 9 years of experience at the USGS facility.

Mr. Roy's contact information is shown below, and because he had been the interim Reactor Supervisor, his contact information will not change.

Phone:303-236-4726 Fax: 303-236-4717 Email: broy@usgs.gov Mail: Brycen Roy PO Box 25046 MS 974 Denver Federal Center Denver, CO 80225-0046 If you have any questions regarding this matter, please contact me at (3 03) 23 6-1654.

Sincerely, Vito Nuccio USGS Reactor Administrator Copy to:

Geoffrey Wertz, NRC Project Manager Mike Morlang, NRC Facility Inspector USGS Reactor Operations Committee GSTR Staff